Mining · head to head
CorePlan vs K-MINE

CorePlan
Mining
Drilling programme management for mineral exploration teams and drilling contractors
- From
- $1350/month
- Rated
- -
The short version
- Each has a real cost: CorePlan pricing is usage based on plods or shifts and billed annually with overage calculated monthly, so an intense drilling quarter generates an unbudgeted overage invoice, and finance teams that need a fixed annual number will struggle to get one.; K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- They diverge on capability: CorePlan covers Digital plods, K-MINE covers Mine planning.
- Prices and features above were last checked on 31 August 2026.
Where they differ
Only the attributes on which CorePlan and K-MINE actually diverge.
Identical on both: free tier (No), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in CorePlan
- Digital plods
- Rig scheduling
- Contractor reconciliation
- Sample and core tracking
- Field Operations module
- Advanced Analytics
- Forms subscription
- Interoperability service
Only in K-MINE
- Mine planning
- 3D design
- Production scheduling
- Economic evaluation
- Risk analysis
- Vulcan
- Surpac
- Datamine
What people use each for
The jobs each tool is most often brought in to do.
CorePlan
- A junior explorer running a two rig programme that wants cost per metre visible weekly instead of when the contractor invoice arrivesnot K-MINE
- A drilling contractor with crews across several client sites submitting plods digitally to cut invoice disputesnot K-MINE
- An exploration manager reconciling contractor billing against recorded shift hours before approving paymentnot K-MINE
- A multi project mid tier miner consolidating hole planning and sample dispatch across sites that currently each run their own spreadsheetnot K-MINE
K-MINE
- Open pit surveying, pit design, scheduling and pit optimisationnot CorePlan
- Underground mine design, stope optimisation and ventilation analysisnot CorePlan
- Geological modelling and grade estimation from drillhole datanot CorePlan
- Drill and blast design and slope stability analysisnot CorePlan
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
CorePlan
- Pricing is usage based on plods or shifts and billed annually with overage calculated monthly, so an intense drilling quarter generates an unbudgeted overage invoice, and finance teams that need a fixed annual number will struggle to get one.
- Only the Starter tier price is published; Professional, Enterprise and Corporate are all quote only, so comparing CorePlan against a competitor requires entering a sales process before you know the number.
- Core modules are unbundled: field operations, advanced analytics and custom forms are separately priced add-ons that each start in the hundreds of dollars per month, so the realistic monthly cost is well above the advertised entry price.
- It is a drilling operations system, not a geological database or modelling package, so it must sit alongside acQuire, Datashed or equivalent and the integration between them is a project rather than a switch.
- The customer base and support depth are concentrated in Australia and the company is small and venture funded, which means teams in the Americas or Africa get thinner local implementation support and carry the usual supplier concentration risk on a system that sits in the middle of drilling spend.
K-MINE
- Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
- A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
- Licences are online, with offline access limited to 2 days
- Training is priced by custom quote and is not included in the published module rates
- Volume discounts are referenced but no discount rate or qualifying quantity is published
Pricing, plan by plan
CorePlan
$1350/month- Starter$1350/month
- One project
- Up to two rigs
- Digital plods and rig scheduling
- Professional$undefined/month
- Multi-project management for mid-tier explorers
- Higher rig and shift allowances
- Priced on quotation
- Enterprise$undefined/month
- Large-scale operations
- Complex data integration
- Priced on quotation
- Field Operations add-on$800/month
- Pre-starts and inspections
- Field compliance forms
- From this price
K-MINE
On request- K-MINE Professional$9000/year
- Mine planning
- 3D design
- Scheduling
Which should you pick?
Choose CorePlan if
- You need digital plods.
- You work on Web, iOS, Android.
- You also want rig scheduling.
Questions people ask
- Is CorePlan or K-MINE better?
- Neither clearly leads. CorePlan starts at $1350/month and K-MINE at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, CorePlan or K-MINE?
- CorePlan starts at $1350/month and K-MINE at On request.
- Does CorePlan or K-MINE run on more platforms?
- CorePlan runs on Web, iOS, Android. K-MINE runs on Windows.
- What is CorePlan best used for?
- CorePlan is most often used for a junior explorer running a two rig programme that wants cost per metre visible weekly instead of when the contractor invoice arrives, a drilling contractor with crews across several client sites submitting plods digitally to cut invoice disputes, an exploration manager reconciling contractor billing against recorded shift hours before approving payment, a multi project mid tier miner consolidating hole planning and sample dispatch across sites that currently each run their own spreadsheet. Of those, a junior explorer running a two rig programme that wants cost per metre visible weekly instead of when the contractor invoice arrives and a drilling contractor with crews across several client sites submitting plods digitally to cut invoice disputes are not what K-MINE is typically brought in for.
- What can CorePlan do that K-MINE cannot?
- CorePlan covers Digital plods, Rig scheduling, Contractor reconciliation, Sample and core tracking. K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation.
Answered from the vendors’ own pages
CorePlan: Is CorePlan a geological database?
No. It manages drilling operations, plods, scheduling and sample dispatch. Geological data still lives in acQuire, Datashed or similar.
K-MINE: How much does K-MINE cost?
K-MINE does not publish pricing publicly. Customers must visit the dedicated pricing page, request a demo, or contact the sales team via phone or scheduling link to obtain quote information.
SourceCorePlan: Can drilling contractors use it too?
Yes, and that is the point. Contractors submit plods on the same platform their client uses, which removes the invoice reconciliation argument.
K-MINE: What pricing options does K-MINE offer?
K-MINE offers software licenses, consulting services, training, and support options. Exact pricing is determined through custom quotes based on requirements.
SourceCorePlan: What does it actually cost?
Starter is 1,350 US dollars a month for one project and two rigs, billed annually. Everything above that is quoted, and the analytics and field modules add several hundred dollars a month each.
CorePlan: Does it work without mobile signal?
Yes, field capture works offline and syncs when the rig comes back into coverage.
Related pages
Other head to heads
- CorePlan vs Micromine
- CorePlan vs Imago
- CorePlan vs Deswik Suite
- CorePlan vs Wenco
- CorePlan vs Leapfrog Geo
- CorePlan vs Surpac
- CorePlan vs Geoscience ANALYST
- CorePlan vs Dassault Systemes GEOVIA
- CorePlan vs Promine
- CorePlan vs acQuire GIM Suite
- CorePlan vs Caterpillar MineStar
- CorePlan vs Minemax
- CorePlan vs OptiMine
- CorePlan vs Vulcan
- CorePlan vs 3DEC
- CorePlan vs Seequent Central
- CorePlan vs MineSight
- CorePlan vs RPMGlobal TALPAC
- CorePlan vs Datamine
- CorePlan vs PCBC
- CorePlan vs Carlson Mining
- CorePlan vs UDEC
- CorePlan vs Vulcan Geological Modelling
- CorePlan vs Minemax Planner
- CorePlan vs Whittle
- K-MINE vs Micromine
- K-MINE vs Imago
- K-MINE vs Deswik Suite
- K-MINE vs Wenco
- K-MINE vs Leapfrog Geo
- K-MINE vs Surpac
- K-MINE vs Geoscience ANALYST
- K-MINE vs Dassault Systemes GEOVIA
- K-MINE vs Promine
- K-MINE vs acQuire GIM Suite
- K-MINE vs Caterpillar MineStar
- K-MINE vs Minemax
- K-MINE vs OptiMine
- K-MINE vs Vulcan
- K-MINE vs 3DEC
- K-MINE vs Seequent Central
- K-MINE vs MineSight
- K-MINE vs RPMGlobal TALPAC
- K-MINE vs Datamine
- K-MINE vs PCBC
- K-MINE vs Carlson Mining
- K-MINE vs UDEC
- K-MINE vs Vulcan Geological Modelling
- K-MINE vs Minemax Planner
- K-MINE vs Whittle

