Softwr

Software · head to head

3DEC vs K-MINE

3

3DEC

Software

3D distinct element code for underground mining

From
On request
Rated
-
K-MINE logo

K-MINE

Software

Mine planning and optimization software

From
On request
Rated
-

The short version

  • Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
  • They diverge on capability: 3DEC covers 3D distinct element analysis, K-MINE covers Mine planning.

Where they differ

Only the attributes on which 3DEC and K-MINE actually diverge.

Attributes where 3DEC and K-MINE differ
Attribute3DECK-MINE
PlatformsWindows, LinuxWindows
Founded19812001

Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in 3DEC

  • 3D distinct element analysis
  • Block motion tracking
  • Contact detection
  • Support design
  • Dynamic simulation
  • FLAC3D
  • Leapfrog
  • Python

Only in K-MINE

  • Mine planning
  • 3D design
  • Production scheduling
  • Economic evaluation
  • Risk analysis
  • Surpac
  • Datamine
  • AutoCAD

Both cover

  • Vulcan
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

3DEC

  • Three-dimensional analysis of jointed rock and discontinuous materialsnot K-MINE
  • Slope stability and pillar analysis for miningnot K-MINE
  • Blast and earthquake dynamic analysisnot K-MINE
  • Groundwater flow through fractured rocknot K-MINE
  • Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot K-MINE

K-MINE

  • Open pit surveying, pit design, scheduling and pit optimisationnot 3DEC
  • Underground mine design, stope optimisation and ventilation analysisnot 3DEC
  • Geological modelling and grade estimation from drillhole datanot 3DEC
  • Drill and blast design and slope stability analysisnot 3DEC

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

3DEC

  • Pricing is not published; licences are quoted, with subscription and perpetual options
  • A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer

K-MINE

  • Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
  • Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
  • A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
  • Licences are online, with offline access limited to 2 days
  • Training is priced by custom quote and is not included in the published module rates
  • Volume discounts are referenced but no discount rate or qualifying quantity is published

Pricing, plan by plan

3DEC

On request
  • 3DEC Professional$25000/year
    • 3D distinct element analysis
    • Block-to-block interaction
    • Support installation modeling

K-MINE

On request
  • K-MINE Professional$9000/year
    • Mine planning
    • 3D design
    • Scheduling

Which should you pick?

Choose 3DEC if

  • You need 3d distinct element analysis.
  • You work on Windows, Linux.
  • You also want block motion tracking.

Choose K-MINE if

  • You need mine planning.
  • You work on Windows.
  • You also want 3d design.

Questions people ask

Is 3DEC or K-MINE better?
Neither clearly leads. 3DEC starts at On request and K-MINE at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, 3DEC or K-MINE?
3DEC starts at On request and K-MINE at On request.
Does 3DEC or K-MINE run on more platforms?
3DEC runs on Windows, Linux. K-MINE runs on Windows.
What is 3DEC best used for?
3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what K-MINE is typically brought in for.
What can 3DEC do that K-MINE cannot?
3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. Both handle Vulcan, Windows support.

Related pages

Other head to heads