Kojo vs Oracle Primavera Unifier

Kojo logo

Kojo

Construction

Materials procurement and inventory for speciality trade contractors

From
On request
Rated
-
Oracle Primavera Unifier logo

Oracle Primavera Unifier

Construction

Capital programme cost, contract and facilities management for owners running multi-year portfolios

From
On request
Rated
-

The short version

  • Each has a real cost: Kojo benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.; Oracle Primavera Unifier nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • They diverge on capability: Kojo covers Field material requests, Oracle Primavera Unifier covers uDesigner configuration.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Kojo and Oracle Primavera Unifier actually diverge.

Attributes where Kojo and Oracle Primavera Unifier differ
AttributeKojoOracle Primavera Unifier

Identical on both: starting price (On request), pricing model (quote), free tier (No), platforms (Web, iOS, Android), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Kojo

  • Field material requests
  • Multi-supplier quoting
  • Purchase order management
  • Inventory and warehouse
  • Committed cost visibility
  • Enterprise resource planning integration

Only in Oracle Primavera Unifier

  • uDesigner configuration
  • Cost sheet
  • Funding management
  • Change management
  • Facilities and asset management
  • Schedule integration
  • Document management
  • Reporting and BI Publisher

What people use each for

The jobs each tool is most often brought in to do.

Kojo

  • An electrical or mechanical contractor where materials are close to half of job cost and buying happens dailynot Oracle Primavera Unifier
  • A trade contractor that cannot see committed material cost against a job until the invoice arrivesnot Oracle Primavera Unifier
  • A contractor consolidating purchasing across branches to negotiate better distributor pricingnot Oracle Primavera Unifier
  • A subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheetnot Oracle Primavera Unifier

Oracle Primavera Unifier

  • A state transport agency tracking dozens of concurrent projects funded from separate multi-year appropriations, where the audit trail on which fund paid for which change order matters more than scheduling detailnot Kojo
  • A university estates office that needs one cost sheet spanning design, construction and handover, with the asset data surviving into facilities management rather than being rekeyednot Kojo
  • A utility that must produce regulator-facing cash flow and capitalisation reports directly from the project controls system rather than from a spreadsheet reconciled once a quarternot Kojo
  • An owner already committed to Primavera P6 and Aconex that wants cost and contract control in the same estate rather than adding a separate construction ERPnot Kojo

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Kojo

  • Benefits depend on distributors providing electronic catalogues and pricing, and a contractor whose main supplier will not participate is left keying quotes by hand.
  • It serves speciality trade contractors; general contractors procure subcontracts rather than materials and get almost nothing from it.
  • Enterprise resource planning integration quality varies by system and version, so confirm the depth for your exact configuration rather than accepting the logo on the website.
  • Field adoption is the whole game, and foremen who lose signal in a plant room or basement revert to phoning the office within days unless offline capture genuinely works.
  • It changes purchasing process as well as software, so contractors whose buying authority is informal have to formalise who can commit money before the system produces clean data.

Oracle Primavera Unifier

  • Nothing works until it is configured, so the first useful business process is months away and usually costs more in partner services than the first year of licences; organisations that budget for software and not for implementation stall.
  • Modules are licensed separately, so an organisation that starts with Project Controls and later wants facilities and asset management faces a second negotiation at whatever list price applies then, not the rate it originally agreed.
  • Per-user licensing punishes occasional participants: a project sponsor who approves four invoices a year consumes the same licence as a full-time cost controller unless workflows are redesigned to keep them out of the system.
  • Oracle's term licence pricing is a percentage of the perpetual list rising with duration, which means a one-year term looks affordable and then the renewal maths pushes buyers into long commitments they cannot easily exit.
  • The interface is dated relative to modern construction software and field users resist it, so many implementations end up with Unifier as an office system and a separate mobile tool for site, which reintroduces the data gap it was bought to close.

Pricing, plan by plan

Kojo

On request
  • Kojo$undefined/year
    • Materials procurement workflow
    • Supplier quoting and purchase orders
    • Inventory tracking

Oracle Primavera Unifier

On request
  • Unifier Project Controls$undefined/year
    • Per-user licensing
    • Cost, contract and change management
    • uDesigner business process configuration
  • Unifier Facilities and Asset Management$undefined/year
    • Separately licensed module
    • Asset register and maintenance
    • Space and portfolio management

Which should you pick?

Choose Kojo if

  • You need field material requests.
  • You work on Web, iOS, Android.
  • You also want multi-supplier quoting.

Choose Oracle Primavera Unifier if

  • You need udesigner configuration.
  • You work on Web, iOS, Android.
  • You also want cost sheet.

Questions people ask

Is Kojo or Oracle Primavera Unifier better?
Neither clearly leads. Kojo starts at On request and Oracle Primavera Unifier at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Kojo or Oracle Primavera Unifier?
Kojo starts at On request and Oracle Primavera Unifier at On request.
Does Kojo or Oracle Primavera Unifier run on more platforms?
Both run on Web, iOS, Android, so platform support will not decide this one for you.
What is Kojo best used for?
Kojo is most often used for an electrical or mechanical contractor where materials are close to half of job cost and buying happens daily, a trade contractor that cannot see committed material cost against a job until the invoice arrives, a contractor consolidating purchasing across branches to negotiate better distributor pricing, a subcontractor tracking warehouse stock and job transfers that currently live in a spreadsheet. Of those, an electrical or mechanical contractor where materials are close to half of job cost and buying happens daily and a trade contractor that cannot see committed material cost against a job until the invoice arrives are not what Oracle Primavera Unifier is typically brought in for.
What can Kojo do that Oracle Primavera Unifier cannot?
Kojo covers Field material requests, Multi-supplier quoting, Purchase order management, Inventory and warehouse. Oracle Primavera Unifier covers uDesigner configuration, Cost sheet, Funding management, Change management.

Answered from the vendors’ own pages

Kojo: Is this for general contractors?

No. It is built for speciality trade contractors buying materials. General contractors procure subcontracts and would get little from it.

Oracle Primavera Unifier: Does Oracle publish Unifier pricing?

No. Unifier is quoted per user and per module through Oracle or a partner. Global price lists exist for some Primavera products but Unifier is negotiated.

Kojo: What if our suppliers will not connect?

You lose most of the quoting benefit and keep only the internal workflow. Check distributor participation before purchase, because it determines the return.

Oracle Primavera Unifier: Is Unifier the same as Primavera P6?

No. P6 is scheduling. Unifier is cost, contract, change and asset management. Owners commonly run both and integrate them.

Kojo: Does it work without signal on site?

Field requests are designed for site use, and offline behaviour should be tested with your own crews in your worst locations, because that is where adoption is won or lost.

Oracle Primavera Unifier: Can we still buy a perpetual licence?

Yes, perpetual licensing remains available alongside term licences, and Oracle prices terms as a percentage of the perpetual list. Check which your quote is based on.

Oracle Primavera Unifier: Who owns the data at project closeout?

The customer owns its data. Export is possible through the API and reporting layer, but configured business process records do not move cleanly into another system, so plan closeout extraction before you need it.

Oracle Primavera Unifier: Is it suitable for a general contractor?

Rarely. Unifier is built around the owner's funding and contract position. Contractors are usually better served by Procore or Autodesk Construction Cloud.