Softwr

Construction · head to head

ALICE Technologies vs Openspace

ALICE Technologies logo

ALICE Technologies

Construction

Generative construction scheduling that produces and compares millions of build sequences

From
On request
Rated
-
Openspace logo

Openspace

Construction

AI-powered construction photo documentation

From
$2500/month
Rated
-

The short version

  • Each has a real cost: ALICE Technologies the output is only as good as the recipes, and building accurate recipes is specialist modelling work most contractors cannot staff, so engagements depend on ALICE or a consultant doing it, which turns software into a services contract.; Openspace requires specialized 360-degree camera hardware for optimal documentation workflow
  • They diverge on capability: ALICE Technologies covers Generative scheduling, Openspace covers 360 photo capture.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which ALICE Technologies and Openspace actually diverge.

Attributes where ALICE Technologies and Openspace differ
AttributeALICE TechnologiesOpenspace
Starting priceOn request$2500/month
Pricing modelquotesubscription
PlatformsWeb, WindowsiOS, Android, Web
FoundedUnknown2017

Identical on both: free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in ALICE Technologies

  • Generative scheduling
  • Recipe modelling
  • Optioneering
  • Schedule recovery
  • Resource levelling
  • 4D visualisation
  • P6 and MS Project import
  • Scenario comparison reports

Only in Openspace

  • 360 photo capture
  • BIM compare
  • Progress tracking
  • AI analysis
  • Measurement tools
  • Procore
  • Autodesk BIM 360
  • PlanGrid

What people use each for

The jobs each tool is most often brought in to do.

ALICE Technologies

  • A data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers itnot Openspace
  • A contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committingnot Openspace
  • A bid team wanting to submit a shorter programme than competitors while proving to the client that the resource profile is achievable rather than optimisticnot Openspace
  • A delay claim where the contractor must demonstrate to a client or adjudicator what the schedule would have looked like without a specific disruptionnot Openspace

Openspace

  • Site documentationnot ALICE Technologies
  • Progress trackingnot ALICE Technologies
  • Quality controlnot ALICE Technologies
  • Dispute resolutionnot ALICE Technologies

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

ALICE Technologies

  • The output is only as good as the recipes, and building accurate recipes is specialist modelling work most contractors cannot staff, so engagements depend on ALICE or a consultant doing it, which turns software into a services contract.
  • Pricing is quoted per project or programme with no published rates, so the tool is effectively unavailable to anyone who cannot justify a bespoke enterprise negotiation.
  • It only pays back on projects where float has a high monetary value; on a mid-size commercial building the modelling effort exceeds the schedule saving, which is why the customer list skews to data centres, energy and heavy civils.
  • A generated schedule still has to be accepted by superintendents and subcontractors who did not build it, and adoption failures are usually social rather than technical: the field runs the plan it believes in.
  • The 2026 McKinsey alliance pushes distribution towards consulting-led engagements, which raises the effective cost of entry and makes the direct-purchase path less certain for a contractor that just wants a licence.

Openspace

  • Requires specialized 360-degree camera hardware for optimal documentation workflow
  • Custom pricing model makes it difficult to evaluate costs upfront without contacting sales
  • Field solution is newly launched and may lack mature features compared to established competitors

Pricing, plan by plan

ALICE Technologies

On request
  • ALICE$undefined/year
    • Quoted per project or per programme
    • Generative scheduling and optioneering
    • Recipe modelling support

Openspace

$2500/month
  • Capture$2500/month
    • 360 photo capture
    • Automatic stitching
    • BIM integration
  • EnterpriseFree
    • All Capture features
    • Advanced analytics
    • Custom integrations

Which should you pick?

Choose ALICE Technologies if

  • You need generative scheduling.
  • You work on Web, Windows.
  • You also want recipe modelling.

Choose Openspace if

  • You need 360 photo capture.
  • You work on iOS, Android, Web.
  • You also want bim compare.

Questions people ask

Is ALICE Technologies or Openspace better?
Neither clearly leads. ALICE Technologies starts at On request and Openspace at $2500/month, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, ALICE Technologies or Openspace?
ALICE Technologies starts at On request and Openspace at $2500/month.
Does ALICE Technologies or Openspace run on more platforms?
ALICE Technologies runs on Web, Windows. Openspace runs on iOS, Android, Web.
What is ALICE Technologies best used for?
ALICE Technologies is most often used for a data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers it, a contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committing, a bid team wanting to submit a shorter programme than competitors while proving to the client that the resource profile is achievable rather than optimistic, a delay claim where the contractor must demonstrate to a client or adjudicator what the schedule would have looked like without a specific disruption. Of those, a data centre programme where six months of earlier energisation is worth more than the entire construction management budget, and the owner wants evidence that a proposed sequence change actually delivers it and a contractor facing liquidated damages that must decide between a second shift, a second crane and resequencing, and needs the cost and duration consequence of each before committing are not what Openspace is typically brought in for.
What can ALICE Technologies do that Openspace cannot?
ALICE Technologies covers Generative scheduling, Recipe modelling, Optioneering, Schedule recovery. Openspace covers 360 photo capture, BIM compare, Progress tracking, AI analysis.

Answered from the vendors’ own pages

ALICE Technologies: What does ALICE actually produce?

A set of alternative construction sequences generated from your constraints, scored on duration, cost and resource use, so you can choose rather than accept one plan.

Openspace: How quickly does OpenSpace document construction sites?

OpenSpace documents 25,000 sq. ft. in 10 minutes using 360-degree cameras. Photos are automatically pinned to floor plans, timestamped, and ready to view in 15 minutes.

Source
ALICE Technologies: Does it replace Primavera P6?

No. It imports from and exports to P6. P6 remains the contractual schedule of record on most projects.

Openspace: Does OpenSpace integrate with existing project management tools?

Yes. OpenSpace Field integrates with Procore and Autodesk Construction Cloud, allowing teams to create punch lists and observations in real-time without disrupting existing workflows.

Source
ALICE Technologies: Is the company still operating?

Yes. ALICE is active as of 2026 and announced an alliance with McKinsey in April 2026 to deliver AI scheduling to McKinsey clients.

Openspace: What camera equipment does OpenSpace require?

OpenSpace uses 360-degree cameras for site documentation. The platform automatically processes and maps captured images without requiring specialized technical skills from on-site staff.

Source
ALICE Technologies: How much does it cost?

Not published. It is quoted per project or programme and typically includes modelling and onboarding services.

Openspace: What AI features does OpenSpace provide for construction teams?

OpenSpace includes Spatial AI for automatic issue location tagging, AI Voice Notes for hands-free data capture, and an AI-powered media library for efficient image retrieval to accelerate project workflows.

Source
ALICE Technologies: What size project justifies it?

Projects where a week of schedule has a large monetary value: data centres, energy, industrial and major infrastructure. It is hard to justify on standard commercial building work.