Mining & Resources · head to head
Enablon EHS vs K-MINE

Enablon EHS
Mining & Resources
Environmental health and safety management
- From
- On request
- Rated
- -

K-MINE
Mining & Resources
Mine planning and optimization software
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Enablon EHS uK Find a Tender award notice records Enablon SAS awarded a 5 year contract by Cadent Gas Limited for its EHS management solution valued at £1,275,353.62 excluding VAT (£1,530,424.34 including VAT); this is a contract value, not a price list; K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- They diverge on capability: Enablon EHS covers Incident management, K-MINE covers Mine planning.
Where they differ
Only the attributes on which Enablon EHS and K-MINE actually diverge.
| Attribute | Enablon EHS | K-MINE |
|---|---|---|
| Platforms | Web, Windows, Ios, Android | Windows |
| Founded | 1995 | 2001 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Mining & Resources).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Enablon EHS
- Incident management
- Health and safety compliance
- Environmental management
- Risk assessment
- Audit management
- SAP
- Oracle
- Salesforce
Only in K-MINE
- Mine planning
- 3D design
- Production scheduling
- Economic evaluation
- Risk analysis
- Vulcan
- Surpac
- Datamine
Both cover
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Enablon EHS
- Health and safety managementnot K-MINE
- Incident reportingnot K-MINE
- Risk assessmentnot K-MINE
- Compliance trackingnot K-MINE
- Audit managementnot K-MINE
K-MINE
- Open pit surveying, pit design, scheduling and pit optimisationnot Enablon EHS
- Underground mine design, stope optimisation and ventilation analysisnot Enablon EHS
- Geological modelling and grade estimation from drillhole datanot Enablon EHS
- Drill and blast design and slope stability analysisnot Enablon EHS
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Enablon EHS
- UK Find a Tender award notice records Enablon SAS awarded a 5 year contract by Cadent Gas Limited for its EHS management solution valued at £1,275,353.62 excluding VAT (£1,530,424.34 including VAT); this is a contract value, not a price list
K-MINE
- Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
- A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
- Licences are online, with offline access limited to 2 days
- Training is priced by custom quote and is not included in the published module rates
- Volume discounts are referenced but no discount rate or qualifying quantity is published
Pricing, plan by plan
Enablon EHS
On request- Enablon EHS$25000/year
- Health and safety management
- Incident reporting
- Compliance tracking
- Enablon Enterprise$60000/year
- Advanced features
- Multi-site management
- Custom workflows
K-MINE
On request- K-MINE Professional$9000/year
- Mine planning
- 3D design
- Scheduling
Which should you pick?
Choose Enablon EHS if
- You need incident management.
- You work on Web, Windows, Ios, Android.
- You also want health and safety compliance.
Questions people ask
- Is Enablon EHS or K-MINE better?
- Neither clearly leads. Enablon EHS starts at On request and K-MINE at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Enablon EHS or K-MINE?
- Enablon EHS starts at On request and K-MINE at On request.
- Does Enablon EHS or K-MINE run on more platforms?
- Enablon EHS runs on Web, Windows, Ios, Android. K-MINE runs on Windows.
- What is Enablon EHS best used for?
- Enablon EHS is most often used for health and safety management, incident reporting, risk assessment, compliance tracking. Of those, health and safety management and incident reporting are not what K-MINE is typically brought in for.
- What can Enablon EHS do that K-MINE cannot?
- Enablon EHS covers Incident management, Health and safety compliance, Environmental management, Risk assessment. K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. Both handle Windows support.
Related pages
More on Enablon EHS
Other head to heads
- Enablon EHS vs Caterpillar MineStar
- Enablon EHS vs Leapfrog Geo
- Enablon EHS vs Deswik Suite
- Enablon EHS vs Dassault Systemes GEOVIA
- Enablon EHS vs Datamine
- Enablon EHS vs Hexagon PPM Mining
- Enablon EHS vs Micromine
- Enablon EHS vs Datamine Studio RM
- Enablon EHS vs Maptek I-Site
- Enablon EHS vs Minemax
- Enablon EHS vs Promine
- Enablon EHS vs Surpac
- Enablon EHS vs Trimble Mining
- Enablon EHS vs Vulcan
- Enablon EHS vs 3DEC
- Enablon EHS vs acQuire GIM Suite
- Enablon EHS vs Carlson Mining
- Enablon EHS vs Cority EHS
- K-MINE vs Caterpillar MineStar
- K-MINE vs Leapfrog Geo
- K-MINE vs Deswik Suite
- K-MINE vs Dassault Systemes GEOVIA
- K-MINE vs Datamine
- K-MINE vs Hexagon PPM Mining
- K-MINE vs Micromine
- K-MINE vs Datamine Studio RM
- K-MINE vs Maptek I-Site
- K-MINE vs Minemax
- K-MINE vs Promine
- K-MINE vs Surpac
- K-MINE vs Trimble Mining
- K-MINE vs Vulcan
- K-MINE vs 3DEC
- K-MINE vs acQuire GIM Suite
- K-MINE vs Carlson Mining
- K-MINE vs Cority EHS
