Softwr

Manufacturing · head to head

Rockwell FactoryTalk vs Yokogawa CENTUM VP

Rockwell FactoryTalk logo

Rockwell FactoryTalk

Manufacturing

Rockwell Automation software portfolio for HMI, historian, analytics and industrial data

From
On request
Rated
-
Yokogawa CENTUM VP logo

Yokogawa CENTUM VP

Manufacturing

Distributed control system for continuous process plants with a documented 30-year upgrade path

From
On request
Rated
-

The short version

  • Each has a real cost: Rockwell FactoryTalk factoryTalk is a brand, not a product, so a quote that says FactoryTalk may cover any of six separately licensed things; buyers repeatedly find that the demo they saw needed View plus Historian plus a Hub subscription.; Yokogawa CENTUM VP there is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • They diverge on capability: Rockwell FactoryTalk covers FactoryTalk View SE and ME, Yokogawa CENTUM VP covers Field Control Station.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Rockwell FactoryTalk and Yokogawa CENTUM VP actually diverge.

Attributes where Rockwell FactoryTalk and Yokogawa CENTUM VP differ
AttributeRockwell FactoryTalkYokogawa CENTUM VP
PlatformsWindows, Linux, Web, CloudWindows, On-premise

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Manufacturing).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Rockwell FactoryTalk

  • FactoryTalk View SE and ME
  • FactoryTalk Historian
  • FactoryTalk Optix
  • FactoryTalk Batch
  • FactoryTalk Hub
  • Native Logix tags

Only in Yokogawa CENTUM VP

  • Field Control Station
  • N-IO
  • Human Interface Station
  • ProSafe-RS integration
  • Vnet/IP
  • Migration from CS 1000 and CS 3000
  • Exaquantum integration
  • Alarm management

What people use each for

The jobs each tool is most often brought in to do.

Rockwell FactoryTalk

  • A plant standardised on ControlLogix that needs supervisory HMI without building and maintaining an OPC layer between controller and screennot Yokogawa CENTUM VP
  • A hybrid manufacturer needing ISA-88 batch execution audited against recipes, where FactoryTalk Batch is already validated in the industrynot Yokogawa CENTUM VP
  • Consolidating machine-level HMI screens across many Allen-Bradley lines under one tag model and one alarm schemenot Yokogawa CENTUM VP
  • Adding a plant historian quickly where the site has Rockwell distribution support but no PI administrator on staffnot Yokogawa CENTUM VP

Yokogawa CENTUM VP

  • Replacing end-of-life CENTUM CS 3000 controllers during a refinery turnaround without pulling field cablingnot Rockwell FactoryTalk
  • Greenfield LNG train where the control and safety systems must share one operator console and one event lognot Rockwell FactoryTalk
  • Specialty chemicals batch plant needing sequence control with recipe management and full electronic batch recordsnot Rockwell FactoryTalk
  • Combined cycle power station where 99.99999 percent availability figures are written into the contractnot Rockwell FactoryTalk

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Rockwell FactoryTalk

  • FactoryTalk is a brand, not a product, so a quote that says FactoryTalk may cover any of six separately licensed things; buyers repeatedly find that the demo they saw needed View plus Historian plus a Hub subscription.
  • Licensing units differ per product, tags for Historian, display tags and clients for View, another scheme for Optix, which makes forecasting the cost of a plant expansion genuinely hard.
  • The migration of products onto FactoryTalk Hub subscriptions converts what used to be a perpetual licence into an annual payment where lapsing stops the software, changing a capital purchase into an operating one you cannot exit.
  • Value drops sharply outside an Allen-Bradley estate; against a Siemens or Mitsubishi PLC you are back to OPC UA and lose the main reason to buy FactoryTalk at all.
  • There is no public price list and buying is through distribution, so two plants of identical size in the same company can pay materially different amounts depending on when and how they negotiated.

Yokogawa CENTUM VP

  • There is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • Engineering and commissioning routinely cost several times the hardware and software, and owners who budget from the equipment quote alone are consistently short.
  • The ecosystem is closed: controllers, I/O and diagnostics are Yokogawa, and third-party alternatives at the controller layer do not exist, so the vendor holds pricing power for the twenty years or more the plant runs.
  • Operator stations run on Windows and are tied to specific validated Windows releases, so operating system end-of-life forces console refresh cycles that are governed by Yokogawa validation rather than by your IT policy.
  • Engineering staff who know CENTUM are scarce outside Japan, the Middle East and South East Asia, and in North America and Europe you will pay a premium or depend on Yokogawa’s own services organisation for changes.

Pricing, plan by plan

Rockwell FactoryTalk

On request
  • FactoryTalk$undefined/year
    • Sold through Rockwell distribution, not direct or self-service
    • View licensed by display tag count and client seats
    • Historian licensed by tag count

Yokogawa CENTUM VP

On request
  • CENTUM VP$undefined/year
    • Priced as an engineered system, not a per-seat licence
    • Cost driven by I/O count, controller redundancy and number of operator stations
    • Engineering, FAT, commissioning and training quoted separately and usually exceed hardware

Which should you pick?

Choose Rockwell FactoryTalk if

  • You need factorytalk view se and me.
  • You work on Windows, Linux, Web, Cloud.
  • You also want factorytalk historian.

Choose Yokogawa CENTUM VP if

  • You need field control station.
  • You work on Windows, On-premise.
  • You also want n-io.

Questions people ask

Is Rockwell FactoryTalk or Yokogawa CENTUM VP better?
Neither clearly leads. Rockwell FactoryTalk starts at On request and Yokogawa CENTUM VP at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Rockwell FactoryTalk or Yokogawa CENTUM VP?
Rockwell FactoryTalk starts at On request and Yokogawa CENTUM VP at On request.
Does Rockwell FactoryTalk or Yokogawa CENTUM VP run on more platforms?
Rockwell FactoryTalk runs on Windows, Linux, Web, Cloud. Yokogawa CENTUM VP runs on Windows, On-premise.
What is Rockwell FactoryTalk best used for?
Rockwell FactoryTalk is most often used for a plant standardised on controllogix that needs supervisory hmi without building and maintaining an opc layer between controller and screen, a hybrid manufacturer needing isa-88 batch execution audited against recipes, where factorytalk batch is already validated in the industry, consolidating machine-level hmi screens across many allen-bradley lines under one tag model and one alarm scheme, adding a plant historian quickly where the site has rockwell distribution support but no pi administrator on staff. Of those, a plant standardised on controllogix that needs supervisory hmi without building and maintaining an opc layer between controller and screen and a hybrid manufacturer needing isa-88 batch execution audited against recipes, where factorytalk batch is already validated in the industry are not what Yokogawa CENTUM VP is typically brought in for.
What can Rockwell FactoryTalk do that Yokogawa CENTUM VP cannot?
Rockwell FactoryTalk covers FactoryTalk View SE and ME, FactoryTalk Historian, FactoryTalk Optix, FactoryTalk Batch. Yokogawa CENTUM VP covers Field Control Station, N-IO, Human Interface Station, ProSafe-RS integration.

Answered from the vendors’ own pages

Rockwell FactoryTalk: Is FactoryTalk Historian the same as AVEVA PI?

It is built on the PI engine under an OEM arrangement, tuned for Rockwell integration. If you already run PI enterprise-wide, buying Historian too usually duplicates a system you have.

Yokogawa CENTUM VP: Can I upgrade from CENTUM CS 3000 without rewiring the plant?

Yes. Yokogawa sells migration packages that replace the controller and keep existing field wiring and marshalling, which is the main reason CENTUM installations stay CENTUM.

Rockwell FactoryTalk: Can I still buy FactoryTalk perpetually?

Some products yes, but the direction is toward FactoryTalk Hub subscriptions. Confirm per product before assuming a capital purchase is available.

Yokogawa CENTUM VP: Is CENTUM VP sold as a subscription?

No. It is a capital purchase of hardware and licences with an annual service agreement for updates and support.

Rockwell FactoryTalk: Does FactoryTalk work with non-Rockwell PLCs?

Yes, through OPC UA and drivers, but the native tag browse advantage disappears and the case for FactoryTalk over a cheaper independent SCADA weakens.

Yokogawa CENTUM VP: How does it compare with Emerson DeltaV on cost?

Neither publishes prices. CENTUM tends to win on brownfield migration cost because the field wiring stays; DeltaV tends to be cheaper on small greenfield systems.

Rockwell FactoryTalk: Where do I find pricing?

You cannot without a distributor. Rockwell publishes no list pricing for the FactoryTalk portfolio.

Yokogawa CENTUM VP: Do I need a separate safety system?

Yes, for SIL-rated functions. ProSafe-RS is the Yokogawa SIS and shares the CENTUM engineering database and operator console.

Share

Related pages

Other head to heads