Softwr

Software · head to head

3DEC vs MineRP

3

3DEC

Software

3D distinct element code for underground mining

From
On request
Rated
-
MineRP logo

MineRP

Software

Resource planning and mine optimization

From
On request
Rated
-

The short version

  • Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; MineRP minerp.com 301 redirects to epiroc.com's mine planning product line, confirming MineRP was absorbed into Epiroc; the product is no longer sold as an independently branded platform and buyers must now evaluate it inside Epiroc's mining portfolio.
  • They diverge on capability: 3DEC covers 3D distinct element analysis, MineRP covers Resource planning.

Where they differ

Only the attributes on which 3DEC and MineRP actually diverge.

Attributes where 3DEC and MineRP differ
Attribute3DECMineRP
PlatformsWindows, LinuxWindows, Web
Founded19812003

Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in 3DEC

  • 3D distinct element analysis
  • Block motion tracking
  • Contact detection
  • Support design
  • Dynamic simulation
  • FLAC3D
  • Leapfrog
  • Python

Only in MineRP

  • Resource planning
  • Production scheduling
  • Equipment management
  • Constraint optimization
  • Performance tracking
  • Surpac
  • ERP systems
  • Excel

Both cover

  • Vulcan
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

3DEC

  • Three-dimensional analysis of jointed rock and discontinuous materialsnot MineRP
  • Slope stability and pillar analysis for miningnot MineRP
  • Blast and earthquake dynamic analysisnot MineRP
  • Groundwater flow through fractured rocknot MineRP
  • Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot MineRP

MineRP

  • Resource planningnot 3DEC
  • Production schedulingnot 3DEC
  • Equipment optimizationnot 3DEC
  • Capacity planningnot 3DEC
  • Operations managementnot 3DEC

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

3DEC

  • Pricing is not published; licences are quoted, with subscription and perpetual options
  • A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer

MineRP

  • minerp.com 301 redirects to epiroc.com's mine planning product line, confirming MineRP was absorbed into Epiroc; the product is no longer sold as an independently branded platform and buyers must now evaluate it inside Epiroc's mining portfolio.

Pricing, plan by plan

3DEC

On request
  • 3DEC Professional$25000/year
    • 3D distinct element analysis
    • Block-to-block interaction
    • Support installation modeling

MineRP

On request
  • MineRP Professional$19000/year
    • Resource planning
    • Production scheduling
    • Constraint management

Which should you pick?

Choose 3DEC if

  • You need 3d distinct element analysis.
  • You work on Windows, Linux.
  • You also want block motion tracking.

Choose MineRP if

  • You need resource planning.
  • You work on Windows, Web.
  • You also want production scheduling.

Questions people ask

Is 3DEC or MineRP better?
Neither clearly leads. 3DEC starts at On request and MineRP at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, 3DEC or MineRP?
3DEC starts at On request and MineRP at On request.
Does 3DEC or MineRP run on more platforms?
3DEC runs on Windows, Linux. MineRP runs on Windows, Web.
What is 3DEC best used for?
3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what MineRP is typically brought in for.
What can 3DEC do that MineRP cannot?
3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. MineRP covers Resource planning, Production scheduling, Equipment management, Constraint optimization. Both handle Vulcan, Windows support.

Related pages

Other head to heads