Manufacturing · head to head
Oden Technologies vs Yokogawa CENTUM VP

Oden Technologies
Manufacturing
Process analytics for continuous production, strongest in plastics extrusion and moulding
- From
- On request
- Rated
- -

Yokogawa CENTUM VP
Manufacturing
Distributed control system for continuous process plants with a documented 30-year upgrade path
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Oden Technologies the depth is in plastics and continuous processing, so a discrete job shop with short runs and frequent changeovers does not generate the repetition the analysis needs and will get little from it.; Yokogawa CENTUM VP there is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
- They diverge on capability: Oden Technologies covers High frequency data collection, Yokogawa CENTUM VP covers Field Control Station.
- Prices and features above were last checked on 1 September 2026.
Where they differ
Only the attributes on which Oden Technologies and Yokogawa CENTUM VP actually diverge.
| Attribute | Oden Technologies | Yokogawa CENTUM VP |
|---|---|---|
| Platforms | Web, API | Windows, On-premise |
Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Manufacturing).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Oden Technologies
- High frequency data collection
- Reference run analysis
- Scrap and yield analytics
- Line and plant dashboards
- PLC and historian connectivity
- Alerting on process drift
Only in Yokogawa CENTUM VP
- Field Control Station
- N-IO
- Human Interface Station
- ProSafe-RS integration
- Vnet/IP
- Migration from CS 1000 and CS 3000
- Exaquantum integration
- Alarm management
What people use each for
The jobs each tool is most often brought in to do.
Oden Technologies
- A plastics extrusion plant losing material to scrap when settings drift between shifts and operatorsnot Yokogawa CENTUM VP
- A moulder that wants to know which parameter combination produced its best historical run of a given partnot Yokogawa CENTUM VP
- A continuous processor whose historian holds years of data that nobody has turned into operating guidancenot Yokogawa CENTUM VP
- A multi site group wanting comparable line performance figures across plants that currently report differentlynot Yokogawa CENTUM VP
Yokogawa CENTUM VP
- Replacing end-of-life CENTUM CS 3000 controllers during a refinery turnaround without pulling field cablingnot Oden Technologies
- Greenfield LNG train where the control and safety systems must share one operator console and one event lognot Oden Technologies
- Specialty chemicals batch plant needing sequence control with recipe management and full electronic batch recordsnot Oden Technologies
- Combined cycle power station where 99.99999 percent availability figures are written into the contractnot Oden Technologies
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Oden Technologies
- The depth is in plastics and continuous processing, so a discrete job shop with short runs and frequent changeovers does not generate the repetition the analysis needs and will get little from it.
- It depends on fast process data from PLCs or a historian, so a plant with older machines that have no controller data must pay for instrumentation before the software does anything, which is the opposite of a low friction rollout.
- Realising the benefit requires process engineers who can act on the findings, and a plant without that capability ends up with analysis nobody converts into standard operating conditions.
- Pricing is per line and not published, so a plant with many small lines pays in proportion to line count rather than to output value, and the economics favour fewer high value lines.
- It overlaps with historian and SCADA investments a plant may already have, and buyers frequently have to justify why an existing AVEVA or Ignition estate cannot be made to do a version of the same job.
Yokogawa CENTUM VP
- There is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
- Engineering and commissioning routinely cost several times the hardware and software, and owners who budget from the equipment quote alone are consistently short.
- The ecosystem is closed: controllers, I/O and diagnostics are Yokogawa, and third-party alternatives at the controller layer do not exist, so the vendor holds pricing power for the twenty years or more the plant runs.
- Operator stations run on Windows and are tied to specific validated Windows releases, so operating system end-of-life forces console refresh cycles that are governed by Yokogawa validation rather than by your IT policy.
- Engineering staff who know CENTUM are scarce outside Japan, the Middle East and South East Asia, and in North America and Europe you will pay a premium or depend on Yokogawa’s own services organisation for changes.
Pricing, plan by plan
Oden Technologies
On request- Oden$undefined/year
- Per line data collection and analytics
- Reference run and yield analysis
- Connectivity to PLCs and historians
Yokogawa CENTUM VP
On request- CENTUM VP$undefined/year
- Priced as an engineered system, not a per-seat licence
- Cost driven by I/O count, controller redundancy and number of operator stations
- Engineering, FAT, commissioning and training quoted separately and usually exceed hardware
Which should you pick?
Choose Oden Technologies if
- You need high frequency data collection.
- You work on Web, API.
- You also want reference run analysis.
Choose Yokogawa CENTUM VP if
- You need field control station.
- You work on Windows, On-premise.
- You also want n-io.
Questions people ask
- Is Oden Technologies or Yokogawa CENTUM VP better?
- Neither clearly leads. Oden Technologies starts at On request and Yokogawa CENTUM VP at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Oden Technologies or Yokogawa CENTUM VP?
- Oden Technologies starts at On request and Yokogawa CENTUM VP at On request.
- Does Oden Technologies or Yokogawa CENTUM VP run on more platforms?
- Oden Technologies runs on Web, API. Yokogawa CENTUM VP runs on Windows, On-premise.
- What is Oden Technologies best used for?
- Oden Technologies is most often used for a plastics extrusion plant losing material to scrap when settings drift between shifts and operators, a moulder that wants to know which parameter combination produced its best historical run of a given part, a continuous processor whose historian holds years of data that nobody has turned into operating guidance, a multi site group wanting comparable line performance figures across plants that currently report differently. Of those, a plastics extrusion plant losing material to scrap when settings drift between shifts and operators and a moulder that wants to know which parameter combination produced its best historical run of a given part are not what Yokogawa CENTUM VP is typically brought in for.
- What can Oden Technologies do that Yokogawa CENTUM VP cannot?
- Oden Technologies covers High frequency data collection, Reference run analysis, Scrap and yield analytics, Line and plant dashboards. Yokogawa CENTUM VP covers Field Control Station, N-IO, Human Interface Station, ProSafe-RS integration.
Answered from the vendors’ own pages
Oden Technologies: Is it suitable for a machine shop?
Not really. It is built for continuous and repetitive high volume processes, not short run discrete machining.
Yokogawa CENTUM VP: Can I upgrade from CENTUM CS 3000 without rewiring the plant?
Yes. Yokogawa sells migration packages that replace the controller and keep existing field wiring and marshalling, which is the main reason CENTUM installations stay CENTUM.
Oden Technologies: Does it need a historian?
No, it can collect directly from PLCs, but it will read from an existing historian where one is present.
Yokogawa CENTUM VP: Is CENTUM VP sold as a subscription?
No. It is a capital purchase of hardware and licences with an annual service agreement for updates and support.
Oden Technologies: What is the main measurable outcome?
Scrap reduction and throughput improvement on repeated products, rather than labour savings.
Yokogawa CENTUM VP: How does it compare with Emerson DeltaV on cost?
Neither publishes prices. CENTUM tends to win on brownfield migration cost because the field wiring stays; DeltaV tends to be cheaper on small greenfield systems.
Oden Technologies: Will it work on machines without PLC data?
No. Those machines need instrumenting first, and that cost belongs in the business case.
Yokogawa CENTUM VP: Do I need a separate safety system?
Yes, for SIL-rated functions. ProSafe-RS is the Yokogawa SIS and shares the CENTUM engineering database and operator console.
Related pages
More on Oden Technologies
More on Yokogawa CENTUM VP
Other head to heads
- Oden Technologies vs Ignition
- Oden Technologies vs TrakSYS
- Oden Technologies vs KCF Technologies
- Oden Technologies vs Seeq
- Oden Technologies vs TrendMiner
- Oden Technologies vs Sensemore
- Oden Technologies vs Waites Sensor Technologies
- Oden Technologies vs Augury
- Oden Technologies vs Guidewheel
- Oden Technologies vs Kepware Server
- Oden Technologies vs ABB 800xA
- Oden Technologies vs Rockwell FactoryTalk
- Oden Technologies vs SKF Enlight Centre
- Oden Technologies vs AVEVA System Platform
- Oden Technologies vs Hippo CMMS
- Oden Technologies vs 3YOURMIND
- Oden Technologies vs Siemens WinCC Unified
- Oden Technologies vs GENESIS Version 11
- Oden Technologies vs COPA-DATA zenon
- Oden Technologies vs JobBOSS²
- Oden Technologies vs QAD Redzone
- Oden Technologies vs Sight Machine
- Oden Technologies vs Authentise
- Oden Technologies vs GrabCAD Print
- Oden Technologies vs Litmus Edge
- Yokogawa CENTUM VP vs Ignition
- Yokogawa CENTUM VP vs TrakSYS
- Yokogawa CENTUM VP vs KCF Technologies
- Yokogawa CENTUM VP vs Seeq
- Yokogawa CENTUM VP vs TrendMiner
- Yokogawa CENTUM VP vs Sensemore
- Yokogawa CENTUM VP vs Waites Sensor Technologies
- Yokogawa CENTUM VP vs Augury
- Yokogawa CENTUM VP vs Guidewheel
- Yokogawa CENTUM VP vs Kepware Server
- Yokogawa CENTUM VP vs ABB 800xA
- Yokogawa CENTUM VP vs Rockwell FactoryTalk
- Yokogawa CENTUM VP vs SKF Enlight Centre
- Yokogawa CENTUM VP vs AVEVA System Platform
- Yokogawa CENTUM VP vs Hippo CMMS
- Yokogawa CENTUM VP vs 3YOURMIND
- Yokogawa CENTUM VP vs Siemens WinCC Unified
- Yokogawa CENTUM VP vs GENESIS Version 11
- Yokogawa CENTUM VP vs COPA-DATA zenon
- Yokogawa CENTUM VP vs JobBOSS²
- Yokogawa CENTUM VP vs QAD Redzone
- Yokogawa CENTUM VP vs Sight Machine
- Yokogawa CENTUM VP vs Authentise
- Yokogawa CENTUM VP vs GrabCAD Print
- Yokogawa CENTUM VP vs Litmus Edge
