Softwr

Construction · head to head

Kahua vs Oracle Primavera Unifier

Kahua logo

Kahua

Construction

Cloud platform for construction and capital projects

From
$400/month
Rated
-
Oracle Primavera Unifier logo

Oracle Primavera Unifier

Construction

Capital programme cost, contract and facilities management for owners running multi-year portfolios

From
On request
Rated
-

The short version

  • Each has a real cost: Kahua no standard pricing tiers published; all pricing is custom and quote-based; Oracle Primavera Unifier nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • They diverge on capability: Kahua covers Project management, Oracle Primavera Unifier covers uDesigner configuration.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Kahua and Oracle Primavera Unifier actually diverge.

Attributes where Kahua and Oracle Primavera Unifier differ
AttributeKahuaOracle Primavera Unifier
Starting price$400/monthOn request
Pricing modelsubscriptionquote
Founded2007Unknown

Identical on both: free tier (No), platforms (Web, Ios, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Kahua

  • Project management
  • Document control
  • Collaboration
  • Issue tracking
  • Reporting
  • Microsoft 365
  • Slack
  • Box

Only in Oracle Primavera Unifier

  • uDesigner configuration
  • Cost sheet
  • Funding management
  • Change management
  • Facilities and asset management
  • Schedule integration
  • Document management
  • Reporting and BI Publisher

What people use each for

The jobs each tool is most often brought in to do.

Kahua

  • Acting as the system of record for a capital construction program across the asset lifecyclenot Oracle Primavera Unifier
  • Public agencies and program managers tracking portfolios of projectsnot Oracle Primavera Unifier
  • General contractors standardising project delivery and cost control across active projectsnot Oracle Primavera Unifier
  • Specialty contractors managing crews, work orders and project financialsnot Oracle Primavera Unifier

Oracle Primavera Unifier

  • A state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detailnot Kahua
  • A university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyednot Kahua
  • A utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarternot Kahua
  • An owner already committed to Primavera P6 and Aconex that wants cost and contract control in the same estate rather than adding a separate construction ERPnot Kahua

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Kahua

  • No standard pricing tiers published; all pricing is custom and quote-based
  • Pricing varies by organization type, program or construction scale, selected package, and deployment environment
  • Implementation costs for data migration, integrations, training, and configuration scoped separately and included in quote

Oracle Primavera Unifier

  • Nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • Modules are licensed separately, so an organisation that starts with Project Controls and later wants facilities and asset management faces a second negotiation at whatever list price applies then, not the rate it originally agreed.
  • Per-user licensing punishes occasional participants: a project sponsor who approves four invoices a year consumes the same licence as a full-time cost controller unless workflows are redesigned to keep them out of the system.
  • Oracle's term licence pricing is a percentage of the perpetual list rising with duration, which means a one-year term looks affordable and then the renewal maths pushes buyers into long commitments they cannot easily exit.
  • The interface is dated relative to modern construction software and field users resist it, so many implementations end up with Unifier as an office system and a separate mobile tool for site, which reintroduces the data gap it was bought to close.

Pricing, plan by plan

Kahua

$400/month
  • Professional$400/month
    • Project management
    • Document control
    • Collaboration
  • EnterpriseFree
    • Advanced analytics
    • Custom workflows
    • API access

Oracle Primavera Unifier

On request
  • Unifier Project Controls$undefined/year
    • Per-user licensing
    • Cost, contract and change management
    • uDesigner business process configuration
  • Unifier Facilities and Asset Management$undefined/year
    • Separately licensed module
    • Asset register and maintenance
    • Space and portfolio management

Which should you pick?

Choose Kahua if

  • You need project management.
  • You work on Web, Ios, Android.
  • You also want document control.

Choose Oracle Primavera Unifier if

  • You need udesigner configuration.
  • You work on Web, iOS, Android.
  • You also want cost sheet.

Questions people ask

Is Kahua or Oracle Primavera Unifier better?
Neither clearly leads. Kahua starts at $400/month and Oracle Primavera Unifier at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Kahua or Oracle Primavera Unifier?
Kahua starts at $400/month and Oracle Primavera Unifier at On request.
Does Kahua or Oracle Primavera Unifier run on more platforms?
Kahua runs on Web, Ios, Android. Oracle Primavera Unifier runs on Web, iOS, Android.
What is Kahua best used for?
Kahua is most often used for acting as the system of record for a capital construction program across the asset lifecycle, public agencies and program managers tracking portfolios of projects, general contractors standardising project delivery and cost control across active projects, specialty contractors managing crews, work orders and project financials. Of those, acting as the system of record for a capital construction program across the asset lifecycle and public agencies and program managers tracking portfolios of projects are not what Oracle Primavera Unifier is typically brought in for.
What can Kahua do that Oracle Primavera Unifier cannot?
Kahua covers Project management, Document control, Collaboration, Issue tracking. Oracle Primavera Unifier covers uDesigner configuration, Cost sheet, Funding management, Change management.

Answered from the vendors’ own pages

Kahua: How much does Kahua cost?

Kahua does not publish standard pricing. Costs vary by organization type (Owners/Program Managers, General Contractors, Specialty Contractors), program scale, selected package, deployment environment, and implementation requirements. Customers must request pricing quotes.

Source
Oracle Primavera Unifier: Does Oracle publish Unifier pricing?

No. Unifier is quoted per user and per module through Oracle or a partner. Global price lists exist for some Primavera products but Unifier is negotiated.

Kahua: What package options does Kahua offer?

Kahua offers three main package categories: Owners and Program Managers, General Contractors, and Specialty Contractors. Additional specialty apps and suites including capital planning, analytics, asset management, and safety can extend the base solution.

Source
Oracle Primavera Unifier: Is Unifier the same as Primavera P6?

No. P6 is scheduling. Unifier is cost, contract, change and asset management. Owners commonly run both and integrate them.

Kahua: Are implementation and integration costs included in Kahua pricing?

Implementation details including data migration, integrations, training, and configuration are scoped based on requirements and clearly identified in the custom quote provided.

Source
Oracle Primavera Unifier: Can we still buy a perpetual licence?

Yes, perpetual licensing remains available alongside term licences, and Oracle prices terms as a percentage of the perpetual list. Check which your quote is based on.

Oracle Primavera Unifier: Who owns the data at project closeout?

The customer owns its data. Export is possible through the API and reporting layer, but configured business process records do not move cleanly into another system, so plan closeout extraction before you need it.

Oracle Primavera Unifier: Is it suitable for a general contractor?

Rarely. Unifier is built around the owner's funding and contract position. Contractors are usually better served by Procore or Autodesk Construction Cloud.

Share

Related pages

Other head to heads