Softwr

Mining · head to head

K-MINE vs MineSched

K-MINE logo

K-MINE

Mining

Mine planning and optimization software

From
On request
Rated
-
MineSched logo

MineSched

Mining

Production scheduling software for mining operations

From
On request
Rated
-

The short version

  • Each has a real cost: K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design; MineSched 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind
  • They diverge on capability: K-MINE covers Mine planning, MineSched covers Activity sequencing.
  • Prices and features above were last checked on 30 August 2026.

Where they differ

Only the attributes on which K-MINE and MineSched actually diverge.

Attributes where K-MINE and MineSched differ
AttributeK-MINEMineSched
Founded20011981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in K-MINE

  • Mine planning
  • 3D design
  • Economic evaluation
  • Risk analysis
  • Datamine
  • AutoCAD

Only in MineSched

  • Activity sequencing
  • Resource planning
  • Constraint handling
  • Scenario analysis
  • Whittle
  • PCBC
  • SAP

Both cover

  • Production scheduling
  • Vulcan
  • Surpac
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

K-MINE

  • Open pit surveying, pit design, scheduling and pit optimisationnot MineSched
  • Underground mine design, stope optimisation and ventilation analysisnot MineSched
  • Geological modelling and grade estimation from drillhole datanot MineSched
  • Drill and blast design and slope stability analysisnot MineSched

MineSched

  • Production planningnot K-MINE
  • Resource schedulingnot K-MINE
  • Equipment allocationnot K-MINE
  • Capacity planningnot K-MINE
  • Performance trackingnot K-MINE

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

K-MINE

  • Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
  • Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
  • A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
  • Licences are online, with offline access limited to 2 days
  • Training is priced by custom quote and is not included in the published module rates
  • Volume discounts are referenced but no discount rate or qualifying quantity is published

MineSched

  • 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind

Pricing, plan by plan

K-MINE

On request
  • K-MINE Professional$9000/year
    • Mine planning
    • 3D design
    • Scheduling

MineSched

On request
  • MineSched Standard$12000/year
    • Production scheduling
    • Gantt charts
    • Resource allocation
  • MineSched Advanced$20000/year
    • Multi-scenario planning
    • Optimization tools
    • Advanced constraints

Which should you pick?

Choose K-MINE if

  • You need mine planning.
  • You work on Windows.
  • You also want 3d design.

Choose MineSched if

  • You need activity sequencing.
  • You work on Windows.
  • You also want resource planning.

Questions people ask

Is K-MINE or MineSched better?
Neither clearly leads. K-MINE starts at On request and MineSched at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, K-MINE or MineSched?
K-MINE starts at On request and MineSched at On request.
Does K-MINE or MineSched run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is K-MINE best used for?
K-MINE is most often used for open pit surveying, pit design, scheduling and pit optimisation, underground mine design, stope optimisation and ventilation analysis, geological modelling and grade estimation from drillhole data, drill and blast design and slope stability analysis. Of those, open pit surveying, pit design, scheduling and pit optimisation and underground mine design, stope optimisation and ventilation analysis are not what MineSched is typically brought in for.
What can K-MINE do that MineSched cannot?
K-MINE covers Mine planning, 3D design, Economic evaluation, Risk analysis. MineSched covers Activity sequencing, Resource planning, Constraint handling, Scenario analysis. Both handle Production scheduling, Vulcan, Surpac, Windows support.

Answered from the vendors’ own pages

K-MINE: How much does K-MINE cost?

K-MINE does not publish pricing publicly. Customers must visit the dedicated pricing page, request a demo, or contact the sales team via phone or scheduling link to obtain quote information.

Source
MineSched: Does GEOVIA MineSched publish pricing online?

No pricing information is available on the product page. Interested customers must contact Dassault Systèmes directly through their contact form or sales team to request pricing details.

Source
K-MINE: What pricing options does K-MINE offer?

K-MINE offers software licenses, consulting services, training, and support options. Exact pricing is determined through custom quotes based on requirements.

Source
Share

Related pages

Other head to heads