Hard hat mounted 360 cameras and computer vision that score build progress against the BIM model
- From
- On request
- Rated
- -

GCPay
Construction
Subcontractor pay application and lien waiver exchange for general contractors in North America
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Buildots tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.; GCPay the subcontractor is a compelled user who did not choose the tool, so adoption friction and support load fall on the general contractor, and small trades with one bookkeeper resent every extra portal.
- They diverge on capability: Buildots covers Hard hat 360 capture, GCPay covers Pay application workflow.
- Prices and features above were last checked on 1 September 2026.
Where they differ
Only the attributes on which Buildots and GCPay actually diverge.
Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Buildots
- Hard hat 360 capture
- Model to as-built comparison
- Per activity progress scoring
- Programme deviation alerts
- Delay forecasting
- Visual evidence trail
- Subcontractor performance reporting
Only in GCPay
- Pay application workflow
- Lien waiver exchange
- Compliance tracking
- Change order management
- ePayments
- Retainage handling
- ERP integration
- Subcontractor portal
What people use each for
The jobs each tool is most often brought in to do.
Buildots
- A residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle timenot GCPay
- A hospital or data centre fit-out where MEP first fix progress is disputed between the main contractor and trades every monthnot GCPay
- A developer that wants independent progress evidence before certifying an interim payment applicationnot GCPay
- A contractor building a production rate history across projects so future programmes are based on measured output rather than assumptionnot GCPay
GCPay
- A general contractor in a strict lien state that has been burned by a missing unconditional waiver and needs waiver status tied to each payment rather than filed in a shared drivenot Buildots
- A contractor whose accounts payable team spends the first week of every month rekeying pay applications from PDF emails into Sage or Viewpointnot Buildots
- An owner-facing GC that must produce a clean audit trail of who was paid what and when, with insurance compliance evidence attachednot Buildots
- A construction group standardising on Autodesk Construction Cloud that wants payment application data in the same estate as the project recordnot Buildots
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Buildots
- Tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.
- The data only arrives if someone walks the site every week with the camera, so coverage decays quietly when the site team is under pressure, exactly when the reporting is most needed.
- Pricing is per project rather than per seat and includes hardware, so a contractor cannot roll it out cheaply across a portfolio of small jobs and it is uneconomic below a certain project value.
- It reads interior fit-out and repetitive vertical work far better than structure, groundworks or external envelope, so a large fraction of a project's programme is outside what it can score.
- Making progress objective creates commercial friction with subcontractors whose valuations have historically been negotiated, and contractors who deploy it without addressing that in the subcontract get pushback rather than adoption.
GCPay
- The subcontractor is a compelled user who did not choose the tool, so adoption friction and support load fall on the general contractor, and small trades with one bookkeeper resent every extra portal.
- Pricing is entirely quoted and keyed to annual subcontracted construction value, which means a contractor with a few very large subcontracts can pay far more than one with many small ones for identical functionality.
- The ePayment fee structure is decided per general contractor, so a subcontractor cannot predict its cost of getting paid across clients and may be charged on one job and not another for the same work.
- It is a payment and compliance system, not job costing; commitments still have to reconcile against the ERP, and integration gaps mean many contractors run a manual check anyway.
- Autodesk acquired parent Payapps in 2024, and the strategic direction is convergence with Autodesk Construction Cloud, so buyers on Procore or a non-Autodesk stack should ask directly what the roadmap commitment to their platform is.
Pricing, plan by plan
Buildots
On request- Buildots$undefined/year
- Priced per project by size and duration
- Camera hardware included in the engagement
- Model onboarding and setup quoted separately
GCPay
On request- GCPay for General Contractors$undefined/year
- Priced on project count, subcontractor count and annual subcontracted volume
- Unlimited free subcontractor accounts
- Lien waiver and compliance tracking
- ePayments and Waiver Exchange$undefined/month
- Per-transaction fee disclosed at submission
- General contractor may absorb the fee or pass it to the subcontractor
- Subcontractor must acknowledge the fee before submitting
Which should you pick?
Choose Buildots if
- You need hard hat 360 capture.
- You work on Web, iOS, Android.
- You also want model to as-built comparison.
Questions people ask
- Is Buildots or GCPay better?
- Neither clearly leads. Buildots starts at On request and GCPay at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Buildots or GCPay?
- Buildots starts at On request and GCPay at On request.
- Does Buildots or GCPay run on more platforms?
- Buildots runs on Web, iOS, Android. GCPay runs on Web.
- What is Buildots best used for?
- Buildots is most often used for a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time, a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month, a developer that wants independent progress evidence before certifying an interim payment application, a contractor building a production rate history across projects so future programmes are based on measured output rather than assumption. Of those, a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time and a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month are not what GCPay is typically brought in for.
- What can Buildots do that GCPay cannot?
- Buildots covers Hard hat 360 capture, Model to as-built comparison, Per activity progress scoring, Programme deviation alerts. GCPay covers Pay application workflow, Lien waiver exchange, Compliance tracking, Change order management.
Answered from the vendors’ own pages
Buildots: What does Buildots cost?
It is quoted per project based on size, duration and scope, with camera hardware included. Nothing is published.
GCPay: Who pays for GCPay, the GC or the sub?
The general contractor pays the subscription. Subcontractor accounts are free. Only the optional ePayment and waiver exchange transaction fee can be passed to the subcontractor, and only with their acknowledgement.
Buildots: Do I need a BIM model?
Yes. The system scores progress by comparing captured conditions against model objects, so the model quality sets the ceiling on accuracy.
GCPay: How much is the ePayment fee?
It is a flat per-transaction fee, disclosed at the point the pay application is submitted. GCPay has published a $15 figure for the ePayments and waiver exchange service, and the GC decides who bears it.
Buildots: What kind of projects suit it?
Repetitive vertical work with heavy interior fit-out. Civil, groundworks and external envelope are poorly covered.
GCPay: Is GCPay owned by Autodesk?
Yes. Autodesk agreed to acquire Payapps, which trades as GCPay in North America and Payapps elsewhere, in January 2024.
Buildots: Who does the site walks?
Your own site team, typically once or twice a week. There is no Buildots operator on site.
GCPay: Does it replace our construction accounting system?
No. It handles the application, approval and compliance workflow and then pushes approved payments into your ERP.
GCPay: Can subcontractors export their own records?
Subcontractors can download their submitted applications and waivers, but the project record belongs to the general contractor's account, so a sub should keep its own copies rather than rely on continued portal access.
Related pages
Other head to heads
- Buildots vs Openspace
- Buildots vs Procore
- Buildots vs Reconstruct
- Buildots vs Dalux
- Buildots vs RIB CostX
- Buildots vs Autodesk Revit
- Buildots vs HCSS HeavyBid
- Buildots vs Oracle Primavera Unifier
- Buildots vs Togal.AI
- Buildots vs BricsCAD BIM
- Buildots vs Cubit Estimating
- Buildots vs Skydio Dock for X10
- Buildots vs Viewpoint Vista
- Buildots vs Briq
- Buildots vs Buildertrend
- Buildots vs ConstructConnect
- Buildots vs BuildingConnected
- Buildots vs Foundation Software
- Buildots vs Oracle Textura Payment Management
- Buildots vs Trimble Pay
- Buildots vs Assignar
- Buildots vs Siteline
- Buildots vs Clearstory
- Buildots vs Kojo
- Buildots vs Adaptive
- Buildots vs Document Crunch
- Buildots vs HammerTech
- Buildots vs Buildxact
- Buildots vs Chief Architect
- Buildots vs CMiC
- Buildots vs CoConstruct
- GCPay vs Openspace
- GCPay vs Procore
- GCPay vs Reconstruct
- GCPay vs Dalux
- GCPay vs RIB CostX
- GCPay vs Autodesk Revit
- GCPay vs HCSS HeavyBid
- GCPay vs Oracle Primavera Unifier
- GCPay vs Togal.AI
- GCPay vs BricsCAD BIM
- GCPay vs Cubit Estimating
- GCPay vs Skydio Dock for X10
- GCPay vs Viewpoint Vista
- GCPay vs Briq
- GCPay vs Buildertrend
- GCPay vs ConstructConnect
- GCPay vs BuildingConnected
- GCPay vs Foundation Software
- GCPay vs Oracle Textura Payment Management
- GCPay vs Trimble Pay
- GCPay vs Assignar
- GCPay vs Siteline
- GCPay vs Clearstory
- GCPay vs Kojo
- GCPay vs Adaptive
- GCPay vs Document Crunch
- GCPay vs HammerTech
- GCPay vs Buildxact
- GCPay vs Chief Architect
- GCPay vs CMiC
- GCPay vs CoConstruct