Softwr

Construction · head to head

Briq vs Cubit Estimating

Briq logo

Briq

Construction

Financial automation and forecasting for contractors sitting on top of construction ERP

From
On request
Rated
-
Cubit Estimating logo

Cubit Estimating

Construction

Australian estimating and on-screen takeoff in one window, priced openly per user per month

From
167/month
Rated
-

The short version

  • Each has a real cost: Briq briq layers on top of an ERP rather than replacing it, so the total finance software bill goes up and the business case has to come from headcount or close-time savings that are hard to measure in advance.; Cubit Estimating every subscription carries a minimum twelve month term, so a firm that hires an estimator for one tender period pays for the full year regardless.
  • They diverge on capability: Briq covers Invoice capture and coding, Cubit Estimating covers Integrated takeoff and estimate.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Briq and Cubit Estimating actually diverge.

Attributes where Briq and Cubit Estimating differ
AttributeBriqCubit Estimating
Starting priceOn request167/month
Pricing modelquotePer user per month
PlatformsWebWindows

Identical on both: free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Briq

  • Invoice capture and coding
  • WIP schedules
  • Cash flow forecasting
  • Cost at completion forecasting
  • Multi-entity consolidation
  • Overhead allocation
  • Workflow automation
  • Dashboards and reporting

Only in Cubit Estimating

  • Integrated takeoff and estimate
  • Calculation and rate sheets
  • Price list management
  • Bills of quantities
  • BIM and IFC takeoff
  • Revision management
  • AI Estimating add-on
  • Job collaboration

What people use each for

The jobs each tool is most often brought in to do.

Briq

  • A contractor whose month-end close runs three weeks because WIP is rebuilt by hand in Excel every periodnot Cubit Estimating
  • A group with four operating companies on different chart-of-accounts structures that needs one consolidated margin viewnot Cubit Estimating
  • A specialty contractor processing thousands of supplier invoices a month that wants coding and approval automated rather than keyednot Cubit Estimating
  • A finance director who needs a defensible cost-at-completion forecast for a surety or lender rather than a project manager's estimatenot Cubit Estimating

Cubit Estimating

  • An Australian commercial builder that wants takeoff and estimate in one file rather than exporting quantities from a separate measurement toolnot Briq
  • A quantity surveying practice producing trade-structured bills of quantities to local conventionnot Briq
  • A subcontractor pricing repeat work from maintained supplier price lists rather than rebuilding rates each tendernot Briq
  • A small estimating team that needs to know the annual cost before booking a demo, because the rate card is publishednot Briq

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Briq

  • Briq layers on top of an ERP rather than replacing it, so the total finance software bill goes up and the business case has to come from headcount or close-time savings that are hard to measure in advance.
  • The output is only as good as job cost coding in the underlying ledger, and contractors with inconsistent cost codes get faster visibility of a mess rather than a clean forecast.
  • No pricing is published and the contract is scoped by entities, modules and transaction volume, which makes budgeting impossible without a full discovery exercise.
  • Implementation is a data mapping project against systems such as Vista and Sage 300 that were not designed to be read this way, so go-live timelines run into months and depend on your own finance team's availability.
  • It targets mid-market and larger contractors; a firm with one entity and a competent controller in Excel will not recover the cost, and the product is oversized for smaller subcontractors.

Cubit Estimating

  • Every subscription carries a minimum twelve month term, so a firm that hires an estimator for one tender period pays for the full year regardless.
  • BIM and IFC takeoff sits only in Enterprise at $250 per user per month, meaning a builder who receives models rather than PDFs is pushed to the top tier whether or not it needs collaboration features.
  • The product is Windows only with no macOS or browser client, which excludes practices standardised on Macs unless they run virtualisation.
  • Rate libraries, measurement conventions and BOQ structures follow Australian practice, so buyers outside Australia and New Zealand inherit a method that does not match their local standard forms.
  • The AI Estimating add-on is priced at an explicitly temporary introductory rate, so a firm building the feature into its workflow is accepting an unspecified future increase on top of the seat price.

Pricing, plan by plan

Briq

On request
  • Briq$undefined/year
    • Annual platform subscription
    • Scoped by modules, entities and transaction volume
    • Implementation and data mapping quoted separately

Cubit Estimating

167/month
  • Standard$167/month
    • Integrated estimating and takeoff
    • Calculation sheets, rate sheets and price lists
    • Basic job management
  • Professional$222/month
    • Everything in Standard
    • Code grouping
    • Custom reporting
  • Enterprise$250/month
    • Everything in Professional
    • BIM and IFC takeoff
    • Multi-user job collaboration
  • AI Estimating add-on$20/month
    • Automated element recognition
    • Works with any edition
    • Introductory rate the vendor says will increase

Which should you pick?

Choose Briq if

  • You need invoice capture and coding.
  • You also want wip schedules.

Choose Cubit Estimating if

  • You need integrated takeoff and estimate.
  • You work on Windows.
  • You also want calculation and rate sheets.

Questions people ask

Is Briq or Cubit Estimating better?
Neither clearly leads. Briq starts at On request and Cubit Estimating at 167/month, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Briq or Cubit Estimating?
Briq starts at On request and Cubit Estimating at 167/month.
Does Briq or Cubit Estimating run on more platforms?
Briq runs on Web. Cubit Estimating runs on Windows.
What is Briq best used for?
Briq is most often used for a contractor whose month-end close runs three weeks because wip is rebuilt by hand in excel every period, a group with four operating companies on different chart-of-accounts structures that needs one consolidated margin view, a specialty contractor processing thousands of supplier invoices a month that wants coding and approval automated rather than keyed, a finance director who needs a defensible cost-at-completion forecast for a surety or lender rather than a project manager's estimate. Of those, a contractor whose month-end close runs three weeks because wip is rebuilt by hand in excel every period and a group with four operating companies on different chart-of-accounts structures that needs one consolidated margin view are not what Cubit Estimating is typically brought in for.
What can Briq do that Cubit Estimating cannot?
Briq covers Invoice capture and coding, WIP schedules, Cash flow forecasting, Cost at completion forecasting. Cubit Estimating covers Integrated takeoff and estimate, Calculation and rate sheets, Price list management, Bills of quantities.

Answered from the vendors’ own pages

Briq: Does Briq replace my construction accounting system?

No. It reads from Vista, Sage or similar and automates the reporting and forecasting layer above them. You keep the ERP.

Cubit Estimating: What does Cubit actually cost?

Standard $167, Professional $222 and Enterprise $250 per user per month on annual billing, in Australian dollars excluding GST. Monthly billing is about 16 per cent more.

Briq: What does it cost?

Briq does not publish pricing. Contracts are scoped by module, entity count and transaction volume and quoted annually.

Cubit Estimating: Can I get BIM takeoff without the Enterprise tier?

No. IFC model takeoff is an Enterprise feature only.

Briq: How long does implementation take?

Expect months rather than weeks, because most of the work is mapping and cleaning job cost data from the existing ledger.

Cubit Estimating: Is there a perpetual licence?

No. Cubit Estimating is subscription only with a minimum twelve month commitment.

Briq: Is it useful for a single-entity contractor?

Less so. The strongest case is multi-entity consolidation and high invoice volume; a small contractor gets thinner returns.

Cubit Estimating: Does it suit contractors outside Australia?

It works, but rate libraries and BOQ conventions follow Australian standards, so buyers elsewhere do more setup than a locally built alternative would need.

Share

Related pages

Other head to heads