Softwr

Manufacturing · head to head

Ignition vs Yokogawa CENTUM VP

Ignition logo

Ignition

Manufacturing

Industrial automation platform for SCADA, HMI and MES

From
On request
Rated
-
Yokogawa CENTUM VP logo

Yokogawa CENTUM VP

Manufacturing

Distributed control system for continuous process plants with a documented 30-year upgrade path

From
On request
Rated
-

The short version

  • Each has a real cost: Ignition requires real engineering to implement; it is a platform rather than a finished application; Yokogawa CENTUM VP there is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • They diverge on capability: Ignition covers Unlimited-client licensing, Yokogawa CENTUM VP covers Field Control Station.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Ignition and Yokogawa CENTUM VP actually diverge.

Attributes where Ignition and Yokogawa CENTUM VP differ
AttributeIgnitionYokogawa CENTUM VP
Pricing modelPer-server licensing with published module pricing; unlimited clients and tagsquote
PlatformsWindows, Linux, macOS, WebWindows, On-premise

Identical on both: starting price (On request), free tier (No), user rating (Not yet rated), category (Manufacturing).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Ignition

  • Unlimited-client licensing
  • SCADA and HMI
  • Historian
  • MES modules
  • Web-based clients
  • Wide PLC support

Only in Yokogawa CENTUM VP

  • Field Control Station
  • N-IO
  • Human Interface Station
  • ProSafe-RS integration
  • Vnet/IP
  • Migration from CS 1000 and CS 3000
  • Exaquantum integration
  • Alarm management

What people use each for

The jobs each tool is most often brought in to do.

Ignition

  • Plants where per-tag licensing has made expansion a budget conversationnot Yokogawa CENTUM VP
  • Replacing installed operator terminals with browser-based clientsnot Yokogawa CENTUM VP
  • Connecting plant floor data to SQL and business systemsnot Yokogawa CENTUM VP

Yokogawa CENTUM VP

  • Replacing end-of-life CENTUM CS 3000 controllers during a refinery turnaround without pulling field cablingnot Ignition
  • Greenfield LNG train where the control and safety systems must share one operator console and one event lognot Ignition
  • Specialty chemicals batch plant needing sequence control with recipe management and full electronic batch recordsnot Ignition
  • Combined cycle power station where 99.99999 percent availability figures are written into the contractnot Ignition

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Ignition

  • Requires real engineering to implement; it is a platform rather than a finished application
  • Steep learning curve, and Inductive Automation runs its own training programme because of it
  • Self-hosted and self-supported by default, so plant IT carries the availability burden
  • Module-based pricing means the entry figure is rarely the final one

Yokogawa CENTUM VP

  • There is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • Engineering and commissioning routinely cost several times the hardware and software, and owners who budget from the equipment quote alone are consistently short.
  • The ecosystem is closed: controllers, I/O and diagnostics are Yokogawa, and third-party alternatives at the controller layer do not exist, so the vendor holds pricing power for the twenty years or more the plant runs.
  • Operator stations run on Windows and are tied to specific validated Windows releases, so operating system end-of-life forces console refresh cycles that are governed by Yokogawa validation rather than by your IT policy.
  • Engineering staff who know CENTUM are scarce outside Japan, the Middle East and South East Asia, and in North America and Europe you will pay a premium or depend on Yokogawa’s own services organisation for changes.

Pricing, plan by plan

Ignition

On request

No published plan breakdown. See the Ignition review.

Yokogawa CENTUM VP

On request
  • CENTUM VP$undefined/year
    • Priced as an engineered system, not a per-seat licence
    • Cost driven by I/O count, controller redundancy and number of operator stations
    • Engineering, FAT, commissioning and training quoted separately and usually exceed hardware

Which should you pick?

Choose Ignition if

  • You need unlimited-client licensing.
  • You work on Windows, Linux, macOS, Web.
  • You also want scada and hmi.

Choose Yokogawa CENTUM VP if

  • You need field control station.
  • You work on Windows, On-premise.
  • You also want n-io.

Questions people ask

Is Ignition or Yokogawa CENTUM VP better?
Neither clearly leads. Ignition starts at On request and Yokogawa CENTUM VP at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Ignition or Yokogawa CENTUM VP?
Ignition starts at On request and Yokogawa CENTUM VP at On request.
Does Ignition or Yokogawa CENTUM VP run on more platforms?
Ignition runs on Windows, Linux, macOS, Web. Yokogawa CENTUM VP runs on Windows, On-premise.
What is Ignition best used for?
Ignition is most often used for plants where per-tag licensing has made expansion a budget conversation, replacing installed operator terminals with browser-based clients, connecting plant floor data to sql and business systems. Of those, plants where per-tag licensing has made expansion a budget conversation and replacing installed operator terminals with browser-based clients are not what Yokogawa CENTUM VP is typically brought in for.
What can Ignition do that Yokogawa CENTUM VP cannot?
Ignition covers Unlimited-client licensing, SCADA and HMI, Historian, MES modules. Yokogawa CENTUM VP covers Field Control Station, N-IO, Human Interface Station, ProSafe-RS integration.

Answered from the vendors’ own pages

Ignition: What does Ignition cost?

It publishes per-server module pricing with unlimited clients, tags and connections, so cost does not scale with how many people use it.

Yokogawa CENTUM VP: Can I upgrade from CENTUM CS 3000 without rewiring the plant?

Yes. Yokogawa sells migration packages that replace the controller and keep existing field wiring and marshalling, which is the main reason CENTUM installations stay CENTUM.

Ignition: Why does unlimited-client licensing matter?

Traditional SCADA is licensed per tag or per screen, which turns adding an operator terminal into a purchase. Ignition removes that ceiling.

Yokogawa CENTUM VP: Is CENTUM VP sold as a subscription?

No. It is a capital purchase of hardware and licences with an annual service agreement for updates and support.

Ignition: Is it a finished application?

No, it is a platform. Screens, tags and logic are built for the specific plant, which is real engineering work.

Yokogawa CENTUM VP: How does it compare with Emerson DeltaV on cost?

Neither publishes prices. CENTUM tends to win on brownfield migration cost because the field wiring stays; DeltaV tends to be cheaper on small greenfield systems.

Yokogawa CENTUM VP: Do I need a separate safety system?

Yes, for SIL-rated functions. ProSafe-RS is the Yokogawa SIS and shares the CENTUM engineering database and operator console.

Share

Related pages

Other head to heads