Softwr

Construction · head to head

ALICE Technologies vs Sitemark

ALICE Technologies logo

ALICE Technologies

Construction

Generative construction scheduling that produces and compares millions of build sequences

From
On request
Rated
-
Sitemark logo

Sitemark

Construction

Drone-based progress tracking, quality control and commissioning built specifically for solar farms

From
On request
Rated
-

The short version

  • Each has a real cost: ALICE Technologies the output is only as good as the recipes, and building accurate recipes is specialist modelling work most contractors cannot staff, so engagements depend on ALICE or a consultant doing it, which turns software into a services contract.; Sitemark it only does solar, so a mixed renewables portfolio still needs a second platform for wind, storage and substations, and the consolidation argument for buying it collapses.
  • They diverge on capability: ALICE Technologies covers Generative scheduling, Sitemark covers Construction progress tracking.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which ALICE Technologies and Sitemark actually diverge.

Attributes where ALICE Technologies and Sitemark differ
AttributeALICE TechnologiesSitemark
PlatformsWeb, WindowsWeb, iOS, Android

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in ALICE Technologies

  • Generative scheduling
  • Recipe modelling
  • Optioneering
  • Schedule recovery
  • Resource levelling
  • 4D visualisation
  • P6 and MS Project import
  • Scenario comparison reports

Only in Sitemark

  • Construction progress tracking
  • As-built versus design comparison
  • Thermographic inspection
  • Defect localisation
  • Commissioning workflows
  • Ticketing and work management
  • Portfolio dashboards
  • Drone and robotics ingestion

What people use each for

The jobs each tool is most often brought in to do.

ALICE Technologies

  • A data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers itnot Sitemark
  • A contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committingnot Sitemark
  • A bid team wanting to submit a shorter programme than competitors while proving to the client that the resource profile is achievable rather than optimisticnot Sitemark
  • A delay claim where the contractor must demonstrate to a client or adjudicator what the schedule would have looked like without a specific disruptionnot Sitemark

Sitemark

  • An EPC contractor on a multi-hundred-megawatt ground-mount plant that must report weekly installed counts to a lender and cannot do it by walking the rowsnot ALICE Technologies
  • An asset owner accepting a plant at provisional acceptance who needs documented evidence that what was built matches the issued design before signingnot ALICE Technologies
  • An operations team running annual thermographic inspection across a portfolio, wanting defects mapped to module positions so a technician goes straight to the faultnot ALICE Technologies
  • A developer comparing defect and underperformance rates across contractors and module suppliers to inform the next procurement roundnot ALICE Technologies

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

ALICE Technologies

  • The output is only as good as the recipes, and building accurate recipes is specialist modelling work most contractors cannot staff, so engagements depend on ALICE or a consultant doing it, which turns software into a services contract.
  • Pricing is quoted per project or programme with no published rates, so the tool is effectively unavailable to anyone who cannot justify a bespoke enterprise negotiation.
  • It only pays back on projects where float has a high monetary value; on a mid-size commercial building the modelling effort exceeds the schedule saving, which is why the customer list skews to data centres, energy and heavy civils.
  • A generated schedule still has to be accepted by superintendents and subcontractors who did not build it, and adoption failures are usually social rather than technical: the field runs the plan it believes in.
  • The 2026 McKinsey alliance pushes distribution towards consulting-led engagements, which raises the effective cost of entry and makes the direct-purchase path less certain for a contractor that just wants a licence.

Sitemark

  • It only does solar, so a mixed renewables portfolio still needs a second platform for wind, storage and substations, and the consolidation argument for buying it collapses.
  • Pricing is quoted on site count and unpublished variables, which penalises owners of many small distributed assets relative to one operator of a single large plant with the same total capacity.
  • You still need someone to fly the site, and Sitemark does not remove the drone operator cost, permits or airspace constraints; it monetises the data after the flight.
  • Automated progress counting depends on a clean, current design layout, and on projects where the layout changes weekly the comparison generates false deviations that erode trust in the numbers.
  • Thermographic defect detection needs the plant producing at sufficient irradiance, so inspection windows in northern latitudes are narrow and a missed window pushes findings into the next season.

Pricing, plan by plan

ALICE Technologies

On request
  • ALICE$undefined/year
    • Quoted per project or per programme
    • Generative scheduling and optioneering
    • Recipe modelling support

Sitemark

On request
  • Sitemark Construction$undefined/year
    • Priced on number of sites and other variables
    • Progress tracking across construction activities
    • As-built versus design quality control
  • Sitemark Operations$undefined/year
    • Thermographic inspection and defect detection
    • Ticketing and work management
    • Portfolio dashboards

Which should you pick?

Choose ALICE Technologies if

  • You need generative scheduling.
  • You work on Web, Windows.
  • You also want recipe modelling.

Choose Sitemark if

  • You need construction progress tracking.
  • You work on Web, iOS, Android.
  • You also want as-built versus design comparison.

Questions people ask

Is ALICE Technologies or Sitemark better?
Neither clearly leads. ALICE Technologies starts at On request and Sitemark at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, ALICE Technologies or Sitemark?
ALICE Technologies starts at On request and Sitemark at On request.
Does ALICE Technologies or Sitemark run on more platforms?
ALICE Technologies runs on Web, Windows. Sitemark runs on Web, iOS, Android.
What is ALICE Technologies best used for?
ALICE Technologies is most often used for a data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers it, a contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committing, a bid team wanting to submit a shorter programme than competitors while proving to the client that the resource profile is achievable rather than optimistic, a delay claim where the contractor must demonstrate to a client or adjudicator what the schedule would have looked like without a specific disruption. Of those, a data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers it and a contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committing are not what Sitemark is typically brought in for.
What can ALICE Technologies do that Sitemark cannot?
ALICE Technologies covers Generative scheduling, Recipe modelling, Optioneering, Schedule recovery. Sitemark covers Construction progress tracking, As-built versus design comparison, Thermographic inspection, Defect localisation.

Answered from the vendors’ own pages

ALICE Technologies: What does ALICE actually produce?

A set of alternative construction sequences generated from your constraints, scored on duration, cost and resource use, so you can choose rather than accept one plan.

Sitemark: Is Sitemark priced per megawatt?

No. Sitemark states pricing is based on number of sites and other variables. Ask explicitly how a portfolio of small sites is treated, because per-site pricing is unkind to distributed assets.

ALICE Technologies: Does it replace Primavera P6?

No. It imports from and exports to P6. P6 remains the contractual schedule of record on most projects.

Sitemark: Do we have to use Sitemark drone pilots?

No. It accepts data from third-party drone operators, which lets you keep an existing flight contractor.

ALICE Technologies: Is the company still operating?

Yes. ALICE is active as of 2026 and announced an alliance with McKinsey in April 2026 to deliver AI scheduling to McKinsey clients.

Sitemark: Does it cover anything other than solar?

No. It is built specifically around solar plant structures and defect types.

ALICE Technologies: How much does it cost?

Not published. It is quoted per project or programme and typically includes modelling and onboarding services.

Sitemark: Can we export our data?

Yes, orthomosaics, defect lists and reports export. Confirm the format and whether historical inspections remain accessible after a subscription lapses.

ALICE Technologies: What size project justifies it?

Projects where a week of schedule has a large monetary value: data centres, energy, industrial and major infrastructure. It is hard to justify on standard commercial building work.

Sitemark: Where is the company based?

Leuven, Belgium, with customers across Europe, the Middle East, Asia and the Americas.