Mining · head to head
K-MINE vs UDEC
UDEC
Mining
Universal distinct element code for mining analysis
- From
- On request
- Rated
- -
The short version
- Each has a real cost: K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design; UDEC the UDEC product page publishes no price and directs buyers to a quote request or an external software store
- They diverge on capability: K-MINE covers Mine planning, UDEC covers Distinct element modeling.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which K-MINE and UDEC actually diverge.
Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in K-MINE
- Mine planning
- 3D design
- Production scheduling
- Economic evaluation
- Risk analysis
- Vulcan
- Surpac
- Datamine
Only in UDEC
- Distinct element modeling
- Joint network modeling
- Block interaction analysis
- Support interaction
- Dynamic analysis
- FLAC3D
- 3DEC
- Leapfrog
Both cover
- AutoCAD
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
K-MINE
- Open pit surveying, pit design, scheduling and pit optimisationnot UDEC
- Underground mine design, stope optimisation and ventilation analysisnot UDEC
- Geological modelling and grade estimation from drillhole datanot UDEC
- Drill and blast design and slope stability analysisnot UDEC
UDEC
- Geotechnical engineering simulationsnot K-MINE
- Discrete element modeling and analysisnot K-MINE
- Mining and tunneling software analysisnot K-MINE
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
K-MINE
- Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
- A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
- Licences are online, with offline access limited to 2 days
- Training is priced by custom quote and is not included in the published module rates
- Volume discounts are referenced but no discount rate or qualifying quantity is published
UDEC
- The UDEC product page publishes no price and directs buyers to a quote request or an external software store
- Fluid Flow, Barton-Bandis joint analysis, Creep, Thermal and User Defined Models are optional add ons charged on top of the base licence
- Writing custom constitutive models requires the separately licensed UDM option and C++ programming
- Purchases through the Buy Now route are prepaid annual subscriptions rather than a permanent licence
Pricing, plan by plan
K-MINE
On request- K-MINE Professional$9000/year
- Mine planning
- 3D design
- Scheduling
UDEC
On request- UDEC Professional$19000/year
- Distinct element analysis
- Joint modeling
- Block interaction
Which should you pick?
Choose UDEC if
- You need distinct element modeling.
- You work on Windows, Linux.
- You also want joint network modeling.
Questions people ask
- Is K-MINE or UDEC better?
- Neither clearly leads. K-MINE starts at On request and UDEC at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, K-MINE or UDEC?
- K-MINE starts at On request and UDEC at On request.
- Does K-MINE or UDEC run on more platforms?
- K-MINE runs on Windows. UDEC runs on Windows, Linux.
- What is K-MINE best used for?
- K-MINE is most often used for open pit surveying, pit design, scheduling and pit optimisation, underground mine design, stope optimisation and ventilation analysis, geological modelling and grade estimation from drillhole data, drill and blast design and slope stability analysis. Of those, open pit surveying, pit design, scheduling and pit optimisation and underground mine design, stope optimisation and ventilation analysis are not what UDEC is typically brought in for.
- What can K-MINE do that UDEC cannot?
- K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. UDEC covers Distinct element modeling, Joint network modeling, Block interaction analysis, Support interaction. Both handle AutoCAD, Windows support.
Answered from the vendors’ own pages
K-MINE: How much does K-MINE cost?
K-MINE does not publish pricing publicly. Customers must visit the dedicated pricing page, request a demo, or contact the sales team via phone or scheduling link to obtain quote information.
SourceUDEC: How much does UDEC cost?
UDEC pricing is not published on the product page. The vendor directs inquiries through an 'Ask an Expert' contact option at [email protected] or a 'Request a Quote' option through the itascasoftware.com store.
SourceK-MINE: What pricing options does K-MINE offer?
K-MINE offers software licenses, consulting services, training, and support options. Exact pricing is determined through custom quotes based on requirements.
SourceUDEC: What is UDEC's pricing model?
UDEC is available through a subscription model rather than one-time licensing. Prepaid annual subscriptions are available through the software store, and pricing is customized based on quote requests.
SourceRelated pages
Other head to heads
- K-MINE vs Deswik Suite
- K-MINE vs Dassault Systemes GEOVIA
- K-MINE vs Caterpillar MineStar
- K-MINE vs Leapfrog Geo
- K-MINE vs MineSight
- K-MINE vs RPMGlobal TALPAC
- K-MINE vs Datamine
- K-MINE vs Minemax
- K-MINE vs Vulcan
- K-MINE vs PCBC
- K-MINE vs Carlson Mining
- K-MINE vs Vulcan Geological Modelling
- K-MINE vs Wenco
- K-MINE vs OptiMine
- K-MINE vs Minemax Planner
- K-MINE vs Whittle
- K-MINE vs GeoStudio
- K-MINE vs PLAXIS
- K-MINE vs Geoscience ANALYST
- K-MINE vs GEOVIA GEMS
- K-MINE vs IHS Markit Petra
- K-MINE vs Snowden Supervisor
- K-MINE vs Seequent Central
- K-MINE vs RS2
- UDEC vs Deswik Suite
- UDEC vs Dassault Systemes GEOVIA
- UDEC vs Caterpillar MineStar
- UDEC vs Leapfrog Geo
- UDEC vs MineSight
- UDEC vs RPMGlobal TALPAC
- UDEC vs Datamine
- UDEC vs Minemax
- UDEC vs Vulcan
- UDEC vs PCBC
- UDEC vs Carlson Mining
- UDEC vs Vulcan Geological Modelling
- UDEC vs Wenco
- UDEC vs OptiMine
- UDEC vs Minemax Planner
- UDEC vs Whittle
- UDEC vs GeoStudio
- UDEC vs PLAXIS
- UDEC vs Geoscience ANALYST
- UDEC vs GEOVIA GEMS
- UDEC vs IHS Markit Petra
- UDEC vs Snowden Supervisor
- UDEC vs Seequent Central
- UDEC vs RS2

