Softwr

Construction · head to head

Billd vs Buildots

Billd logo

Billd

Construction

Material financing and pay application advances for commercial subcontractors

From
On request
Rated
-
Buildots logo

Buildots

Construction

Hard hat mounted 360 cameras and computer vision that score build progress against the BIM model

From
On request
Rated
-

The short version

  • Each has a real cost: Billd the contractor carries the fee rather than the supplier, so unless the cost is bid into the job or offset by a negotiated supplier cash discount, financed material is simply more expensive material.; Buildots tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.
  • They diverge on capability: Billd covers Material financing, Buildots covers Hard hat 360 capture.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Billd and Buildots actually diverge.

Attributes where Billd and Buildots differ
AttributeBilldBuildots
PlatformsWebWeb, iOS, Android

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Billd

  • Material financing
  • Pay App Advance
  • Same-day supplier funding
  • Supplier network terms
  • Credit line for materials
  • Online account portal

Only in Buildots

  • Hard hat 360 capture
  • Model to as-built comparison
  • Per activity progress scoring
  • Programme deviation alerts
  • Delay forecasting
  • Visual evidence trail
  • Subcontractor performance reporting

What people use each for

The jobs each tool is most often brought in to do.

Billd

  • An electrical subcontractor that has won a job larger than its cash position can carry through the first three material buysnot Buildots
  • A concrete contractor whose general contractor pays at 75 days while the supplier expects 30not Buildots
  • A growing mechanical firm that wants to negotiate a supplier cash discount by paying immediately, funded by Billdnot Buildots
  • A subcontractor with a signed pay application sitting unpaid that needs payroll covered before the cheque landsnot Buildots

Buildots

  • A residential tower where the same fit-out sequence repeats on forty floors and the contractor wants an objective read on cycle timenot Billd
  • A hospital or data centre fit-out where MEP first fix progress is disputed between the main contractor and trades every monthnot Billd
  • A developer that wants independent progress evidence before certifying an interim payment applicationnot Billd
  • A contractor building a production rate history across projects so future programmes are based on measured output rather than assumptionnot Billd

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Billd

  • The contractor carries the fee rather than the supplier, so unless the cost is bid into the job or offset by a negotiated supplier cash discount, financed material is simply more expensive material.
  • No rate card is published, so the effective annualised cost is only visible after underwriting and cannot be compared against a bank line or a card facility before you apply.
  • A 120 day term assumes the general contractor pays roughly on time; if the GC drags past that, the subcontractor owes Billd on schedule regardless of whether it has been paid.
  • This is credit, not construction software, so it adds a debt obligation and a covenant relationship to a business that a surety and a bonding agent will look at when setting bonding capacity.
  • Coverage is US commercial construction, so contractors outside that market or working residential get little from it, and eligibility depends on project type and the creditworthiness of the paying party.

Buildots

  • Tracking depends on a BIM model maintained at construction level of detail; on a job where the model is stale or was never built for coordination, the comparison degrades and much of the value disappears.
  • The data only arrives if someone walks the site every week with the camera, so coverage decays quietly when the site team is under pressure, exactly when the reporting is most needed.
  • Pricing is per project rather than per seat and includes hardware, so a contractor cannot roll it out cheaply across a portfolio of small jobs and it is uneconomic below a certain project value.
  • It reads interior fit-out and repetitive vertical work far better than structure, groundworks or external envelope, so a large fraction of a project's programme is outside what it can score.
  • Making progress objective creates commercial friction with subcontractors whose valuations have historically been negotiated, and contractors who deploy it without addressing that in the subcontract get pushback rather than adoption.

Pricing, plan by plan

Billd

On request
  • Material Financing$undefined/year
    • Supplier paid upfront
    • Repayment up to 120 days
    • Fee set per draw after underwriting
  • Pay App Advance$undefined/year
    • Advance against billed and uncollected work
    • Purchase fee deducted from the advance
    • Terms set per contractor

Buildots

On request
  • Buildots$undefined/year
    • Priced per project by size and duration
    • Camera hardware included in the engagement
    • Model onboarding and setup quoted separately

Which should you pick?

Choose Billd if

  • You need material financing.
  • You also want pay app advance.

Choose Buildots if

  • You need hard hat 360 capture.
  • You work on Web, iOS, Android.
  • You also want model to as-built comparison.

Questions people ask

Is Billd or Buildots better?
Neither clearly leads. Billd starts at On request and Buildots at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Billd or Buildots?
Billd starts at On request and Buildots at On request.
Does Billd or Buildots run on more platforms?
Billd runs on Web. Buildots runs on Web, iOS, Android.
What is Billd best used for?
Billd is most often used for an electrical subcontractor that has won a job larger than its cash position can carry through the first three material buys, a concrete contractor whose general contractor pays at 75 days while the supplier expects 30, a growing mechanical firm that wants to negotiate a supplier cash discount by paying immediately, funded by billd, a subcontractor with a signed pay application sitting unpaid that needs payroll covered before the cheque lands. Of those, an electrical subcontractor that has won a job larger than its cash position can carry through the first three material buys and a concrete contractor whose general contractor pays at 75 days while the supplier expects 30 are not what Buildots is typically brought in for.
What can Billd do that Buildots cannot?
Billd covers Material financing, Pay App Advance, Same-day supplier funding, Supplier network terms. Buildots covers Hard hat 360 capture, Model to as-built comparison, Per activity progress scoring, Programme deviation alerts.

Answered from the vendors’ own pages

Billd: Who pays Billd's fee, the contractor or the supplier?

The contractor. The supplier is paid upfront in full and carries no credit risk.

Buildots: What does Buildots cost?

It is quoted per project based on size, duration and scope, with camera hardware included. Nothing is published.

Billd: Does Billd publish rates?

No. Cost depends on term, product and underwriting outcome and is disclosed in the offer.

Buildots: Do I need a BIM model?

Yes. The system scores progress by comparing captured conditions against model objects, so the model quality sets the ceiling on accuracy.

Billd: What happens if my general contractor pays late?

You still owe Billd on the agreed schedule. The 120 day term is designed to cover a normal pay cycle, not a dispute.

Buildots: What kind of projects suit it?

Repetitive vertical work with heavy interior fit-out. Civil, groundworks and external envelope are poorly covered.

Billd: Does using Billd affect bonding capacity?

It is a debt facility, so a surety will consider it. Discuss it with your bonding agent before drawing heavily.

Buildots: Who does the site walks?

Your own site team, typically once or twice a week. There is no Buildots operator on site.

Share

Related pages