Mining · head to head
K-MINE vs Whittle
The short version
- Each has a real cost: K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design; Whittle the Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.
- They diverge on capability: K-MINE covers Mine planning, Whittle covers Pit optimization.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which K-MINE and Whittle actually diverge.
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in K-MINE
- Mine planning
- 3D design
- Production scheduling
- Economic evaluation
- Risk analysis
- AutoCAD
Only in Whittle
- Pit optimization
- NPV maximization
- Cutoff grade analysis
- Pushback design
- Economic modeling
- MineSched
- PCBC
Both cover
- Vulcan
- Surpac
- Datamine
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
K-MINE
- Open pit surveying, pit design, scheduling and pit optimisationnot Whittle
- Underground mine design, stope optimisation and ventilation analysisnot Whittle
- Geological modelling and grade estimation from drillhole datanot Whittle
- Drill and blast design and slope stability analysisnot Whittle
Whittle
- Pit optimizationnot K-MINE
- Strategic planningnot K-MINE
- Feasibility studiesnot K-MINE
- Economic analysisnot K-MINE
- Scenario comparisonnot K-MINE
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
K-MINE
- Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
- A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
- Licences are online, with offline access limited to 2 days
- Training is priced by custom quote and is not included in the published module rates
- Volume discounts are referenced but no discount rate or qualifying quantity is published
Whittle
- The Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.
Pricing, plan by plan
K-MINE
On request- K-MINE Professional$9000/year
- Mine planning
- 3D design
- Scheduling
Whittle
On request- Whittle Standard$15000/year
- Pit optimization
- Economic analysis
- Multiple scenarios
- Whittle Enterprise$25000/year
- Advanced optimization
- Scheduling integration
- NPV maximization
Which should you pick?
Choose Whittle if
- You need pit optimization.
- You work on Windows.
- You also want npv maximization.
Questions people ask
- Is K-MINE or Whittle better?
- Neither clearly leads. K-MINE starts at On request and Whittle at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, K-MINE or Whittle?
- K-MINE starts at On request and Whittle at On request.
- Does K-MINE or Whittle run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is K-MINE best used for?
- K-MINE is most often used for open pit surveying, pit design, scheduling and pit optimisation, underground mine design, stope optimisation and ventilation analysis, geological modelling and grade estimation from drillhole data, drill and blast design and slope stability analysis. Of those, open pit surveying, pit design, scheduling and pit optimisation and underground mine design, stope optimisation and ventilation analysis are not what Whittle is typically brought in for.
- What can K-MINE do that Whittle cannot?
- K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. Whittle covers Pit optimization, NPV maximization, Cutoff grade analysis, Pushback design. Both handle Vulcan, Surpac, Datamine, Windows support.
Answered from the vendors’ own pages
K-MINE: How much does K-MINE cost?
K-MINE does not publish pricing publicly. Customers must visit the dedicated pricing page, request a demo, or contact the sales team via phone or scheduling link to obtain quote information.
SourceWhittle: Where can I find pricing for GEOVIA Whittle?
Whittle is an advanced strategic mine planning product. Pricing information is not available on the public product page and requires contacting Dassault Systèmes directly through their contact form.
SourceK-MINE: What pricing options does K-MINE offer?
K-MINE offers software licenses, consulting services, training, and support options. Exact pricing is determined through custom quotes based on requirements.
SourceRelated pages
Other head to heads
- K-MINE vs Deswik Suite
- K-MINE vs Dassault Systemes GEOVIA
- K-MINE vs Caterpillar MineStar
- K-MINE vs Leapfrog Geo
- K-MINE vs MineSight
- K-MINE vs RPMGlobal TALPAC
- K-MINE vs Datamine
- K-MINE vs Minemax
- K-MINE vs Vulcan
- K-MINE vs PCBC
- K-MINE vs Carlson Mining
- K-MINE vs UDEC
- K-MINE vs Vulcan Geological Modelling
- K-MINE vs Wenco
- K-MINE vs OptiMine
- K-MINE vs Minemax Planner
- K-MINE vs MinePlan
- K-MINE vs 3DEC
- K-MINE vs acQuire GIM Suite
- K-MINE vs CorePlan
- K-MINE vs Cority EHS
- K-MINE vs Enablon EHS
- K-MINE vs Envirosuite
- Whittle vs Deswik Suite
- Whittle vs Dassault Systemes GEOVIA
- Whittle vs Caterpillar MineStar
- Whittle vs Leapfrog Geo
- Whittle vs MineSight
- Whittle vs RPMGlobal TALPAC
- Whittle vs Datamine
- Whittle vs Minemax
- Whittle vs Vulcan
- Whittle vs PCBC
- Whittle vs Carlson Mining
- Whittle vs UDEC
- Whittle vs Vulcan Geological Modelling
- Whittle vs Wenco
- Whittle vs OptiMine
- Whittle vs Minemax Planner
- Whittle vs MinePlan
- Whittle vs 3DEC
- Whittle vs acQuire GIM Suite
- Whittle vs CorePlan
- Whittle vs Cority EHS
- Whittle vs Enablon EHS
- Whittle vs Envirosuite


