Mining · head to head
Imago vs K-MINE
The short version
- Each has a real cost: Imago no pricing amounts published on vendor website; specific tier costs must be obtained by contacting sales; K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- They diverge on capability: Imago covers Geological database, K-MINE covers Mine planning.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which Imago and K-MINE actually diverge.
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Imago
- Geological database
- Drill hole management
- Sample tracking
- Data validation
- Reporting tools
- Leapfrog
- Excel
- GIS systems
Only in K-MINE
- Mine planning
- 3D design
- Production scheduling
- Economic evaluation
- Risk analysis
- Surpac
- Datamine
- AutoCAD
Both cover
- Vulcan
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Imago
- Digitising and managing drill core photographynot K-MINE
- Linking core imagery to geological logging datanot K-MINE
- Streaming high-resolution core imagery into Leapfrog modelsnot K-MINE
- Sharing geoscientific imagery across a distributed exploration teamnot K-MINE
- Capturing core images in the field with the mobile appnot K-MINE
K-MINE
- Open pit surveying, pit design, scheduling and pit optimisationnot Imago
- Underground mine design, stope optimisation and ventilation analysisnot Imago
- Geological modelling and grade estimation from drillhole datanot Imago
- Drill and blast design and slope stability analysisnot Imago
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Imago
- No pricing amounts published on vendor website; specific tier costs must be obtained by contacting sales
- Tiers are designed for mining operations (each mine site requires separate subscription)
K-MINE
- Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
- Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
- A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
- Licences are online, with offline access limited to 2 days
- Training is priced by custom quote and is not included in the published module rates
- Volume discounts are referenced but no discount rate or qualifying quantity is published
Pricing, plan by plan
Imago
On request- Imago Professional$6500/year
- Database management
- Drill hole tracking
- Sample management
K-MINE
On request- K-MINE Professional$9000/year
- Mine planning
- 3D design
- Scheduling
Which should you pick?
Choose Imago if
- You need geological database.
- You work on Windows.
- You also want drill hole management.
Questions people ask
- Is Imago or K-MINE better?
- Neither clearly leads. Imago starts at On request and K-MINE at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Imago or K-MINE?
- Imago starts at On request and K-MINE at On request.
- Does Imago or K-MINE run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Imago best used for?
- Imago is most often used for digitising and managing drill core photography, linking core imagery to geological logging data, streaming high-resolution core imagery into leapfrog models, sharing geoscientific imagery across a distributed exploration team. Of those, digitising and managing drill core photography and linking core imagery to geological logging data are not what K-MINE is typically brought in for.
- What can Imago do that K-MINE cannot?
- Imago covers Geological database, Drill hole management, Sample tracking, Data validation. K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. Both handle Vulcan, Windows support.
Answered from the vendors’ own pages
Imago: What are the Imago subscription tiers?
Imago offers three subscription tiers: Standard (single workspace, unlimited users, 3TB storage), Enterprise (multiple workspaces, unlimited users, 6TB shared storage, SSO and user group management), and Junior (single workspace, unlimited users, 500GB storage, for non-producing companies or academic licensing only). All tiers are contracted on 12-month agreements.
SourceK-MINE: How much does K-MINE cost?
K-MINE does not publish pricing publicly. Customers must visit the dedicated pricing page, request a demo, or contact the sales team via phone or scheduling link to obtain quote information.
SourceImago: What add-on options are available for Imago?
Imago offers add-on subscriptions including Chip Shot (RC chip tray capture control), Mobile Capture X (smartphone field capture workflows), and Storage (additional capacity in 1TB increments). Each additional mine site requires a separate Imago subscription.
SourceK-MINE: What pricing options does K-MINE offer?
K-MINE offers software licenses, consulting services, training, and support options. Exact pricing is determined through custom quotes based on requirements.
SourceRelated pages
Other head to heads
- Imago vs Dassault Systemes GEOVIA
- Imago vs CorePlan
- Imago vs Caterpillar MineStar
- Imago vs Deswik Suite
- Imago vs Leapfrog Geo
- Imago vs Infomine Mining Intelligence
- Imago vs Maxwell Datacloud
- Imago vs acQuire GIM Suite
- Imago vs Cority EHS
- Imago vs MinePlan
- Imago vs Micromine
- Imago vs Enablon EHS
- Imago vs MineRP
- Imago vs MineSched
- Imago vs MineSight
- Imago vs Minviro
- Imago vs PCBC
- Imago vs RPMGlobal TALPAC
- Imago vs Datamine
- Imago vs Minemax
- Imago vs Vulcan
- Imago vs Carlson Mining
- Imago vs UDEC
- Imago vs Vulcan Geological Modelling
- Imago vs Wenco
- Imago vs OptiMine
- Imago vs Minemax Planner
- Imago vs Whittle
- K-MINE vs Dassault Systemes GEOVIA
- K-MINE vs CorePlan
- K-MINE vs Caterpillar MineStar
- K-MINE vs Deswik Suite
- K-MINE vs Leapfrog Geo
- K-MINE vs Infomine Mining Intelligence
- K-MINE vs Maxwell Datacloud
- K-MINE vs acQuire GIM Suite
- K-MINE vs Cority EHS
- K-MINE vs MinePlan
- K-MINE vs Micromine
- K-MINE vs Enablon EHS
- K-MINE vs MineRP
- K-MINE vs MineSched
- K-MINE vs MineSight
- K-MINE vs Minviro
- K-MINE vs PCBC
- K-MINE vs RPMGlobal TALPAC
- K-MINE vs Datamine
- K-MINE vs Minemax
- K-MINE vs Vulcan
- K-MINE vs Carlson Mining
- K-MINE vs UDEC
- K-MINE vs Vulcan Geological Modelling
- K-MINE vs Wenco
- K-MINE vs OptiMine
- K-MINE vs Minemax Planner
- K-MINE vs Whittle


