Softwr

Software · head to head

K-MINE vs Vulcan

K-MINE logo

K-MINE

Software

Mine planning and optimization software

From
On request
Rated
-
Vulcan logo

Vulcan

Software

Industry-standard 3D mine planning and modeling software

From
On request
Rated
-

The short version

  • Each has a real cost: K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design; Vulcan neither the Vulcan product page nor the Maptek store page shows a price, a licence term or a subscription length
  • They diverge on capability: K-MINE covers Mine planning, Vulcan covers Geological modeling.

Where they differ

Only the attributes on which K-MINE and Vulcan actually diverge.

Attributes where K-MINE and Vulcan differ
AttributeK-MINEVulcan
Founded20011981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in K-MINE

  • Mine planning
  • 3D design
  • Economic evaluation
  • Risk analysis
  • Vulcan
  • Datamine
  • AutoCAD

Only in Vulcan

  • Geological modeling
  • Block modeling
  • Mine design
  • Resource estimation
  • Leapfrog
  • I-Site
  • SAP
  • MineSched

Both cover

  • Production scheduling
  • Surpac
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

K-MINE

  • Open pit surveying, pit design, scheduling and pit optimisationnot Vulcan
  • Underground mine design, stope optimisation and ventilation analysisnot Vulcan
  • Geological modelling and grade estimation from drillhole datanot Vulcan
  • Drill and blast design and slope stability analysisnot Vulcan

Vulcan

  • Geological modelling, block modelling and resource estimationnot K-MINE
  • Open pit and underground mine design and schedulingnot K-MINE
  • Grade control and geotechnical analysis at operating minesnot K-MINE

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

K-MINE

  • Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
  • Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
  • A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
  • Licences are online, with offline access limited to 2 days
  • Training is priced by custom quote and is not included in the published module rates
  • Volume discounts are referenced but no discount rate or qualifying quantity is published

Vulcan

  • Neither the Vulcan product page nor the Maptek store page shows a price, a licence term or a subscription length
  • Vulcan is a base product extended by nine paid add on modules covering geology and estimation, open pit design, underground design, scheduling, grade control and geotechnics, so the entry licence does not cover a full workflow
  • Buying requires going through the Maptek store or contacting Maptek directly for a quote

Pricing, plan by plan

K-MINE

On request
  • K-MINE Professional$9000/year
    • Mine planning
    • 3D design
    • Scheduling

Vulcan

On request
  • Vulcan Standard$8000/year
    • 3D modeling
    • Mine design
    • Block modeling
  • Vulcan Professional$15000/year
    • Advanced geostatistics
    • Resource estimation
    • Pit optimization
  • Vulcan Enterprise$25000/year
    • All modules
    • Custom solutions
    • Priority support

Which should you pick?

Choose K-MINE if

  • You need mine planning.
  • You work on Windows.
  • You also want 3d design.

Choose Vulcan if

  • You need geological modeling.
  • You work on Windows.
  • You also want block modeling.

Questions people ask

Is K-MINE or Vulcan better?
Neither clearly leads. K-MINE starts at On request and Vulcan at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, K-MINE or Vulcan?
K-MINE starts at On request and Vulcan at On request.
Does K-MINE or Vulcan run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is K-MINE best used for?
K-MINE is most often used for open pit surveying, pit design, scheduling and pit optimisation, underground mine design, stope optimisation and ventilation analysis, geological modelling and grade estimation from drillhole data, drill and blast design and slope stability analysis. Of those, open pit surveying, pit design, scheduling and pit optimisation and underground mine design, stope optimisation and ventilation analysis are not what Vulcan is typically brought in for.
What can K-MINE do that Vulcan cannot?
K-MINE covers Mine planning, 3D design, Economic evaluation, Risk analysis. Vulcan covers Geological modeling, Block modeling, Mine design, Resource estimation. Both handle Production scheduling, Surpac, Windows support.

Related pages

Other head to heads