Softwr

Construction · head to head

B2W Estimate vs Briq

B2W Estimate logo

B2W Estimate

Construction

Heavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices

From
On request
Rated
-
Briq logo

Briq

Construction

Financial automation and forecasting for contractors sitting on top of construction ERP

From
On request
Rated
-

The short version

  • Each has a real cost: B2W Estimate pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle; Briq briq layers on top of an ERP rather than replacing it, so the total finance software bill goes up and the business case has to come from headcount or close-time savings that are hard to measure in advance.
  • They diverge on capability: B2W Estimate covers Production-rate estimating, Briq covers Invoice capture and coding.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which B2W Estimate and Briq actually diverge.

Attributes where B2W Estimate and Briq differ
AttributeB2W EstimateBriq
PlatformsWindows, WebWeb

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in B2W Estimate

  • Production-rate estimating
  • Central resource database
  • Concurrent bidding
  • DOT bid file export
  • Alternates and addenda
  • Field feedback loop
  • Bid analysis

Only in Briq

  • Invoice capture and coding
  • WIP schedules
  • Cash flow forecasting
  • Cost at completion forecasting
  • Multi-entity consolidation
  • Overhead allocation
  • Workflow automation
  • Dashboards and reporting

What people use each for

The jobs each tool is most often brought in to do.

B2W Estimate

  • A grading contractor bids a 40 million dollar DOT job and needs to test three crew configurations against the same quantities before the bid deadlinenot Briq
  • A utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimatenot Briq
  • An estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by handnot Briq
  • A contractor moving off HeavyBid wants a resource database it can reuse across estimating, dispatch and fleet maintenancenot Briq

Briq

  • A contractor whose month-end close runs three weeks because WIP is rebuilt by hand in Excel every periodnot B2W Estimate
  • A group with four operating companies on different chart-of-accounts structures that needs one consolidated margin viewnot B2W Estimate
  • A specialty contractor processing thousands of supplier invoices a month that wants coding and approval automated rather than keyednot B2W Estimate
  • A finance director who needs a defensible cost-at-completion forecast for a surety or lender rather than a project manager's estimatenot B2W Estimate

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

B2W Estimate

  • Pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle
  • The system is worthless until your own crews, equipment and production rates are loaded, which is typically several months of a senior estimator's time before the first bid comes out
  • It is aimed squarely at heavy civil self-performing work, so a general contractor whose bids are mostly subcontractor quotes gets very little from the production-rate engine
  • The Trimble acquisition means the product now competes internally with other Trimble civil estimating assets, and buyers should ask directly about the long term roadmap for overlapping products before signing a multi-year term
  • Reporting outside the Inform module is limited, so organisations that want bid analytics across years typically end up buying another module or extracting to a warehouse

Briq

  • Briq layers on top of an ERP rather than replacing it, so the total finance software bill goes up and the business case has to come from headcount or close-time savings that are hard to measure in advance.
  • The output is only as good as job cost coding in the underlying ledger, and contractors with inconsistent cost codes get faster visibility of a mess rather than a clean forecast.
  • No pricing is published and the contract is scoped by entities, modules and transaction volume, which makes budgeting impossible without a full discovery exercise.
  • Implementation is a data mapping project against systems such as Vista and Sage 300 that were not designed to be read this way, so go-live timelines run into months and depend on your own finance team's availability.
  • It targets mid-market and larger contractors; a firm with one entity and a competent controller in Excel will not recover the cost, and the product is oversized for smaller subcontractors.

Pricing, plan by plan

B2W Estimate

On request
  • B2W Estimate$undefined/year
    • Priced per estimator seat with a separate server or hosting component
    • Additional B2W modules quoted separately
    • Implementation and resource database setup billed as a project

Briq

On request
  • Briq$undefined/year
    • Annual platform subscription
    • Scoped by modules, entities and transaction volume
    • Implementation and data mapping quoted separately

Which should you pick?

Choose B2W Estimate if

  • You need production-rate estimating.
  • You work on Windows, Web.
  • You also want central resource database.

Choose Briq if

  • You need invoice capture and coding.
  • You also want wip schedules.

Questions people ask

Is B2W Estimate or Briq better?
Neither clearly leads. B2W Estimate starts at On request and Briq at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, B2W Estimate or Briq?
B2W Estimate starts at On request and Briq at On request.
Does B2W Estimate or Briq run on more platforms?
B2W Estimate runs on Windows, Web. Briq runs on Web.
What is B2W Estimate best used for?
B2W Estimate is most often used for a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline, a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate, an estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by hand, a contractor moving off heavybid wants a resource database it can reuse across estimating, dispatch and fleet maintenance. Of those, a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline and a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate are not what Briq is typically brought in for.
What can B2W Estimate do that Briq cannot?
B2W Estimate covers Production-rate estimating, Central resource database, Concurrent bidding, DOT bid file export. Briq covers Invoice capture and coding, WIP schedules, Cash flow forecasting, Cost at completion forecasting.

Answered from the vendors’ own pages

B2W Estimate: Is B2W Estimate still sold under its own name?

Yes. Trimble acquired B2W in 2022 and continues to sell it as B2W Estimate within the Trimble Construction portfolio.

Briq: Does Briq replace my construction accounting system?

No. It reads from Vista, Sage or similar and automates the reporting and forecasting layer above them. You keep the ERP.

B2W Estimate: Is there a perpetual licence?

Current sales are subscription based. Existing perpetual customers have been migrated toward subscription, so treat a perpetual arrangement as something to negotiate rather than assume.

Briq: What does it cost?

Briq does not publish pricing. Contracts are scoped by module, entity count and transaction volume and quoted annually.

B2W Estimate: How does it compare with HeavyBid?

Both are production-rate estimators for heavy civil. B2W's argument is the shared resource database across estimating, field tracking, dispatch and maintenance; HeavyBid's is depth of bidding features and a large installed base in highway work.

Briq: How long does implementation take?

Expect months rather than weeks, because most of the work is mapping and cleaning job cost data from the existing ledger.

B2W Estimate: Does it work for building construction?

Poorly. It assumes self-performed work priced by crew output. Vertical builders bidding mostly subcontracted scopes should look elsewhere.

Briq: Is it useful for a single-entity contractor?

Less so. The strongest case is multi-entity consolidation and high invoice volume; a small contractor gets thinner returns.

Share

Related pages

Other head to heads