Softwr

Manufacturing · head to head

Oqton vs Yokogawa CENTUM VP

Oqton logo

Oqton

Manufacturing

3D Systems manufacturing operating system for additive, narrowed after Geomagic was sold to Hexagon

From
On request
Rated
-
Yokogawa CENTUM VP logo

Yokogawa CENTUM VP

Manufacturing

Distributed control system for continuous process plants with a documented 30-year upgrade path

From
On request
Rated
-

The short version

  • Each has a real cost: Oqton 3D Systems sold the Geomagic portfolio to Hexagon in April 2025, so buyers who chose Oqton for an end-to-end scanning-to-production suite now deal with two separate vendors and two roadmaps.; Yokogawa CENTUM VP there is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • They diverge on capability: Oqton covers Manufacturing OS, Yokogawa CENTUM VP covers Field Control Station.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Oqton and Yokogawa CENTUM VP actually diverge.

Attributes where Oqton and Yokogawa CENTUM VP differ
AttributeOqtonYokogawa CENTUM VP
PlatformsWeb, Windows, APIWindows, On-premise

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Manufacturing).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Oqton

  • Manufacturing OS
  • Build preparation
  • Machine connectivity
  • Traceability
  • Automated nesting
  • Quality data

Only in Yokogawa CENTUM VP

  • Field Control Station
  • N-IO
  • Human Interface Station
  • ProSafe-RS integration
  • Vnet/IP
  • Migration from CS 1000 and CS 3000
  • Exaquantum integration
  • Alarm management

What people use each for

The jobs each tool is most often brought in to do.

Oqton

  • A metal additive production site scheduling builds across several machines rather than per operatornot Yokogawa CENTUM VP
  • A dental manufacturer needing batch to part traceability for regulated devicesnot Yokogawa CENTUM VP
  • A 3D Systems printer customer moving from prototyping to serial productionnot Yokogawa CENTUM VP
  • A factory automating build nesting to raise platform utilisationnot Yokogawa CENTUM VP

Yokogawa CENTUM VP

  • Replacing end-of-life CENTUM CS 3000 controllers during a refinery turnaround without pulling field cablingnot Oqton
  • Greenfield LNG train where the control and safety systems must share one operator console and one event lognot Oqton
  • Specialty chemicals batch plant needing sequence control with recipe management and full electronic batch recordsnot Oqton
  • Combined cycle power station where 99.99999 percent availability figures are written into the contractnot Oqton

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Oqton

  • 3D Systems sold the Geomagic portfolio to Hexagon in April 2025, so buyers who chose Oqton for an end-to-end scanning-to-production suite now deal with two separate vendors and two roadmaps.
  • No pricing is published, and licensing is split between the manufacturing OS and separately licensed build preparation modules, so the quoted figure is rarely the full cost.
  • Support is deepest on 3D Systems hardware despite multi-vendor claims, so a mixed fleet gets uneven data capture and control.
  • The parent company has been under financial pressure and has already divested a major software line, which is a genuine continuity risk for a system running a production floor.
  • It is additive-only, so a manufacturer with mixed processes needs a conventional MES alongside it and an integration between the two.

Yokogawa CENTUM VP

  • There is no published price list and no way to size a budget without engaging Yokogawa or an EPC, so early-stage comparison against DeltaV or Experion is guesswork until quotations arrive.
  • Engineering and commissioning routinely cost several times the hardware and software, and owners who budget from the equipment quote alone are consistently short.
  • The ecosystem is closed: controllers, I/O and diagnostics are Yokogawa, and third-party alternatives at the controller layer do not exist, so the vendor holds pricing power for the twenty years or more the plant runs.
  • Operator stations run on Windows and are tied to specific validated Windows releases, so operating system end-of-life forces console refresh cycles that are governed by Yokogawa validation rather than by your IT policy.
  • Engineering staff who know CENTUM are scarce outside Japan, the Middle East and South East Asia, and in North America and Europe you will pay a premium or depend on Yokogawa’s own services organisation for changes.

Pricing, plan by plan

Oqton

On request
  • Oqton Industrial Manufacturing OS$undefined/year
    • Annual subscription quoted by 3D Systems
    • Priced on connected machines and sites
    • Build preparation modules licensed separately

Yokogawa CENTUM VP

On request
  • CENTUM VP$undefined/year
    • Priced as an engineered system, not a per-seat licence
    • Cost driven by I/O count, controller redundancy and number of operator stations
    • Engineering, FAT, commissioning and training quoted separately and usually exceed hardware

Which should you pick?

Choose Oqton if

  • You need manufacturing os.
  • You work on Web, Windows, API.
  • You also want build preparation.

Choose Yokogawa CENTUM VP if

  • You need field control station.
  • You work on Windows, On-premise.
  • You also want n-io.

Questions people ask

Is Oqton or Yokogawa CENTUM VP better?
Neither clearly leads. Oqton starts at On request and Yokogawa CENTUM VP at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Oqton or Yokogawa CENTUM VP?
Oqton starts at On request and Yokogawa CENTUM VP at On request.
Does Oqton or Yokogawa CENTUM VP run on more platforms?
Oqton runs on Web, Windows, API. Yokogawa CENTUM VP runs on Windows, On-premise.
What is Oqton best used for?
Oqton is most often used for a metal additive production site scheduling builds across several machines rather than per operator, a dental manufacturer needing batch to part traceability for regulated devices, a 3d systems printer customer moving from prototyping to serial production, a factory automating build nesting to raise platform utilisation. Of those, a metal additive production site scheduling builds across several machines rather than per operator and a dental manufacturer needing batch to part traceability for regulated devices are not what Yokogawa CENTUM VP is typically brought in for.
What can Oqton do that Yokogawa CENTUM VP cannot?
Oqton covers Manufacturing OS, Build preparation, Machine connectivity, Traceability. Yokogawa CENTUM VP covers Field Control Station, N-IO, Human Interface Station, ProSafe-RS integration.

Answered from the vendors’ own pages

Oqton: Who owns Oqton?

3D Systems, which acquired it in 2021 and made it the central software brand.

Yokogawa CENTUM VP: Can I upgrade from CENTUM CS 3000 without rewiring the plant?

Yes. Yokogawa sells migration packages that replace the controller and keep existing field wiring and marshalling, which is the main reason CENTUM installations stay CENTUM.

Oqton: Did Oqton include Geomagic?

It did. 3D Systems completed the sale of the Geomagic portfolio, including Design X, Control X, Freeform and Wrap, to Hexagon for $123 million in April 2025. Oqton retained 3D Sprint, 3DXpert and the Manufacturing OS.

Yokogawa CENTUM VP: Is CENTUM VP sold as a subscription?

No. It is a capital purchase of hardware and licences with an annual service agreement for updates and support.

Oqton: Does Oqton work with printers from other manufacturers?

It connects to multi-vendor equipment, but the deepest integration and support is on 3D Systems machines.

Yokogawa CENTUM VP: How does it compare with Emerson DeltaV on cost?

Neither publishes prices. CENTUM tends to win on brownfield migration cost because the field wiring stays; DeltaV tends to be cheaper on small greenfield systems.

Oqton: How much does it cost?

Not published. It is quoted annually, typically on connected machines and sites, with build preparation modules licensed separately.

Yokogawa CENTUM VP: Do I need a separate safety system?

Yes, for SIL-rated functions. ProSafe-RS is the Yokogawa SIS and shares the CENTUM engineering database and operator console.

Share

Related pages

Other head to heads