Softwr

Mining & Resources · head to head

K-MINE vs Surpac

K-MINE logo

K-MINE

Mining & Resources

Mine planning and optimization software

From
On request
Rated
-
Surpac logo

Surpac

Mining & Resources

Geology and mine planning software for all mining methods

From
On request
Rated
-

The short version

  • Each has a real cost: K-MINE modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design; Surpac 3ds.com's Surpac page describes nine product modules in detail but every pricing action is a 'Speak with an expert' or 'Contact us' CTA, with no edition names or figures published
  • They diverge on capability: K-MINE covers Mine planning, Surpac covers Geological database.

Where they differ

Only the attributes on which K-MINE and Surpac actually diverge.

Attributes where K-MINE and Surpac differ
AttributeK-MINESurpac
Founded20011981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining & Resources).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in K-MINE

  • Mine planning
  • 3D design
  • Production scheduling
  • Economic evaluation
  • Risk analysis
  • Vulcan
  • Surpac
  • Datamine

Only in Surpac

  • Geological database
  • Block modeling
  • Mine design
  • Resource estimation
  • Workflow automation
  • MineSched
  • PCBC
  • Whittle

Both cover

  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

K-MINE

  • Open pit surveying, pit design, scheduling and pit optimisationnot Surpac
  • Underground mine design, stope optimisation and ventilation analysisnot Surpac
  • Geological modelling and grade estimation from drillhole datanot Surpac
  • Drill and blast design and slope stability analysisnot Surpac

Surpac

  • Geological modelingnot K-MINE
  • Mine planningnot K-MINE
  • Resource estimationnot K-MINE
  • Grade controlnot K-MINE
  • Production trackingnot K-MINE

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

K-MINE

  • Modules are licensed separately as annual subscriptions, from 2,700 USD a year for Infrastructure up to 9,480 USD a year for Open Pit Design
  • Geology is 9,060 USD a year, Pit Optimizer 8,580 USD, Scheduling 7,380 USD, Stope Optimization 6,960 USD and Surveying 6,600 USD, so a full workflow means stacking several module subscriptions
  • A licence is assigned either to a dedicated server or to a single computer workstation, with one active device at a time
  • Licences are online, with offline access limited to 2 days
  • Training is priced by custom quote and is not included in the published module rates
  • Volume discounts are referenced but no discount rate or qualifying quantity is published

Surpac

  • 3ds.com's Surpac page describes nine product modules in detail but every pricing action is a 'Speak with an expert' or 'Contact us' CTA, with no edition names or figures published

Pricing, plan by plan

K-MINE

On request
  • K-MINE Professional$9000/year
    • Mine planning
    • 3D design
    • Scheduling

Surpac

On request
  • Surpac Core$6000/year
    • 3D visualization
    • Geological database
    • Surface modeling
  • Surpac Advanced$12000/year
    • Block modeling
    • Resource estimation
    • Mine design
  • Surpac Complete$20000/year
    • All modules
    • Underground planning
    • Scheduling integration

Which should you pick?

Choose K-MINE if

  • You need mine planning.
  • You work on Windows.
  • You also want 3d design.

Choose Surpac if

  • You need geological database.
  • You work on Windows.
  • You also want block modeling.

Questions people ask

Is K-MINE or Surpac better?
Neither clearly leads. K-MINE starts at On request and Surpac at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, K-MINE or Surpac?
K-MINE starts at On request and Surpac at On request.
Does K-MINE or Surpac run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is K-MINE best used for?
K-MINE is most often used for open pit surveying, pit design, scheduling and pit optimisation, underground mine design, stope optimisation and ventilation analysis, geological modelling and grade estimation from drillhole data, drill and blast design and slope stability analysis. Of those, open pit surveying, pit design, scheduling and pit optimisation and underground mine design, stope optimisation and ventilation analysis are not what Surpac is typically brought in for.
What can K-MINE do that Surpac cannot?
K-MINE covers Mine planning, 3D design, Production scheduling, Economic evaluation. Surpac covers Geological database, Block modeling, Mine design, Resource estimation. Both handle Windows support.

Related pages

Other head to heads