Procore: If the real problem is slow billing and pay application administration rather than a lack of capital

Material financing and pay application advances for commercial subcontractors
As of 1 September 2026, Billd's pricing is not published; the vendor quotes on request. A construction finance platform that pays your material supplier upfront and lets you repay in up to 120 days. Softwr lists it under Construction. Billd is available on Web.
Overview
Billd sits between commercial subcontractors and their material suppliers. A subcontractor submits a supplier quote, Billd pays the supplier directly and often same day, material ships to site, and the subcontractor repays Billd over a term of up to 120 days that is meant to line up with when the general contractor actually pays. A second product, Pay App Advance, funds up to the full value of work already billed but not yet collected, less a purchase fee. The commercially important detail is who pays. In ordinary supplier trade credit the supplier extends 30 day terms and prices the risk into material. With Billd the supplier is made whole immediately and carries no credit exposure, and the subcontractor pays the financing fee. That means the buying decision belongs to the subcontractor and the fee is a direct cost of the job, so it has to be either bid into the work or offset by the cash discount a supplier will give for immediate payment. Firms that negotiate that discount can get much of the fee back; firms that do not are simply paying more for material. Buyers are commercial subcontractors, typically electrical, mechanical, concrete and drywall, whose growth is capped by working capital rather than by demand. Billd does not publish a rate card, and the effective cost depends on term, credit assessment and product. Underwriting is based on the business rather than personal collateral, but this is credit, not software, and the trade-off is that a slow-paying general contractor turns a 120 day term into a problem the subcontractor owns alone.
The honest half
Concrete and checkable, so you can decide whether any of them matter to you. This is the half of a review a vendor will not write about Billd.
Cross-shopped
Each pairing was judged by two reviewers asking whether a buyer would genuinely weigh the two against each other. The ones that failed were deleted rather than published.


Procore: If the real problem is slow billing and pay application administration rather than a lack of capital


Sage 300 Construction: If you need job cost visibility to see where cash is actually trapped before borrowing against it


Briq: If forecasting cash across the whole portfolio is the gap rather than funding a single material buy
Pricing
Taken from the vendor's own pricing page. Prices move, so check before you buy.
Material Financing
On request
Pay App Advance
On request
Capabilities
Material financing
Billd pays the supplier upfront against a quote, repayment over up to 120 days
Pay App Advance
Advances up to the full value of billed but uncollected work, less a fee
Same-day supplier funding
Approved material purchases often funded and paid the same day
Supplier network terms
Suppliers get paid immediately while offering the contractor extended terms
Credit line for materials
Approved facility a contractor draws against per project
Online account portal
Submit quotes, track draws and manage repayment schedules
Answered, with sources
Each answer names the page it came from, so you can check it rather than take our word for it.
The contractor. The supplier is paid upfront in full and carries no credit risk.
No. Cost depends on term, product and underwriting outcome and is disclosed in the offer.
You still owe Billd on the agreed schedule. The 120 day term is designed to cover a normal pay cycle, not a dispute.
It is a debt facility, so a surety will consider it. Discuss it with your bonding agent before drawing heavily.
Keep looking
Financial automation and forecasting for contractors sitting on top of construction ERP
Pay application and billing workflow built only for speciality subcontractors
Construction payment, lien waiver and compliance workflow where the subcontractor pays the fee
Contract risk review that flags the clauses in a construction contract that cost money later
Workforce planning for general contractors allocating salaried project staff across a pipeline
Subcontractor pay application and lien waiver exchange for general contractors in North America
Subcontractor billing and lien waiver automation, formerly sold as Flashtract
Digital change order and time and materials tag exchange between subcontractors and general contractors
Materials procurement and inventory for speciality trade contractors
2D and BIM quantity takeoff with live-linked estimating workbooks for quantity surveyors and estimators
Drone-based progress tracking, quality control and commissioning built specifically for solar farms
Weatherproof autonomous drone base for remote-operated inspection and site documentation flights
Automated drawing takeoff that measures and labels spaces without manual tracing
Pay application and billing workflow built only for speciality subcontractors
BIM software for structural engineering and construction
Softwr does not host reviews and shows no star rating for Billd, because a rating we did not collect is not ours to publish. What is here is the pricing and platform detail from the vendor’s own pages, limitations we could state concretely, and alternatives a reviewer confirmed people weigh against it. Tell us if any of it is wrong.
What people switch to, and what they give up
Every tier, and where the cost actually lands
Put it head to head with anything we hold
Its rating, and an embed for your own site
Hard hat mounted 360 cameras and computer vision that score build progress against the BIM model
quoteSubcontractor pay application and lien waiver exchange for general contractors in North America
quoteGenerative construction scheduling that produces and compares millions of build sequences
quoteAustralian estimating and on-screen takeoff in one window, priced openly per user per month
Per user per monthHeavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices
quote