Softwr

Construction · head to head

Kojo vs Reconstruct

Kojo logo

Kojo

Construction

Materials procurement and inventory for speciality trade contractors

From
On request
Rated
-
Reconstruct logo

Reconstruct

Construction

Reality capture and progress tracking that aligns site imagery to the model and the schedule

From
On request
Rated
-

The short version

  • Each has a real cost: Kojo benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.; Reconstruct pricing is quoted with nothing published, so a buyer cannot sanity-check a proposal against a list rate and has no way to know whether the price scales with projects, square footage or users until deep in the sales process.
  • They diverge on capability: Kojo covers Field material requests, Reconstruct covers Device-agnostic capture.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Kojo and Reconstruct actually diverge.

Attributes where Kojo and Reconstruct differ
AttributeKojoReconstruct

Identical on both: starting price (On request), pricing model (quote), free tier (No), platforms (Web, iOS, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Kojo

  • Field material requests
  • Multi-supplier quoting
  • Purchase order management
  • Inventory and warehouse
  • Committed cost visibility
  • Enterprise resource planning integration

Only in Reconstruct

  • Device-agnostic capture
  • Photogrammetry and mesh generation
  • 4D schedule alignment
  • Design overlay
  • Time slider
  • Measurement tools
  • Issue tracking
  • Remote walkthrough

What people use each for

The jobs each tool is most often brought in to do.

Kojo

  • An electrical or mechanical contractor where materials are close to half of job cost and buying happens dailynot Reconstruct
  • A trade contractor that cannot see committed material cost against a job until the invoice arrivesnot Reconstruct
  • A contractor consolidating purchasing across branches to negotiate better distributor pricingnot Reconstruct
  • A subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheetnot Reconstruct

Reconstruct

  • A general contractor whose monthly progress claim is regularly challenged by the owner, needing dated visual evidence tied to schedule activities rather than a folder of photosnot Kojo
  • An owner running projects in several countries who wants to cut executive site visits without accepting the contractor’s self-reported percentage completenot Kojo
  • A healthcare or data centre fit-out where above-ceiling services must be recorded before they are closed up, so later maintenance does not require demolitionnot Kojo
  • A delay or defect dispute where the decisive question is what was physically in place on a specific date and the only other evidence is contested emailnot Kojo

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Kojo

  • Benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • It serves speciality trade contractors; general contractors procure subcontracts rather than materials and get almost nothing from it.
  • Enterprise resource planning integration quality varies by system and version, so confirm the depth for your exact configuration rather than accepting the logo on the website.
  • Field adoption is the whole game, and foremen who lose signal in a plant room or basement revert to phoning the office within days unless offline capture genuinely works.
  • It changes purchasing process as well as software, so contractors whose buying authority is informal have to formalise who can commit money before the system produces clean data.

Reconstruct

  • Pricing is quoted with nothing published, so a buyer cannot sanity-check a proposal against a list rate and has no way to know whether the price scales with projects, square footage or users until deep in the sales process.
  • The whole value depends on disciplined recurring capture, and site teams treat walking the building with a camera as a low-priority chore, so datasets go stale exactly when a dispute makes them valuable.
  • Photogrammetry from handheld footage is less accurate than laser scanning, so it is fine for progress and coordination but should not be relied on for tight as-built tolerances or prefabrication dimensions.
  • Schedule alignment requires a well-structured schedule with activities that map to physical locations; on projects where the programme is a coarse rolled-up bar chart the progress calculation is close to meaningless.
  • It is another platform alongside Procore or Autodesk Construction Cloud rather than a replacement, so buyers add a subscription and a workflow rather than consolidating one, and the business case has to survive that.

Pricing, plan by plan

Kojo

On request
  • Kojo$undefined/year
    • Materials procurement workflow
    • Supplier quoting and purchase orders
    • Inventory tracking

Reconstruct

On request
  • Reconstruct$undefined/year
    • Quoted per project or per portfolio
    • Unlimited capture devices
    • 4D schedule alignment

Which should you pick?

Choose Kojo if

  • You need field material requests.
  • You work on Web, iOS, Android.
  • You also want multi-supplier quoting.

Choose Reconstruct if

  • You need device-agnostic capture.
  • You work on Web, iOS, Android.
  • You also want photogrammetry and mesh generation.

Questions people ask

Is Kojo or Reconstruct better?
Neither clearly leads. Kojo starts at On request and Reconstruct at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Kojo or Reconstruct?
Kojo starts at On request and Reconstruct at On request.
Does Kojo or Reconstruct run on more platforms?
Both run on Web, iOS, Android, so platform support will not decide this one for you.
What is Kojo best used for?
Kojo is most often used for an electrical or mechanical contractor where materials are close to half of job cost and buying happens daily, a trade contractor that cannot see committed material cost against a job until the invoice arrives, a contractor consolidating purchasing across branches to negotiate better distributor pricing, a subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheet. Of those, an electrical or mechanical contractor where materials are close to half of job cost and buying happens daily and a trade contractor that cannot see committed material cost against a job until the invoice arrives are not what Reconstruct is typically brought in for.
What can Kojo do that Reconstruct cannot?
Kojo covers Field material requests, Multi-supplier quoting, Purchase order management, Inventory and warehouse. Reconstruct covers Device-agnostic capture, Photogrammetry and mesh generation, 4D schedule alignment, Design overlay.

Answered from the vendors’ own pages

Kojo: Is this for general contractors?

No. It is built for speciality trade contractors buying materials. General contractors procure subcontracts and would get little from it.

Reconstruct: How much does Reconstruct cost?

Not published. It is quoted per project or portfolio. Ask specifically whether the price scales by project count, square footage or capture volume, because those give very different totals.

Kojo: What if our suppliers will not connect?

You lose most of the quoting benefit and keep only the internal workflow. Check distributor participation before purchase, because it determines the return.

Reconstruct: Do we need a drone or a laser scanner?

No. It works from 360 cameras and even smartphone video. Drones and scanners improve exterior and accuracy-critical coverage.

Kojo: Does it work without signal on site?

Field requests are designed for site use, and offline behaviour should be tested with your own crews in your worst locations, because that is where adoption is won or lost.

Reconstruct: How accurate is it?

Accurate enough for progress, coordination and dispute evidence. It is not a substitute for survey-grade laser scanning where tolerances matter.

Reconstruct: Who owns the captured data at closeout?

The customer. Confirm the export format and retention terms in the contract before handover, because a reality archive is only useful if you can still open it in five years.

Reconstruct: Does it replace Procore?

No. It integrates with Procore and Autodesk Construction Cloud and adds the visual as-built layer.

Share

Related pages

Other head to heads