Softwr

Construction · head to head

Assignar vs Kojo

Assignar logo

Assignar

Construction

Crew, equipment and compliance dispatch for self-perform and speciality contractors

From
On request
Rated
-
Kojo logo

Kojo

Construction

Materials procurement and inventory for speciality trade contractors

From
On request
Rated
-

The short version

  • Each has a real cost: Assignar it is built for contractors who own crews and plant, so a general contractor coordinating subcontractors gets little from it beyond its own self-perform scopes.; Kojo benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • They diverge on capability: Assignar covers Crew and equipment scheduling, Kojo covers Field material requests.
  • Prices and features above were last checked on 31 August 2026.

Where they differ

Only the attributes on which Assignar and Kojo actually diverge.

Attributes where Assignar and Kojo differ
AttributeAssignarKojo

Identical on both: starting price (On request), pricing model (quote), free tier (No), platforms (Web, iOS, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Assignar

  • Crew and equipment scheduling
  • Digital dockets and timesheets
  • Compliance and competency tracking
  • Forms and inspections
  • Offline mobile capture
  • Production and cost reporting

Only in Kojo

  • Field material requests
  • Multi-supplier quoting
  • Purchase order management
  • Inventory and warehouse
  • Committed cost visibility
  • Enterprise resource planning integration

What people use each for

The jobs each tool is most often brought in to do.

Assignar

  • A civil contractor scheduling crews and plant across multiple sites from one dispatch boardnot Kojo
  • A concrete or earthworks subcontractor replacing paper dockets that arrive three days latenot Kojo
  • A contractor that must prove operator competency and induction status on regulated sitesnot Kojo
  • A self-perform contractor comparing actual crew hours against estimated production ratesnot Kojo

Kojo

  • An electrical or mechanical contractor where materials are close to half of job cost and buying happens dailynot Assignar
  • A trade contractor that cannot see committed material cost against a job until the invoice arrivesnot Assignar
  • A contractor consolidating purchasing across branches to negotiate better distributor pricingnot Assignar
  • A subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheetnot Assignar

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Assignar

  • It is built for contractors who own crews and plant, so a general contractor coordinating subcontractors gets little from it beyond its own self-perform scopes.
  • It is not an accounting or payroll system, so the value depends on a clean integration to your finance system and on someone owning the reconciliation when hours disagree.
  • Australian origins show in terminology and compliance defaults, and North American users spend setup time translating concepts such as tickets and inductions into local equivalents.
  • Offline capture works, but photo-heavy forms on poor connections remain the weak point and should be tested on your worst site before a full rollout.
  • Supervisors have to maintain the schedule for the reporting to mean anything, and dispatchers used to a whiteboard resist that for months unless the change is enforced.

Kojo

  • Benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • It serves speciality trade contractors; general contractors procure subcontracts rather than materials and get almost nothing from it.
  • Enterprise resource planning integration quality varies by system and version, so confirm the depth for your exact configuration rather than accepting the logo on the website.
  • Field adoption is the whole game, and foremen who lose signal in a plant room or basement revert to phoning the office within days unless offline capture genuinely works.
  • It changes purchasing process as well as software, so contractors whose buying authority is informal have to formalise who can commit money before the system produces clean data.

Pricing, plan by plan

Assignar

On request
  • Assignar$undefined/year
    • Crew and equipment scheduling
    • Digital dockets and timesheets
    • Compliance tracking

Kojo

On request
  • Kojo$undefined/year
    • Materials procurement workflow
    • Supplier quoting and purchase orders
    • Inventory tracking

Which should you pick?

Choose Assignar if

  • You need crew and equipment scheduling.
  • You work on Web, iOS, Android.
  • You also want digital dockets and timesheets.

Choose Kojo if

  • You need field material requests.
  • You work on Web, iOS, Android.
  • You also want multi-supplier quoting.

Questions people ask

Is Assignar or Kojo better?
Neither clearly leads. Assignar starts at On request and Kojo at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Assignar or Kojo?
Assignar starts at On request and Kojo at On request.
Does Assignar or Kojo run on more platforms?
Both run on Web, iOS, Android, so platform support will not decide this one for you.
What is Assignar best used for?
Assignar is most often used for a civil contractor scheduling crews and plant across multiple sites from one dispatch board, a concrete or earthworks subcontractor replacing paper dockets that arrive three days late, a contractor that must prove operator competency and induction status on regulated sites, a self-perform contractor comparing actual crew hours against estimated production rates. Of those, a civil contractor scheduling crews and plant across multiple sites from one dispatch board and a concrete or earthworks subcontractor replacing paper dockets that arrive three days late are not what Kojo is typically brought in for.
What can Assignar do that Kojo cannot?
Assignar covers Crew and equipment scheduling, Digital dockets and timesheets, Compliance and competency tracking, Forms and inspections. Kojo covers Field material requests, Multi-supplier quoting, Purchase order management, Inventory and warehouse.

Answered from the vendors’ own pages

Assignar: Is this for general contractors or subcontractors?

Speciality and self-perform contractors. The unit of work is a crew and a machine on a shift, which is not how a general contractor coordinates trades.

Kojo: Is this for general contractors?

No. It is built for speciality trade contractors buying materials. General contractors procure subcontracts and would get little from it.

Assignar: Does the mobile app work without signal?

Yes, entries are captured offline and synchronised later. Test it with photos attached on your worst site, because that is where sync problems appear.

Kojo: What if our suppliers will not connect?

You lose most of the quoting benefit and keep only the internal workflow. Check distributor participation before purchase, because it determines the return.

Assignar: Does it handle payroll?

No. It captures hours and quantities and passes them to your payroll or enterprise resource planning system.

Kojo: Does it work without signal on site?

Field requests are designed for site use, and offline behaviour should be tested with your own crews in your worst locations, because that is where adoption is won or lost.

Share

Related pages

Other head to heads