The short version

  • Each has a real cost: On-Screen Takeoff perpetual licensing is no longer offered on current releases, so long-standing users who paid once now face a recurring annual cost they never budgeted, and staying on an old version means no support for newer PDF formats; Sitemark it only does solar, so a mixed renewables portfolio still needs a second platform for wind, storage and substations, and the consolidation argument for buying it collapses.
  • They diverge on capability: On-Screen Takeoff covers Drawing takeoff, Sitemark covers Construction progress tracking.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which On-Screen Takeoff and Sitemark actually diverge.

Attributes where On-Screen Takeoff and Sitemark differ
AttributeOn-Screen TakeoffSitemark
PlatformsWindowsWeb, iOS, Android

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in On-Screen Takeoff

  • Drawing takeoff
  • Revision overlay
  • Condition libraries
  • Automatic scaling
  • Bid zones and phases
  • Quick Bid handoff
  • Excel export

Only in Sitemark

  • Construction progress tracking
  • As-built versus design comparison
  • Thermographic inspection
  • Defect localisation
  • Commissioning workflows
  • Ticketing and work management
  • Portfolio dashboards
  • Drone and robotics ingestion

What people use each for

The jobs each tool is most often brought in to do.

On-Screen Takeoff

  • A drywall contractor measuring wall area and openings across a 300 sheet set where manual takeoff would take a weeknot Sitemark
  • An estimator who receives a late addendum and needs to know which rooms changed rather than re-measuring the whole floornot Sitemark
  • A flooring subcontractor maintaining reusable conditions with waste factors so quantities and material orders stay consistent between estimatorsnot Sitemark
  • A trade contractor that wants takeoff quantities split by phase so progress billing matches the way work is actually releasednot Sitemark

Sitemark

  • An EPC contractor on a multi-hundred-megawatt ground-mount plant that must report weekly installed counts to a lender and cannot do it by walking the rowsnot On-Screen Takeoff
  • An asset owner accepting a plant at provisional acceptance who needs documented evidence that what was built matches the issued design before signingnot On-Screen Takeoff
  • An operations team running annual thermographic inspection across a portfolio, wanting defects mapped to module positions so a technician goes straight to the faultnot On-Screen Takeoff
  • A developer comparing defect and underperformance rates across contractors and module suppliers to inform the next procurement roundnot On-Screen Takeoff

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

On-Screen Takeoff

  • Perpetual licensing is no longer offered on current releases, so long-standing users who paid once now face a recurring annual cost they never budgeted, and staying on an old version means no support for newer PDF formats
  • ConstructConnect does not publish a price, and the product is increasingly sold inside a bundle with lead data and estimating, so buyers who want takeoff alone often find the quote priced around a package they do not need
  • It is Windows desktop only, with no macOS version and no meaningful browser or tablet workflow, which rules it out for firms standardised on Apple hardware
  • The interface has changed little in years and estimators coming from browser-based tools find the condition setup and layer management slow to learn, so onboarding a new estimator takes longer than the software cost would suggest
  • ConstructConnect sells lead data, takeoff and estimating as a portfolio and has consolidated several acquired products, so a buyer committing to On-Screen Takeoff should ask directly where it sits against the newer cloud takeoff products in the same portfolio

Sitemark

  • It only does solar, so a mixed renewables portfolio still needs a second platform for wind, storage and substations, and the consolidation argument for buying it collapses.
  • Pricing is quoted on site count and unpublished variables, which penalises owners of many small distributed assets relative to one operator of a single large plant with the same total capacity.
  • You still need someone to fly the site, and Sitemark does not remove the drone operator cost, permits or airspace constraints; it monetises the data after the flight.
  • Automated progress counting depends on a clean, current design layout, and on projects where the layout changes weekly the comparison generates false deviations that erode trust in the numbers.
  • Thermographic defect detection needs the plant producing at sufficient irradiance, so inspection windows in northern latitudes are narrow and a missed window pushes findings into the next season.

Pricing, plan by plan

On-Screen Takeoff

On request
  • On-Screen Takeoff$undefined/year
    • Annual subscription per seat on version 4 and later
    • Sold increasingly as part of a ConstructConnect takeoff and estimating bundle
    • Perpetual licensing not offered on current releases

Sitemark

On request
  • Sitemark Construction$undefined/year
    • Priced on number of sites and other variables
    • Progress tracking across construction activities
    • As-built versus design quality control
  • Sitemark Operations$undefined/year
    • Thermographic inspection and defect detection
    • Ticketing and work management
    • Portfolio dashboards

Which should you pick?

Choose On-Screen Takeoff if

  • You need drawing takeoff.
  • You work on Windows.
  • You also want revision overlay.

Choose Sitemark if

  • You need construction progress tracking.
  • You work on Web, iOS, Android.
  • You also want as-built versus design comparison.

Questions people ask

Is On-Screen Takeoff or Sitemark better?
Neither clearly leads. On-Screen Takeoff starts at On request and Sitemark at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, On-Screen Takeoff or Sitemark?
On-Screen Takeoff starts at On request and Sitemark at On request.
Does On-Screen Takeoff or Sitemark run on more platforms?
On-Screen Takeoff runs on Windows. Sitemark runs on Web, iOS, Android.
What is On-Screen Takeoff best used for?
On-Screen Takeoff is most often used for a drywall contractor measuring wall area and openings across a 300 sheet set where manual takeoff would take a week, an estimator who receives a late addendum and needs to know which rooms changed rather than re-measuring the whole floor, a flooring subcontractor maintaining reusable conditions with waste factors so quantities and material orders stay consistent between estimators, a trade contractor that wants takeoff quantities split by phase so progress billing matches the way work is actually released. Of those, a drywall contractor measuring wall area and openings across a 300 sheet set where manual takeoff would take a week and an estimator who receives a late addendum and needs to know which rooms changed rather than re-measuring the whole floor are not what Sitemark is typically brought in for.
What can On-Screen Takeoff do that Sitemark cannot?
On-Screen Takeoff covers Drawing takeoff, Revision overlay, Condition libraries, Automatic scaling. Sitemark covers Construction progress tracking, As-built versus design comparison, Thermographic inspection, Defect localisation.

Answered from the vendors’ own pages

On-Screen Takeoff: Can I still buy a perpetual licence?

No. Current releases are annual subscription. Older perpetual licences continue to run but do not receive updates.

Sitemark: Is Sitemark priced per megawatt?

No. Sitemark states pricing is based on number of sites and other variables. Ask explicitly how a portfolio of small sites is treated, because per-site pricing is unkind to distributed assets.

On-Screen Takeoff: Is it sold separately from Quick Bid?

It can be, but ConstructConnect increasingly quotes it as part of a takeoff and estimating package. Ask explicitly for standalone pricing if that is what you want.

Sitemark: Do we have to use Sitemark drone pilots?

No. It accepts data from third-party drone operators, which lets you keep an existing flight contractor.

On-Screen Takeoff: Does it run on a Mac?

Not natively. It is a Windows application and Mac users run it under virtualisation, which is unsupported in practice for large drawing sets.

Sitemark: Does it cover anything other than solar?

No. It is built specifically around solar plant structures and defect types.

On-Screen Takeoff: Will it read a scanned drawing?

Yes, but measurement accuracy on a scanned raster set depends entirely on the scan quality and on setting scale from a verified dimension.

Sitemark: Can we export our data?

Yes, orthomosaics, defect lists and reports export. Confirm the format and whether historical inspections remain accessible after a subscription lapses.

Sitemark: Where is the company based?

Leuven, Belgium, with customers across Europe, the Middle East, Asia and the Americas.