Softwr

Construction · head to head

Newforma vs Oracle Primavera Unifier

Newforma logo

Newforma

Construction

Project information management system for construction

From
$300/month
Rated
-
Oracle Primavera Unifier logo

Oracle Primavera Unifier

Construction

Capital programme cost, contract and facilities management for owners running multi-year portfolios

From
On request
Rated
-

The short version

  • Each has a real cost: Newforma pricing is by quote only, with no rate, tier or minimum published; the site offers only Book a Demo and Get Started; Oracle Primavera Unifier nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • They diverge on capability: Newforma covers Project collaboration, Oracle Primavera Unifier covers uDesigner configuration.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Newforma and Oracle Primavera Unifier actually diverge.

Attributes where Newforma and Oracle Primavera Unifier differ
AttributeNewformaOracle Primavera Unifier
Starting price$300/monthOn request
Pricing modelsubscriptionquote
Founded2006Unknown

Identical on both: free tier (No), platforms (Web, Ios, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Newforma

  • Project collaboration
  • Transmittals
  • RFI tracking
  • Issue management
  • Autodesk BIM 360
  • Box
  • Dropbox
  • Microsoft 365

Only in Oracle Primavera Unifier

  • uDesigner configuration
  • Cost sheet
  • Funding management
  • Change management
  • Facilities and asset management
  • Schedule integration
  • Reporting and BI Publisher

Both cover

  • Document management

What people use each for

The jobs each tool is most often brought in to do.

Newforma

  • Managing project email, documents and submittals for architecture and engineering firmsnot Oracle Primavera Unifier
  • Keeping construction project information on-premises for control and security through Project Centernot Oracle Primavera Unifier
  • Coordinating issues and RFIs across design and construction teams in Konektnot Oracle Primavera Unifier

Oracle Primavera Unifier

  • A state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detailnot Newforma
  • A university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyednot Newforma
  • A utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarternot Newforma
  • An owner already committed to Primavera P6 and Aconex that wants cost and contract control in the same estate rather than adding a separate construction ERPnot Newforma

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Newforma

  • Pricing is by quote only, with no rate, tier or minimum published; the site offers only Book a Demo and Get Started
  • The cloud product Konekt and the on-premises product Project Center are separate offerings, so the on-premises option requires a different product rather than a deployment setting

Oracle Primavera Unifier

  • Nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • Modules are licensed separately, so an organisation that starts with Project Controls and later wants facilities and asset management faces a second negotiation at whatever list price applies then, not the rate it originally agreed.
  • Per-user licensing punishes occasional participants: a project sponsor who approves four invoices a year consumes the same licence as a full-time cost controller unless workflows are redesigned to keep them out of the system.
  • Oracle's term licence pricing is a percentage of the perpetual list rising with duration, which means a one-year term looks affordable and then the renewal maths pushes buyers into long commitments they cannot easily exit.
  • The interface is dated relative to modern construction software and field users resist it, so many implementations end up with Unifier as an office system and a separate mobile tool for site, which reintroduces the data gap it was bought to close.

Pricing, plan by plan

Newforma

$300/month
  • Standard$300/month
    • Document management
    • Project collaboration
    • Transmittals
  • EnterpriseFree
    • Advanced workflows
    • Custom reporting
    • API access

Oracle Primavera Unifier

On request
  • Unifier Project Controls$undefined/year
    • Per-user licensing
    • Cost, contract and change management
    • uDesigner business process configuration
  • Unifier Facilities and Asset Management$undefined/year
    • Separately licensed module
    • Asset register and maintenance
    • Space and portfolio management

Which should you pick?

Choose Newforma if

  • You need project collaboration.
  • You work on Web, Ios, Android.
  • You also want transmittals.

Choose Oracle Primavera Unifier if

  • You need udesigner configuration.
  • You work on Web, iOS, Android.
  • You also want cost sheet.

Questions people ask

Is Newforma or Oracle Primavera Unifier better?
Neither clearly leads. Newforma starts at $300/month and Oracle Primavera Unifier at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Newforma or Oracle Primavera Unifier?
Newforma starts at $300/month and Oracle Primavera Unifier at On request.
Does Newforma or Oracle Primavera Unifier run on more platforms?
Newforma runs on Web, Ios, Android. Oracle Primavera Unifier runs on Web, iOS, Android.
What is Newforma best used for?
Newforma is most often used for managing project email, documents and submittals for architecture and engineering firms, keeping construction project information on-premises for control and security through project center, coordinating issues and rfis across design and construction teams in konekt. Of those, managing project email, documents and submittals for architecture and engineering firms and keeping construction project information on-premises for control and security through project center are not what Oracle Primavera Unifier is typically brought in for.
What can Newforma do that Oracle Primavera Unifier cannot?
Newforma covers Project collaboration, Transmittals, RFI tracking, Issue management. Oracle Primavera Unifier covers uDesigner configuration, Cost sheet, Funding management, Change management. Both handle Document management.

Answered from the vendors’ own pages

Newforma: What is Newforma pricing?

Newforma does not publish pricing on its website. The company offers three product offerings: Newforma Konekt, Newforma Project Center, and Newforma ConstructEx. Customers must book a demo or contact the company directly for custom pricing.

Source
Oracle Primavera Unifier: Does Oracle publish Unifier pricing?

No. Unifier is quoted per user and per module through Oracle or a partner. Global price lists exist for some Primavera products but Unifier is negotiated.

Oracle Primavera Unifier: Is Unifier the same as Primavera P6?

No. P6 is scheduling. Unifier is cost, contract, change and asset management. Owners commonly run both and integrate them.

Oracle Primavera Unifier: Can we still buy a perpetual licence?

Yes, perpetual licensing remains available alongside term licences, and Oracle prices terms as a percentage of the perpetual list. Check which your quote is based on.

Oracle Primavera Unifier: Who owns the data at project closeout?

The customer owns its data. Export is possible through the API and reporting layer, but configured business process records do not move cleanly into another system, so plan closeout extraction before you need it.

Oracle Primavera Unifier: Is it suitable for a general contractor?

Rarely. Unifier is built around the owner's funding and contract position. Contractors are usually better served by Procore or Autodesk Construction Cloud.

Share

Related pages

Other head to heads