Softwr

Mining · head to head

MinePlan vs Whittle

M

MinePlan

Mining

Life of mine planning and scheduling

From
On request
Rated
-
Whittle logo

Whittle

Mining

Strategic open pit mine optimization software

From
On request
Rated
-

The short version

  • Each has a real cost: MinePlan the Internet Archive's capture of mineplan.com.au on 4 March 2020 already showed only a generic 'Website Coming Soon' hosting placeholder rather than a product page, indicating the domain has not hosted a live MinePlan site for at least several years.; Whittle the Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.
  • They diverge on capability: MinePlan covers Life of mine planning, Whittle covers Pit optimization.
  • Prices and features above were last checked on 30 August 2026.

Where they differ

Only the attributes on which MinePlan and Whittle actually diverge.

Attributes where MinePlan and Whittle differ
AttributeMinePlanWhittle
Founded20081981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in MinePlan

  • Life of mine planning
  • Long-term scheduling
  • Scenario analysis
  • Feasibility assessment
  • Whittle
  • Excel

Only in Whittle

  • Pit optimization
  • NPV maximization
  • Cutoff grade analysis
  • Pushback design
  • MineSched
  • PCBC
  • Datamine

Both cover

  • Economic modeling
  • Vulcan
  • Surpac
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

MinePlan

  • Life of mine planningnot Whittle
  • Long-term schedulingnot Whittle
  • Feasibility studies
  • Economic analysis
  • Strategic planning

Whittle

  • Pit optimizationnot MinePlan
  • Strategic planning
  • Feasibility studies
  • Economic analysis
  • Scenario comparisonnot MinePlan

Both are used for feasibility studies, economic analysis, strategic planning, on those jobs the choice comes down to price and fit rather than capability.

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

MinePlan

  • The Internet Archive's capture of mineplan.com.au on 4 March 2020 already showed only a generic 'Website Coming Soon' hosting placeholder rather than a product page, indicating the domain has not hosted a live MinePlan site for at least several years.

Whittle

  • The Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.

Pricing, plan by plan

MinePlan

On request
  • MinePlan Standard$16000/year
    • Life of mine planning
    • Long-term scheduling
    • Economic analysis

Whittle

On request
  • Whittle Standard$15000/year
    • Pit optimization
    • Economic analysis
    • Multiple scenarios
  • Whittle Enterprise$25000/year
    • Advanced optimization
    • Scheduling integration
    • NPV maximization

Which should you pick?

Choose MinePlan if

  • You need life of mine planning.
  • You work on Windows.
  • You also want long-term scheduling.

Choose Whittle if

  • You need pit optimization.
  • You work on Windows.
  • You also want npv maximization.

Questions people ask

Is MinePlan or Whittle better?
Neither clearly leads. MinePlan starts at On request and Whittle at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, MinePlan or Whittle?
MinePlan starts at On request and Whittle at On request.
Does MinePlan or Whittle run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is MinePlan best used for?
MinePlan is most often used for life of mine planning, long-term scheduling, feasibility studies, economic analysis. Of those, life of mine planning and long-term scheduling are not what Whittle is typically brought in for.
What can MinePlan do that Whittle cannot?
MinePlan covers Life of mine planning, Long-term scheduling, Scenario analysis, Feasibility assessment. Whittle covers Pit optimization, NPV maximization, Cutoff grade analysis, Pushback design. Both handle Economic modeling, Vulcan, Surpac, Windows support.

Answered from the vendors’ own pages

Whittle: Where can I find pricing for GEOVIA Whittle?

Whittle is an advanced strategic mine planning product. Pricing information is not available on the public product page and requires contacting Dassault Systèmes directly through their contact form.

Source
Share

Related pages

Other head to heads