B2W Estimate vs Primavera P6

B2W Estimate logo

B2W Estimate

Construction

Heavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices

From
On request
Rated
-
Primavera P6 logo

Primavera P6

Construction

Enterprise project portfolio management for construction

From
$2500/year
Rated
-

The short version

  • Each has a real cost: B2W Estimate pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle; Primavera P6 listed on G-Cloud 14 by reseller RPC UK Limited at £165 to £439 per user per month for Oracle Primavera P6 EPPM
  • They diverge on capability: B2W Estimate covers Production-rate estimating, Primavera P6 covers CPM scheduling.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which B2W Estimate and Primavera P6 actually diverge.

Attributes where B2W Estimate and Primavera P6 differ
AttributeB2W EstimatePrimavera P6
Starting priceOn request$2500/year
Pricing modelquotesubscription
FoundedUnknown1977

Identical on both: free tier (No), platforms (Windows, Web), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in B2W Estimate

  • Production-rate estimating
  • Central resource database
  • Concurrent bidding
  • DOT bid file export
  • Alternates and addenda
  • Field feedback loop
  • Bid analysis

Only in Primavera P6

  • CPM scheduling
  • Resource management
  • Cost management
  • Risk analysis
  • Portfolio management
  • Oracle ERP
  • Unifier
  • Aconex

What people use each for

The jobs each tool is most often brought in to do.

B2W Estimate

  • A grading contractor bids a 40 million dollar DOT job and needs to test three crew configurations against the same quantities before the bid deadlinenot Primavera P6
  • A utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimatenot Primavera P6
  • An estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by handnot Primavera P6
  • A contractor moving off HeavyBid wants a resource database it can reuse across estimating, dispatch and fleet maintenancenot Primavera P6

Primavera P6

  • Project schedulingnot B2W Estimate
  • Resource planningnot B2W Estimate
  • Cost controlnot B2W Estimate
  • Portfolio managementnot B2W Estimate

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

B2W Estimate

  • Pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle
  • The system is worthless until your own crews, equipment and production rates are loaded, which is typically several months of a senior estimator's time before the first bid comes out
  • It is aimed squarely at heavy civil self-performing work, so a general contractor whose bids are mostly subcontractor quotes gets very little from the production-rate engine
  • The Trimble acquisition means the product now competes internally with other Trimble civil estimating assets, and buyers should ask directly about the long term roadmap for overlapping products before signing a multi-year term
  • Reporting outside the Inform module is limited, so organisations that want bid analytics across years typically end up buying another module or extracting to a warehouse

Primavera P6

  • Listed on G-Cloud 14 by reseller RPC UK Limited at £165 to £439 per user per month for Oracle Primavera P6 EPPM

Pricing, plan by plan

B2W Estimate

On request
  • B2W Estimate$undefined/year
    • Priced per estimator seat with a separate server or hosting component
    • Additional B2W modules quoted separately
    • Implementation and resource database setup billed as a project

Primavera P6

$2500/year
  • P6 Professional$2500/year
    • Project scheduling
    • Resource management
    • Cost tracking
  • P6 EPPMFree
    • Enterprise PPM
    • Portfolio management
    • Advanced analytics

Which should you pick?

Choose B2W Estimate if

  • You need production-rate estimating.
  • You work on Windows, Web.
  • You also want central resource database.

Choose Primavera P6 if

  • You need cpm scheduling.
  • You work on Windows, Web.
  • You also want resource management.

Questions people ask

Is B2W Estimate or Primavera P6 better?
Neither clearly leads. B2W Estimate starts at On request and Primavera P6 at $2500/year, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, B2W Estimate or Primavera P6?
B2W Estimate starts at On request and Primavera P6 at $2500/year.
Does B2W Estimate or Primavera P6 run on more platforms?
Both run on Windows, Web, so platform support will not decide this one for you.
What is B2W Estimate best used for?
B2W Estimate is most often used for a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline, a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate, an estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by hand, a contractor moving off heavybid wants a resource database it can reuse across estimating, dispatch and fleet maintenance. Of those, a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline and a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate are not what Primavera P6 is typically brought in for.
What can B2W Estimate do that Primavera P6 cannot?
B2W Estimate covers Production-rate estimating, Central resource database, Concurrent bidding, DOT bid file export. Primavera P6 covers CPM scheduling, Resource management, Cost management, Risk analysis.

Answered from the vendors’ own pages

B2W Estimate: Is B2W Estimate still sold under its own name?

Yes. Trimble acquired B2W in 2022 and continues to sell it as B2W Estimate within the Trimble Construction portfolio.

B2W Estimate: Is there a perpetual licence?

Current sales are subscription based. Existing perpetual customers have been migrated toward subscription, so treat a perpetual arrangement as something to negotiate rather than assume.

B2W Estimate: How does it compare with HeavyBid?

Both are production-rate estimators for heavy civil. B2W's argument is the shared resource database across estimating, field tracking, dispatch and maintenance; HeavyBid's is depth of bidding features and a large installed base in highway work.

B2W Estimate: Does it work for building construction?

Poorly. It assumes self-performed work priced by crew output. Vertical builders bidding mostly subcontracted scopes should look elsewhere.