The short version

  • Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; MineSched 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind
  • They diverge on capability: 3DEC covers 3D distinct element analysis, MineSched covers Production scheduling.

Where they differ

Only the attributes on which 3DEC and MineSched actually diverge.

Attributes where 3DEC and MineSched differ
Attribute3DECMineSched
PlatformsWindows, LinuxWindows

Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Mining & Resources), founded (1981).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in 3DEC

  • 3D distinct element analysis
  • Block motion tracking
  • Contact detection
  • Support design
  • Dynamic simulation
  • FLAC3D
  • Leapfrog
  • Python

Only in MineSched

  • Production scheduling
  • Activity sequencing
  • Resource planning
  • Constraint handling
  • Scenario analysis
  • Surpac
  • Whittle
  • PCBC

Both cover

  • Vulcan
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

3DEC

  • Three-dimensional analysis of jointed rock and discontinuous materialsnot MineSched
  • Slope stability and pillar analysis for miningnot MineSched
  • Blast and earthquake dynamic analysisnot MineSched
  • Groundwater flow through fractured rocknot MineSched
  • Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot MineSched

MineSched

  • Production planningnot 3DEC
  • Resource schedulingnot 3DEC
  • Equipment allocationnot 3DEC
  • Capacity planningnot 3DEC
  • Performance trackingnot 3DEC

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

3DEC

  • Pricing is not published; licences are quoted, with subscription and perpetual options
  • A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer

MineSched

  • 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind

Pricing, plan by plan

3DEC

On request
  • 3DEC Professional$25000/year
    • 3D distinct element analysis
    • Block-to-block interaction
    • Support installation modeling

MineSched

On request
  • MineSched Standard$12000/year
    • Production scheduling
    • Gantt charts
    • Resource allocation
  • MineSched Advanced$20000/year
    • Multi-scenario planning
    • Optimization tools
    • Advanced constraints

Which should you pick?

Choose 3DEC if

  • You need 3d distinct element analysis.
  • You work on Windows, Linux.
  • You also want block motion tracking.

Choose MineSched if

  • You need production scheduling.
  • You work on Windows.
  • You also want activity sequencing.

Questions people ask

Is 3DEC or MineSched better?
Neither clearly leads. 3DEC starts at On request and MineSched at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, 3DEC or MineSched?
3DEC starts at On request and MineSched at On request.
Does 3DEC or MineSched run on more platforms?
3DEC runs on Windows, Linux. MineSched runs on Windows.
What is 3DEC best used for?
3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what MineSched is typically brought in for.
What can 3DEC do that MineSched cannot?
3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. MineSched covers Production scheduling, Activity sequencing, Resource planning, Constraint handling. Both handle Vulcan, Windows support.

Related pages

Other head to heads