Softwr

Construction · pricing

Oracle Primavera Unifier pricing

Oracle Primavera Unifier publishes 2 tiers. Below is each one, what it adds over the tier beneath it, and where the ladder stops being worth climbing for most people.

As of 1 September 2026, Oracle Primavera Unifier pricing is on request across 2 published tiers. Figures are the vendor's list prices as recorded on this page's last check; the vendor's site is the final word.

Entry price
On request
Model
Quote
Tiers
2
Free tier
Not on record

Oracle Primavera Unifier plans, side by side

Every published tier in ascending order of price, with the number of features each one lists. An absence here means the record does not itemise it, not that the tier lacks it.

Oracle Primavera Unifier pricing tiers
PlanPriceFeatures listedStep up from the tier below
Unifier Project ControlsOn request4Entry tier
Unifier Facilities and Asset ManagementOn request4Priced on request

What each tier adds

The set difference between each tier's feature list and the one beneath it. Where a tier lists nothing new, the vendor has either stopped repeating the inherited list or the tier raises limits rather than adding capability, the record does not distinguish the two, so this page does not either.

Unifier Project Controls

On request

The entry tier. It covers per-user licensing, cost, contract and change management, udesigner business process configuration, term or perpetual licence.

Unifier Facilities and Asset Management

On request

Over Unifier Project Controls, this tier adds:

  • Separately licensed module
  • Asset register and maintenance
  • Space and portfolio management

What the product covers

The full Oracle Primavera Unifier feature record, grouped as the catalogue groups it. This is the product as a whole; the record does not map every feature onto a specific tier.

Other

  • uDesigner configuration
  • Cost sheet
  • Funding management
  • Change management
  • Facilities and asset management
  • Schedule integration
  • Document management
  • Reporting and BI Publisher

People bring Oracle Primavera Unifier in for a state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detail, a university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyed, a utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarter, an owner already committed to primavera p6 and aconex that wants cost and contract control in the same estate rather than adding a separate construction erp. If that is not the job you are buying for, the alternatives to Oracle Primavera Unifier are worth a look before you commit to a tier.

How that compares in Construction

Too few construction tools in this directory publish a starting price to quote a meaningful median, so the table below is a like-for-like list rather than a ranking.

Oracle Primavera Unifier entry price against other Construction tools
ToolEntry priceModelRatedHead to head
Oracle Primavera Unifier (this page)On requestquote-
BuildotsOn requestquote-vs Oracle Primavera Unifier
AdaptiveOn requestquote-vs Oracle Primavera Unifier
Handoff$119/monthPer company per month-vs Oracle Primavera Unifier
SitemarkOn requestquote-vs Oracle Primavera Unifier
GCPayOn requestquote-vs Oracle Primavera Unifier
ALICE TechnologiesOn requestquote-vs Oracle Primavera Unifier

Ratings are aggregated from third-party sources and imported with each catalogue entry, they are not reviews hosted on Softwr. How each figure is used is set out on the Oracle Primavera Unifier badges page.

Before you pay for Oracle Primavera Unifier

Three things this page cannot tell you, and all three change the bill. The record carries a price and a billing period but not the unit - per-seat and flat-rate pricing are indistinguishable in this data, so a five-person team may be looking at five times the figure above. It carries no annual rate, so any discount for paying yearly is not something this page can quote. And it carries no trial length.

What it can tell you is the shape of the ladder: 2 tiers between On request and On request, with the jump itemised above. With no free tier on record, the cheapest way to answer the rest is to compare Oracle Primavera Unifier against the tools that do have one before committing.

Oracle Primavera Unifier runs on web, ios, android, and is published by Oracle Corporation of Austin, Texas, United States. The full record is on the Oracle Primavera Unifier review, and the rest of the category is under best construction tools.

Oracle Primavera Unifier pricing on the vendor's own site

Oracle Primavera Unifier pricing questions

How much does Oracle Primavera Unifier cost?
Oracle Primavera Unifier publishes 2 tiers, from On request for Unifier Project Controls up to On request for Unifier Facilities and Asset Management. The cheapest paid tier is On request.
Does Oracle Primavera Unifier have a free plan?
Not on the record we hold: Oracle Primavera Unifier is listed as quote. Whether a free trial is offered is not something this record captures, so check the vendor's site.
What is the difference between Unifier Project Controls and Unifier Facilities and Asset Management on Oracle Primavera Unifier?
Unifier Facilities and Asset Management costs On request against On request, and adds separately licensed module, asset register and maintenance, space and portfolio management.
What am I actually paying for with Oracle Primavera Unifier?
The record lists 8 features across 1 area: other. In practice it is brought in for a state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detail, a university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyed, a utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarter.
Does Oracle Primavera Unifier charge per user?
The record carries a price and a billing period for each of its 2 tiers, but not the unit that price is charged in. Per-seat and flat-rate billing look identical in this data, so check the vendor's page before budgeting for a team.
Are these Oracle Primavera Unifier prices current?
They are what the catalogue entry holds, refreshed when the entry is. Vendors change pricing without notice and nobody at Softwr re-verifies each tier by hand, so treat this as a structured summary and the vendor's own pricing page as the authority.
What should I compare Oracle Primavera Unifier against before paying?
The closest construction tools in this directory are Buildots, Adaptive, Handoff, Sitemark. Each has a side-by-side comparison with Oracle Primavera Unifier covering price, platforms and features.

Related pages