The short version

  • Each has a real cost: Buildots tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.; On-Screen Takeoff perpetual licensing is no longer offered on current releases, so long-standing users who paid once now face a recurring annual cost they never budgeted, and staying on an old version means no support for newer PDF formats
  • They diverge on capability: Buildots covers Hard hat 360 capture, On-Screen Takeoff covers Drawing takeoff.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Buildots and On-Screen Takeoff actually diverge.

Attributes where Buildots and On-Screen Takeoff differ
AttributeBuildotsOn-Screen Takeoff
PlatformsWeb, iOS, AndroidWindows

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Buildots

  • Hard hat 360 capture
  • Model to as-built comparison
  • Per activity progress scoring
  • Programme deviation alerts
  • Delay forecasting
  • Visual evidence trail
  • Subcontractor performance reporting

Only in On-Screen Takeoff

  • Drawing takeoff
  • Revision overlay
  • Condition libraries
  • Automatic scaling
  • Bid zones and phases
  • Quick Bid handoff
  • Excel export

What people use each for

The jobs each tool is most often brought in to do.

Buildots

  • A residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle timenot On-Screen Takeoff
  • A hospital or data centre fit-out where MEP first fix progress is disputed between the main contractor and trades every monthnot On-Screen Takeoff
  • A developer that wants independent progress evidence before certifying an interim payment applicationnot On-Screen Takeoff
  • A contractor building a production rate history across projects so future programmes are based on measured output rather than assumptionnot On-Screen Takeoff

On-Screen Takeoff

  • A drywall contractor measuring wall area and openings across a 300 sheet set where manual takeoff would take a weeknot Buildots
  • An estimator who receives a late addendum and needs to know which rooms changed rather than re-measuring the whole floornot Buildots
  • A flooring subcontractor maintaining reusable conditions with waste factors so quantities and material orders stay consistent between estimatorsnot Buildots
  • A trade contractor that wants takeoff quantities split by phase so progress billing matches the way work is actually releasednot Buildots

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Buildots

  • Tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.
  • The data only arrives if someone walks the site every week with the camera, so coverage decays quietly when the site team is under pressure, exactly when the reporting is most needed.
  • Pricing is per project rather than per seat and includes hardware, so a contractor cannot roll it out cheaply across a portfolio of small jobs and it is uneconomic below a certain project value.
  • It reads interior fit-out and repetitive vertical work far better than structure, groundworks or external envelope, so a large fraction of a project's programme is outside what it can score.
  • Making progress objective creates commercial friction with subcontractors whose valuations have historically been negotiated, and contractors who deploy it without addressing that in the subcontract get pushback rather than adoption.

On-Screen Takeoff

  • Perpetual licensing is no longer offered on current releases, so long-standing users who paid once now face a recurring annual cost they never budgeted, and staying on an old version means no support for newer PDF formats
  • ConstructConnect does not publish a price, and the product is increasingly sold inside a bundle with lead data and estimating, so buyers who want takeoff alone often find the quote priced around a package they do not need
  • It is Windows desktop only, with no macOS version and no meaningful browser or tablet workflow, which rules it out for firms standardised on Apple hardware
  • The interface has changed little in years and estimators coming from browser-based tools find the condition setup and layer management slow to learn, so onboarding a new estimator takes longer than the software cost would suggest
  • ConstructConnect sells lead data, takeoff and estimating as a portfolio and has consolidated several acquired products, so a buyer committing to On-Screen Takeoff should ask directly where it sits against the newer cloud takeoff products in the same portfolio

Pricing, plan by plan

Buildots

On request
  • Buildots$undefined/year
    • Priced per project by size and duration
    • Camera hardware included in the engagement
    • Model onboarding and setup quoted separately

On-Screen Takeoff

On request
  • On-Screen Takeoff$undefined/year
    • Annual subscription per seat on version 4 and later
    • Sold increasingly as part of a ConstructConnect takeoff and estimating bundle
    • Perpetual licensing not offered on current releases

Which should you pick?

Choose Buildots if

  • You need hard hat 360 capture.
  • You work on Web, iOS, Android.
  • You also want model to as-built comparison.

Choose On-Screen Takeoff if

  • You need drawing takeoff.
  • You work on Windows.
  • You also want revision overlay.

Questions people ask

Is Buildots or On-Screen Takeoff better?
Neither clearly leads. Buildots starts at On request and On-Screen Takeoff at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Buildots or On-Screen Takeoff?
Buildots starts at On request and On-Screen Takeoff at On request.
Does Buildots or On-Screen Takeoff run on more platforms?
Buildots runs on Web, iOS, Android. On-Screen Takeoff runs on Windows.
What is Buildots best used for?
Buildots is most often used for a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time, a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month, a developer that wants independent progress evidence before certifying an interim payment application, a contractor building a production rate history across projects so future programmes are based on measured output rather than assumption. Of those, a residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle time and a hospital or data centre fit-out where mep first fix progress is disputed between the main contractor and trades every month are not what On-Screen Takeoff is typically brought in for.
What can Buildots do that On-Screen Takeoff cannot?
Buildots covers Hard hat 360 capture, Model to as-built comparison, Per activity progress scoring, Programme deviation alerts. On-Screen Takeoff covers Drawing takeoff, Revision overlay, Condition libraries, Automatic scaling.

Answered from the vendors’ own pages

Buildots: What does Buildots cost?

It is quoted per project based on size, duration and scope, with camera hardware included. Nothing is published.

On-Screen Takeoff: Can I still buy a perpetual licence?

No. Current releases are annual subscription. Older perpetual licences continue to run but do not receive updates.

Buildots: Do I need a BIM model?

Yes. The system scores progress by comparing captured conditions against model objects, so the model quality sets the ceiling on accuracy.

On-Screen Takeoff: Is it sold separately from Quick Bid?

It can be, but ConstructConnect increasingly quotes it as part of a takeoff and estimating package. Ask explicitly for standalone pricing if that is what you want.

Buildots: What kind of projects suit it?

Repetitive vertical work with heavy interior fit-out. Civil, groundworks and external envelope are poorly covered.

On-Screen Takeoff: Does it run on a Mac?

Not natively. It is a Windows application and Mac users run it under virtualisation, which is unsupported in practice for large drawing sets.

Buildots: Who does the site walks?

Your own site team, typically once or twice a week. There is no Buildots operator on site.

On-Screen Takeoff: Will it read a scanned drawing?

Yes, but measurement accuracy on a scanned raster set depends entirely on the scan quality and on setting scale from a verified dimension.