Buildots vs Reconstruct

Buildots logo

Buildots

Construction

Hard hat mounted 360 cameras and computer vision that score build progress against the BIM model

From
On request
Rated
-
Reconstruct logo

Reconstruct

Construction

Reality capture and progress tracking that aligns site imagery to the model and the schedule

From
On request
Rated
-

The short version

  • Each has a real cost: Buildots tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.; Reconstruct pricing is quoted with nothing published, so a buyer cannot sanity-check a proposal against a list rate and has no way to know whether the price scales with projects, square footage or users until deep in the sales process.
  • They diverge on capability: Buildots covers Hard hat 360 capture, Reconstruct covers Device-agnostic capture.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Buildots and Reconstruct actually diverge.

Attributes where Buildots and Reconstruct differ
AttributeBuildotsReconstruct

Identical on both: starting price (On request), pricing model (quote), free tier (No), platforms (Web, iOS, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Buildots

  • Hard hat 360 capture
  • Model to as-built comparison
  • Per activity progress scoring
  • Programme deviation alerts
  • Delay forecasting
  • Visual evidence trail
  • Subcontractor performance reporting

Only in Reconstruct

  • Device-agnostic capture
  • Photogrammetry and mesh generation
  • 4D schedule alignment
  • Design overlay
  • Time slider
  • Measurement tools
  • Issue tracking
  • Remote walkthrough

What people use each for

The jobs each tool is most often brought in to do.

Buildots

  • A residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle timenot Reconstruct
  • A hospital or data centre fit-out where MEP first fix progress is disputed between the main contractor and trades every monthnot Reconstruct
  • A developer that wants independent progress evidence before certifying an interim payment applicationnot Reconstruct
  • A contractor building a production rate history across projects so future programmes are based on measured output rather than assumptionnot Reconstruct

Reconstruct

  • A general contractor whose monthly progress claim is regularly challenged by the owner, needing dated visual evidence tied to schedule activities rather than a folder of photosnot Buildots
  • An owner running projects in several countries who wants to cut executive site visits without accepting the contractor’s self-reported percentage completenot Buildots
  • A healthcare or data centre fit-out where above-ceiling services must be recorded before they are closed up, so later maintenance does not require demolitionnot Buildots
  • A delay or defect dispute where the decisive question is what was physically in place on a specific date and the only other evidence is contested emailnot Buildots

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Buildots

  • Tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.
  • The data only arrives if someone walks the site every week with the camera, so coverage decays quietly when the site team is under pressure, exactly when the reporting is most needed.
  • Pricing is per project rather than per seat and includes hardware, so a contractor cannot roll it out cheaply across a portfolio of small jobs and it is uneconomic below a certain project value.
  • It reads interior fit-out and repetitive vertical work far better than structure, groundworks or external envelope, so a large fraction of a project's programme is outside what it can score.
  • Making progress objective creates commercial friction with subcontractors whose valuations have historically been negotiated, and contractors who deploy it without addressing that in the subcontract get pushback rather than adoption.

Reconstruct

  • Pricing is quoted with nothing published, so a buyer cannot sanity-check a proposal against a list rate and has no way to know whether the price scales with projects, square footage or users until deep in the sales process.
  • The whole value depends on disciplined recurring capture, and site teams treat walking the building with a camera as a low-priority chore, so datasets go stale exactly when a dispute makes them valuable.
  • Photogrammetry from handheld footage is less accurate than laser scanning, so it is fine for progress and coordination but should not be relied on for tight as-built tolerances or prefabrication dimensions.
  • Schedule alignment requires a well-structured schedule with activities that map to physical locations; on projects where the programme is a coarse rolled-up bar chart the progress calculation is close to meaningless.
  • It is another platform alongside Procore or Autodesk Construction Cloud rather than a replacement, so buyers add a subscription and a workflow rather than consolidating one, and the business case has to survive that.

Pricing, plan by plan

Buildots

On request
  • Buildots$undefined/year
    • Priced per project by size and duration
    • Camera hardware included in the engagement
    • Model onboarding and setup quoted separately

Reconstruct

On request
  • Reconstruct$undefined/year
    • Quoted per project or per portfolio
    • Unlimited capture devices
    • 4D schedule alignment

Which should you pick?

Choose Buildots if

  • You need hard hat 360 capture.
  • You work on Web, iOS, Android.
  • You also want model to as-built comparison.

Choose Reconstruct if

  • You need device-agnostic capture.
  • You work on Web, iOS, Android.
  • You also want photogrammetry and mesh generation.

Questions people ask

Is Buildots or Reconstruct better?
Neither clearly leads. Buildots starts at On request and Reconstruct at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Buildots or Reconstruct?
Buildots starts at On request and Reconstruct at On request.
Does Buildots or Reconstruct run on more platforms?
Both run on Web, iOS, Android, so platform support will not decide this one for you.
What is Buildots best used for?
Buildots is most often used for a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time, a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month, a developer that wants independent progress evidence before certifying an interim payment application, a contractor building a production rate history across projects so future programmes are based on measured output rather than assumption. Of those, a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time and a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month are not what Reconstruct is typically brought in for.
What can Buildots do that Reconstruct cannot?
Buildots covers Hard hat 360 capture, Model to as-built comparison, Per activity progress scoring, Programme deviation alerts. Reconstruct covers Device-agnostic capture, Photogrammetry and mesh generation, 4D schedule alignment, Design overlay.

Answered from the vendors’ own pages

Buildots: What does Buildots cost?

It is quoted per project based on size, duration and scope, with camera hardware included. Nothing is published.

Reconstruct: How much does Reconstruct cost?

Not published. It is quoted per project or portfolio. Ask specifically whether the price scales by project count, square footage or capture volume, because those give very different totals.

Buildots: Do I need a BIM model?

Yes. The system scores progress by comparing captured conditions against model objects, so the model quality sets the ceiling on accuracy.

Reconstruct: Do we need a drone or a laser scanner?

No. It works from 360 cameras and even smartphone video. Drones and scanners improve exterior and accuracy-critical coverage.

Buildots: What kind of projects suit it?

Repetitive vertical work with heavy interior fit-out. Civil, groundworks and external envelope are poorly covered.

Reconstruct: How accurate is it?

Accurate enough for progress, coordination and dispute evidence. It is not a substitute for survey-grade laser scanning where tolerances matter.

Buildots: Who does the site walks?

Your own site team, typically once or twice a week. There is no Buildots operator on site.

Reconstruct: Who owns the captured data at closeout?

The customer. Confirm the export format and retention terms in the contract before handover, because a reality archive is only useful if you can still open it in five years.

Reconstruct: Does it replace Procore?

No. It integrates with Procore and Autodesk Construction Cloud and adds the visual as-built layer.