B2W Estimate vs Contractor Foreman

B2W Estimate logo

B2W Estimate

Construction

Heavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices

From
On request
Rated
-
Contractor Foreman logo

Contractor Foreman

Construction

Construction management for contractors covering scheduling, invoicing and crew management

From
Free
Rated
-

The short version

  • Only Contractor Foreman has a free tier, so it costs nothing to try first.
  • Each has a real cost: B2W Estimate pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle; Contractor Foreman 100-day money-back guarantee only available for annual billing, not monthly
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which B2W Estimate and Contractor Foreman actually diverge.

Attributes where B2W Estimate and Contractor Foreman differ
AttributeB2W EstimateContractor Foreman
Starting priceOn requestFree
Pricing modelquotesubscription
Free tierNoYes
PlatformsWindows, WebWeb

Identical on both: user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in B2W Estimate

  • Production-rate estimating
  • Central resource database
  • Concurrent bidding
  • DOT bid file export
  • Alternates and addenda
  • Field feedback loop
  • Bid analysis

Only in Contractor Foreman

Nothing recorded that B2W Estimate does not also cover.

What people use each for

The jobs each tool is most often brought in to do.

B2W Estimate

  • A grading contractor bids a 40 million dollar DOT job and needs to test three crew configurations against the same quantities before the bid deadlinenot Contractor Foreman
  • A utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimatenot Contractor Foreman
  • An estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by handnot Contractor Foreman
  • A contractor moving off HeavyBid wants a resource database it can reuse across estimating, dispatch and fleet maintenancenot Contractor Foreman

Contractor Foreman

  • Construction project management and trackingnot B2W Estimate
  • Field team crew coordinationnot B2W Estimate
  • Project timeline managementnot B2W Estimate
  • Multi-project workload balancing for contractorsnot B2W Estimate

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

B2W Estimate

  • Pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle
  • The system is worthless until your own crews, equipment and production rates are loaded, which is typically several months of a senior estimator's time before the first bid comes out
  • It is aimed squarely at heavy civil self-performing work, so a general contractor whose bids are mostly subcontractor quotes gets very little from the production-rate engine
  • The Trimble acquisition means the product now competes internally with other Trimble civil estimating assets, and buyers should ask directly about the long term roadmap for overlapping products before signing a multi-year term
  • Reporting outside the Inform module is limited, so organisations that want bid analytics across years typically end up buying another module or extracting to a warehouse

Contractor Foreman

  • 100-day money-back guarantee only available for annual billing, not monthly
  • All plans include 30-day trial, but commitment ends trial with charges
  • Stripe payment adds 2.9% + $0.30 per transaction fee; ACH adds 1% + $0.30 max fee

Pricing, plan by plan

B2W Estimate

On request
  • B2W Estimate$undefined/year
    • Priced per estimator seat with a separate server or hosting component
    • Additional B2W modules quoted separately
    • Implementation and resource database setup billed as a project

Contractor Foreman

Free
  • Basic$49/month
    • 1 user
    • 30-day free trial
    • 100-day money-back guarantee (annual only)
  • Standard$105/month
    • 3 users
    • 30-day free trial
    • 100-day money-back guarantee (annual only)
  • Plus$166/month
    • 8 users
    • 30-day free trial
    • 100-day money-back guarantee (annual only)
  • Pro$221/month
    • 15 users
    • 30-day free trial
    • 100-day money-back guarantee (annual only)

Which should you pick?

Choose B2W Estimate if

  • You need production-rate estimating.
  • You work on Windows, Web.
  • You also want central resource database.

Choose Contractor Foreman if

  • You want to start without paying.

Questions people ask

Is B2W Estimate or Contractor Foreman better?
Neither clearly leads. B2W Estimate starts at On request and Contractor Foreman at Free, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, B2W Estimate or Contractor Foreman?
Contractor Foreman has a free tier; the other does not. Paid plans start at On request for B2W Estimate and Free for Contractor Foreman.
Does B2W Estimate or Contractor Foreman run on more platforms?
B2W Estimate runs on Windows, Web. Contractor Foreman runs on Web.
Can I use Contractor Foreman for free?
Yes. Contractor Foreman has a free tier, so you can try it without paying. B2W Estimate starts at On request.
What is B2W Estimate best used for?
B2W Estimate is most often used for a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline, a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate, an estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by hand, a contractor moving off heavybid wants a resource database it can reuse across estimating, dispatch and fleet maintenance. Of those, a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline and a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate are not what Contractor Foreman is typically brought in for.
What can B2W Estimate do that Contractor Foreman cannot?
B2W Estimate covers Production-rate estimating, Central resource database, Concurrent bidding, DOT bid file export.

Answered from the vendors’ own pages

B2W Estimate: Is B2W Estimate still sold under its own name?

Yes. Trimble acquired B2W in 2022 and continues to sell it as B2W Estimate within the Trimble Construction portfolio.

Contractor Foreman: How much does Contractor Foreman cost?

Contractor Foreman pricing ranges from $49/month for 1 user (Basic) to $332/month for unlimited users (Unlimited). Annual payment provides 100-day money-back guarantee.

Source
B2W Estimate: Is there a perpetual licence?

Current sales are subscription based. Existing perpetual customers have been migrated toward subscription, so treat a perpetual arrangement as something to negotiate rather than assume.

Contractor Foreman: How many users are included in each Contractor Foreman plan?

Basic includes 1 user, Standard includes 3 users, Plus includes 8 users, Pro includes 15 users, and Unlimited plan includes unlimited users.

Source
B2W Estimate: How does it compare with HeavyBid?

Both are production-rate estimators for heavy civil. B2W's argument is the shared resource database across estimating, field tracking, dispatch and maintenance; HeavyBid's is depth of bidding features and a large installed base in highway work.

Contractor Foreman: Does Contractor Foreman offer a free trial?

Yes, all Contractor Foreman plans include a 30-day free trial with no charge until the trial ends. Annual plans also include a 100-day money-back guarantee.

Source
B2W Estimate: Does it work for building construction?

Poorly. It assumes self-performed work priced by crew output. Vertical builders bidding mostly subcontracted scopes should look elsewhere.

Contractor Foreman: What payment methods does Contractor Foreman accept?

Contractor Foreman accepts Stripe payments (2.9% + $0.30 per transaction) and ACH bank transfers (1% + $0.30 max fee).