Softwr

Construction · head to head

Dalux vs Oracle Primavera Unifier

Dalux logo

Dalux

Construction

BIM viewing, snagging and field quality control for construction and facilities teams

From
Free
Rated
-
Oracle Primavera Unifier logo

Oracle Primavera Unifier

Construction

Capital programme cost, contract and facilities management for owners running multi-year portfolios

From
On request
Rated
-

The short version

  • Only Dalux has a free tier, so it costs nothing to try first.
  • Each has a real cost: Dalux no pricing is published for any paid module, so comparing Dalux against Procore or Autodesk Construction Cloud on cost requires entering a sales process and waiting for a quote you cannot benchmark.; Oracle Primavera Unifier nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • They diverge on capability: Dalux covers Mobile BIM viewer, Oracle Primavera Unifier covers uDesigner configuration.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Dalux and Oracle Primavera Unifier actually diverge.

Attributes where Dalux and Oracle Primavera Unifier differ
AttributeDaluxOracle Primavera Unifier
Starting priceFreeOn request
Free tierYesNo
PlatformsWeb, iOS, Android, WindowsWeb, iOS, Android

Identical on both: pricing model (quote), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Dalux

  • Mobile BIM viewer
  • Field snagging
  • Dalux Box
  • InfraField
  • Dalux FM
  • Handover
  • Checklists and forms
  • Free viewer tier

Only in Oracle Primavera Unifier

  • uDesigner configuration
  • Cost sheet
  • Funding management
  • Change management
  • Facilities and asset management
  • Schedule integration
  • Document management
  • Reporting and BI Publisher

What people use each for

The jobs each tool is most often brought in to do.

Dalux

  • A Nordic main contractor wants every subcontractor raising and closing snags in one system without paying a seat fee for each trade, so the free Field Basic tier carries the supply chain.not Oracle Primavera Unifier
  • An engineering consultancy needs site staff to interrogate a federated model on a phone in a basement with no signal, where a browser-based viewer would be useless.not Oracle Primavera Unifier
  • A public asset owner wants the as-built model and asset register to survive handover into an FM system rather than arriving as a pallet of ring binders.not Oracle Primavera Unifier
  • A rail or highways contractor needs quality records located by chainage along a route rather than by level and grid on a building floor plan, which is what InfraField exists for.not Oracle Primavera Unifier

Oracle Primavera Unifier

  • A state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detailnot Dalux
  • A university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyednot Dalux
  • A utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarternot Dalux
  • An owner already committed to Primavera P6 and Aconex that wants cost and contract control in the same estate rather than adding a separate construction ERPnot Dalux

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Dalux

  • No pricing is published for any paid module, so comparing Dalux against Procore or Autodesk Construction Cloud on cost requires entering a sales process and waiting for a quote you cannot benchmark.
  • There is no cost management, estimating, budgeting or payment application functionality, so commercial teams keep a separate system and someone reconciles the two by hand.
  • The integration catalogue is thin next to the American incumbents, and ERP or finance connections generally mean custom work through the API rather than a listed connector.
  • Support, documentation and product terminology are strongest in Danish and Northern European construction conventions, and teams working to AIA or other North American contract norms will find the workflows do not map cleanly.
  • The free tier is deliberately limited: Field Basic has no checklists, no document control and no reporting, so the free users your subcontractors get are consumers of information rather than participants in a controlled process, and upgrading them is a paid conversation.

Oracle Primavera Unifier

  • Nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • Modules are licensed separately, so an organisation that starts with Project Controls and later wants facilities and asset management faces a second negotiation at whatever list price applies then, not the rate it originally agreed.
  • Per-user licensing punishes occasional participants: a project sponsor who approves four invoices a year consumes the same licence as a full-time cost controller unless workflows are redesigned to keep them out of the system.
  • Oracle's term licence pricing is a percentage of the perpetual list rising with duration, which means a one-year term looks affordable and then the renewal maths pushes buyers into long commitments they cannot easily exit.
  • The interface is dated relative to modern construction software and field users resist it, so many implementations end up with Unifier as an office system and a separate mobile tool for site, which reintroduces the data gap it was bought to close.

Pricing, plan by plan

Dalux

Free
  • BIM Viewer and Field Basic$undefined/year
    • Federated model viewing on desktop and mobile
    • Basic snagging against drawings and BIM
    • Unlimited invited project members at no cost
  • Dalux Field, Box, InfraField, Handover, FM$undefined/year
    • Full quality, safety and document control workflows
    • Handover and tender modules
    • Facilities management on the as-built model

Oracle Primavera Unifier

On request
  • Unifier Project Controls$undefined/year
    • Per-user licensing
    • Cost, contract and change management
    • uDesigner business process configuration
  • Unifier Facilities and Asset Management$undefined/year
    • Separately licensed module
    • Asset register and maintenance
    • Space and portfolio management

Which should you pick?

Choose Dalux if

  • You need mobile bim viewer.
  • You want to start without paying.
  • You work on Web, iOS, Android, Windows.
  • You also want field snagging.

Choose Oracle Primavera Unifier if

  • You need udesigner configuration.
  • You work on Web, iOS, Android.
  • You also want cost sheet.

Questions people ask

Is Dalux or Oracle Primavera Unifier better?
Neither clearly leads. Dalux starts at Free and Oracle Primavera Unifier at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Dalux or Oracle Primavera Unifier?
Dalux has a free tier; the other does not. Paid plans start at Free for Dalux and On request for Oracle Primavera Unifier.
Does Dalux or Oracle Primavera Unifier run on more platforms?
Dalux runs on Web, iOS, Android, Windows. Oracle Primavera Unifier runs on Web, iOS, Android.
Can I use Dalux for free?
Yes. Dalux has a free tier, so you can try it without paying. Oracle Primavera Unifier starts at On request.
What is Dalux best used for?
Dalux is most often used for a nordic main contractor wants every subcontractor raising and closing snags in one system without paying a seat fee for each trade, so the free field basic tier carries the supply chain., an engineering consultancy needs site staff to interrogate a federated model on a phone in a basement with no signal, where a browser-based viewer would be useless., a public asset owner wants the as-built model and asset register to survive handover into an fm system rather than arriving as a pallet of ring binders., a rail or highways contractor needs quality records located by chainage along a route rather than by level and grid on a building floor plan, which is what infrafield exists for.. Of those, a nordic main contractor wants every subcontractor raising and closing snags in one system without paying a seat fee for each trade, so the free field basic tier carries the supply chain. and an engineering consultancy needs site staff to interrogate a federated model on a phone in a basement with no signal, where a browser-based viewer would be useless. are not what Oracle Primavera Unifier is typically brought in for.
What can Dalux do that Oracle Primavera Unifier cannot?
Dalux covers Mobile BIM viewer, Field snagging, Dalux Box, InfraField. Oracle Primavera Unifier covers uDesigner configuration, Cost sheet, Funding management, Change management.

Answered from the vendors’ own pages

Dalux: Is Dalux really free?

BIM Viewer and Field Basic are genuinely free with unlimited invited users. Dalux Box, the full Field product, InfraField, Handover, Tender and FM are paid and quoted privately.

Oracle Primavera Unifier: Does Oracle publish Unifier pricing?

No. Unifier is quoted per user and per module through Oracle or a partner. Global price lists exist for some Primavera products but Unifier is negotiated.

Dalux: Does Dalux work offline on site?

Yes. Models, drawings and snags sync to the device and the mobile apps are built to work in basements and lift shafts, syncing when signal returns.

Oracle Primavera Unifier: Is Unifier the same as Primavera P6?

No. P6 is scheduling. Unifier is cost, contract, change and asset management. Owners commonly run both and integrate them.

Dalux: Can Dalux replace Procore?

Not on the commercial side. It covers field quality, safety, documents and handover, but has no cost control, budgets or payment applications.

Oracle Primavera Unifier: Can we still buy a perpetual licence?

Yes, perpetual licensing remains available alongside term licences, and Oracle prices terms as a percentage of the perpetual list. Check which your quote is based on.

Dalux: Is it available outside Europe?

It is sold globally and the apps are multilingual, but the customer base, partner network and support hours are centred on Northern Europe.

Oracle Primavera Unifier: Who owns the data at project closeout?

The customer owns its data. Export is possible through the API and reporting layer, but configured business process records do not move cleanly into another system, so plan closeout extraction before you need it.

Oracle Primavera Unifier: Is it suitable for a general contractor?

Rarely. Unifier is built around the owner's funding and contract position. Contractors are usually better served by Procore or Autodesk Construction Cloud.

Share

Related pages

Other head to heads