Mining · head to head
Datamine vs Whittle
Datamine
Mining
Integrated mining software for resource estimation and planning
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Datamine datamine publishes no price, no licence term and no named cost driver; the planning pages route buyers to a consultation or a sales contact form; Whittle the Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.
- They diverge on capability: Datamine covers Resource estimation, Whittle covers Pit optimization.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which Datamine and Whittle actually diverge.
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Datamine
- Resource estimation
- Geostatistical analysis
- Geological modeling
- Block modeling
- Grade control
- MineSight
- Leapfrog
- SAP
Only in Whittle
- Pit optimization
- NPV maximization
- Cutoff grade analysis
- Pushback design
- Economic modeling
- MineSched
- PCBC
- Datamine
Both cover
- Vulcan
- Surpac
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Datamine
- Geological modelling and resource estimation for mining projectsnot Whittle
- Open pit and underground mine design and schedulingnot Whittle
- Drill and blast design, survey and production reconciliationnot Whittle
Whittle
- Pit optimizationnot Datamine
- Strategic planningnot Datamine
- Feasibility studiesnot Datamine
- Economic analysisnot Datamine
- Scenario comparisonnot Datamine
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Datamine
- Datamine publishes no price, no licence term and no named cost driver; the planning pages route buyers to a consultation or a sales contact form
- The portfolio is split into many separate products across strategy, design, scheduling, blasting, survey and production, so a complete workflow requires assembling several licences
- Products acquired from other vendors, including Minemax Scheduler and Minemax Tempo, are now sold inside Datamine bundles rather than standalone
Whittle
- The Internet Archive's capture of Dassault Systemes' GEOVIA Whittle page on 20 January 2021 named it as one of seven distinct GEOVIA mining products (alongside Surpac, GEMS, Minex, MineSched, PCBC, InSite), sold via a 'How to buy' contact process with no price figure published.
Pricing, plan by plan
Datamine
On request- Datamine Studio$14000/year
- Resource estimation
- Geostatistics
- Geological modeling
- Datamine Advanced$24000/year
- Advanced optimization
- Strategic planning
- Risk analysis
Whittle
On request- Whittle Standard$15000/year
- Pit optimization
- Economic analysis
- Multiple scenarios
- Whittle Enterprise$25000/year
- Advanced optimization
- Scheduling integration
- NPV maximization
Which should you pick?
Choose Datamine if
- You need resource estimation.
- You work on Windows.
- You also want geostatistical analysis.
Choose Whittle if
- You need pit optimization.
- You work on Windows.
- You also want npv maximization.
Questions people ask
- Is Datamine or Whittle better?
- Neither clearly leads. Datamine starts at On request and Whittle at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Datamine or Whittle?
- Datamine starts at On request and Whittle at On request.
- Does Datamine or Whittle run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Datamine best used for?
- Datamine is most often used for geological modelling and resource estimation for mining projects, open pit and underground mine design and scheduling, drill and blast design, survey and production reconciliation. Of those, geological modelling and resource estimation for mining projects and open pit and underground mine design and scheduling are not what Whittle is typically brought in for.
- What can Datamine do that Whittle cannot?
- Datamine covers Resource estimation, Geostatistical analysis, Geological modeling, Block modeling. Whittle covers Pit optimization, NPV maximization, Cutoff grade analysis, Pushback design. Both handle Vulcan, Surpac, Windows support.
Answered from the vendors’ own pages
Whittle: Where can I find pricing for GEOVIA Whittle?
Whittle is an advanced strategic mine planning product. Pricing information is not available on the public product page and requires contacting Dassault Systèmes directly through their contact form.
SourceRelated pages
Other head to heads
- Datamine vs Vulcan Geological Modelling
- Datamine vs Deswik Suite
- Datamine vs Dassault Systemes GEOVIA
- Datamine vs Caterpillar MineStar
- Datamine vs Leapfrog Geo
- Datamine vs Hexagon PPM Mining
- Datamine vs Vulcan
- Datamine vs Minemax
- Datamine vs Fusion Mining
- Datamine vs Micromine
- Datamine vs Surpac
- Datamine vs K-MINE
- Datamine vs MineSight
- Datamine vs Minviro
- Datamine vs PLAXIS
- Datamine vs RPMGlobal TALPAC
- Datamine vs PCBC
- Datamine vs RPMGlobal XPAC
- Datamine vs Minemax Planner
- Datamine vs Carlson Mining
- Datamine vs MinePlan
- Datamine vs OptiMine
- Datamine vs 3DEC
- Datamine vs acQuire GIM Suite
- Datamine vs CorePlan
- Datamine vs Cority EHS
- Datamine vs Enablon EHS
- Datamine vs Envirosuite
- Whittle vs Vulcan Geological Modelling
- Whittle vs Deswik Suite
- Whittle vs Dassault Systemes GEOVIA
- Whittle vs Caterpillar MineStar
- Whittle vs Leapfrog Geo
- Whittle vs Hexagon PPM Mining
- Whittle vs Vulcan
- Whittle vs Minemax
- Whittle vs Fusion Mining
- Whittle vs Micromine
- Whittle vs Surpac
- Whittle vs K-MINE
- Whittle vs MineSight
- Whittle vs Minviro
- Whittle vs PLAXIS
- Whittle vs RPMGlobal TALPAC
- Whittle vs PCBC
- Whittle vs RPMGlobal XPAC
- Whittle vs Minemax Planner
- Whittle vs Carlson Mining
- Whittle vs MinePlan
- Whittle vs OptiMine
- Whittle vs 3DEC
- Whittle vs acQuire GIM Suite
- Whittle vs CorePlan
- Whittle vs Cority EHS
- Whittle vs Enablon EHS
- Whittle vs Envirosuite

