B2W Estimate vs Kojo

B2W Estimate logo

B2W Estimate

Construction

Heavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices

From
On request
Rated
-
Kojo logo

Kojo

Construction

Materials procurement and inventory for speciality trade contractors

From
On request
Rated
-

The short version

  • Each has a real cost: B2W Estimate pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle; Kojo benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • They diverge on capability: B2W Estimate covers Production-rate estimating, Kojo covers Field material requests.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which B2W Estimate and Kojo actually diverge.

Attributes where B2W Estimate and Kojo differ
AttributeB2W EstimateKojo
PlatformsWindows, WebWeb, iOS, Android

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in B2W Estimate

  • Production-rate estimating
  • Central resource database
  • Concurrent bidding
  • DOT bid file export
  • Alternates and addenda
  • Field feedback loop
  • Bid analysis

Only in Kojo

  • Field material requests
  • Multi-supplier quoting
  • Purchase order management
  • Inventory and warehouse
  • Committed cost visibility
  • Enterprise resource planning integration

What people use each for

The jobs each tool is most often brought in to do.

B2W Estimate

  • A grading contractor bids a 40 million dollar DOT job and needs to test three crew configurations against the same quantities before the bid deadlinenot Kojo
  • A utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimatenot Kojo
  • An estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by handnot Kojo
  • A contractor moving off HeavyBid wants a resource database it can reuse across estimating, dispatch and fleet maintenancenot Kojo

Kojo

  • An electrical or mechanical contractor where materials are close to half of job cost and buying happens dailynot B2W Estimate
  • A trade contractor that cannot see committed material cost against a job until the invoice arrivesnot B2W Estimate
  • A contractor consolidating purchasing across branches to negotiate better distributor pricingnot B2W Estimate
  • A subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheetnot B2W Estimate

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

B2W Estimate

  • Pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle
  • The system is worthless until your own crews, equipment and production rates are loaded, which is typically several months of a senior estimator's time before the first bid comes out
  • It is aimed squarely at heavy civil self-performing work, so a general contractor whose bids are mostly subcontractor quotes gets very little from the production-rate engine
  • The Trimble acquisition means the product now competes internally with other Trimble civil estimating assets, and buyers should ask directly about the long term roadmap for overlapping products before signing a multi-year term
  • Reporting outside the Inform module is limited, so organisations that want bid analytics across years typically end up buying another module or extracting to a warehouse

Kojo

  • Benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • It serves speciality trade contractors; general contractors procure subcontracts rather than materials and get almost nothing from it.
  • Enterprise resource planning integration quality varies by system and version, so confirm the depth for your exact configuration rather than accepting the logo on the website.
  • Field adoption is the whole game, and foremen who lose signal in a plant room or basement revert to phoning the office within days unless offline capture genuinely works.
  • It changes purchasing process as well as software, so contractors whose buying authority is informal have to formalise who can commit money before the system produces clean data.

Pricing, plan by plan

B2W Estimate

On request
  • B2W Estimate$undefined/year
    • Priced per estimator seat with a separate server or hosting component
    • Additional B2W modules quoted separately
    • Implementation and resource database setup billed as a project

Kojo

On request
  • Kojo$undefined/year
    • Materials procurement workflow
    • Supplier quoting and purchase orders
    • Inventory tracking

Which should you pick?

Choose B2W Estimate if

  • You need production-rate estimating.
  • You work on Windows, Web.
  • You also want central resource database.

Choose Kojo if

  • You need field material requests.
  • You work on Web, iOS, Android.
  • You also want multi-supplier quoting.

Questions people ask

Is B2W Estimate or Kojo better?
Neither clearly leads. B2W Estimate starts at On request and Kojo at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, B2W Estimate or Kojo?
B2W Estimate starts at On request and Kojo at On request.
Does B2W Estimate or Kojo run on more platforms?
B2W Estimate runs on Windows, Web. Kojo runs on Web, iOS, Android.
What is B2W Estimate best used for?
B2W Estimate is most often used for a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline, a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate, an estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by hand, a contractor moving off heavybid wants a resource database it can reuse across estimating, dispatch and fleet maintenance. Of those, a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline and a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate are not what Kojo is typically brought in for.
What can B2W Estimate do that Kojo cannot?
B2W Estimate covers Production-rate estimating, Central resource database, Concurrent bidding, DOT bid file export. Kojo covers Field material requests, Multi-supplier quoting, Purchase order management, Inventory and warehouse.

Answered from the vendors’ own pages

B2W Estimate: Is B2W Estimate still sold under its own name?

Yes. Trimble acquired B2W in 2022 and continues to sell it as B2W Estimate within the Trimble Construction portfolio.

Kojo: Is this for general contractors?

No. It is built for speciality trade contractors buying materials. General contractors procure subcontracts and would get little from it.

B2W Estimate: Is there a perpetual licence?

Current sales are subscription based. Existing perpetual customers have been migrated toward subscription, so treat a perpetual arrangement as something to negotiate rather than assume.

Kojo: What if our suppliers will not connect?

You lose most of the quoting benefit and keep only the internal workflow. Check distributor participation before purchase, because it determines the return.

B2W Estimate: How does it compare with HeavyBid?

Both are production-rate estimators for heavy civil. B2W's argument is the shared resource database across estimating, field tracking, dispatch and maintenance; HeavyBid's is depth of bidding features and a large installed base in highway work.

Kojo: Does it work without signal on site?

Field requests are designed for site use, and offline behaviour should be tested with your own crews in your worst locations, because that is where adoption is won or lost.

B2W Estimate: Does it work for building construction?

Poorly. It assumes self-performed work priced by crew output. Vertical builders bidding mostly subcontracted scopes should look elsewhere.

Share