Mining & Resources · head to head
3DEC vs Minemax Planner
3
3DEC
Mining & Resources
3D distinct element code for underground mining
- From
- On request
- Rated
- -

Minemax Planner
Mining & Resources
Strategic mine planning and optimization software
- From
- On request
- Rated
- -
The short version
- Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; Minemax Planner minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- They diverge on capability: 3DEC covers 3D distinct element analysis, Minemax Planner covers Schedule optimization.
Where they differ
Only the attributes on which 3DEC and Minemax Planner actually diverge.
| Attribute | 3DEC | Minemax Planner |
|---|---|---|
| Platforms | Windows, Linux | Windows |
| Founded | 1981 | 1997 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Mining & Resources).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in 3DEC
- 3D distinct element analysis
- Block motion tracking
- Contact detection
- Support design
- Dynamic simulation
- FLAC3D
- Leapfrog
- Python
Only in Minemax Planner
- Schedule optimization
- NPV maximization
- Cutoff grade optimization
- Pushback scheduling
- Multi-scenario analysis
- Surpac
- Whittle
- Deswik
Both cover
- Vulcan
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
3DEC
- Three-dimensional analysis of jointed rock and discontinuous materialsnot Minemax Planner
- Slope stability and pillar analysis for miningnot Minemax Planner
- Blast and earthquake dynamic analysisnot Minemax Planner
- Groundwater flow through fractured rocknot Minemax Planner
- Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot Minemax Planner
Minemax Planner
- Mine production scheduling and plan trackingnot 3DEC
- Comparing life of mine scenarios against a base plannot 3DEC
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
3DEC
- Pricing is not published; licences are quoted, with subscription and perpetual options
- A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer
Minemax Planner
- minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- No pricing is published; licences require contacting the Datamine sales team
- Planning capability is sold in role based bundles rather than as a single named planner licence
Pricing, plan by plan
3DEC
On request- 3DEC Professional$25000/year
- 3D distinct element analysis
- Block-to-block interaction
- Support installation modeling
Minemax Planner
On request- Minemax Planner$20000/year
- Schedule optimization
- NPV maximization
- Cutoff grade analysis
- Minemax Enterprise$40000/year
- Multi-mine planning
- Advanced optimization
- Integration APIs
Which should you pick?
Choose 3DEC if
- You need 3d distinct element analysis.
- You work on Windows, Linux.
- You also want block motion tracking.
Choose Minemax Planner if
- You need schedule optimization.
- You work on Windows.
- You also want npv maximization.
Questions people ask
- Is 3DEC or Minemax Planner better?
- Neither clearly leads. 3DEC starts at On request and Minemax Planner at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, 3DEC or Minemax Planner?
- 3DEC starts at On request and Minemax Planner at On request.
- Does 3DEC or Minemax Planner run on more platforms?
- 3DEC runs on Windows, Linux. Minemax Planner runs on Windows.
- What is 3DEC best used for?
- 3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what Minemax Planner is typically brought in for.
- What can 3DEC do that Minemax Planner cannot?
- 3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. Minemax Planner covers Schedule optimization, NPV maximization, Cutoff grade optimization, Pushback scheduling. Both handle Vulcan, Windows support.
Related pages
More on Minemax Planner
Other head to heads
- 3DEC vs Caterpillar MineStar
- 3DEC vs Leapfrog Geo
- 3DEC vs Deswik Suite
- 3DEC vs Dassault Systemes GEOVIA
- 3DEC vs Datamine
- 3DEC vs Hexagon PPM Mining
- 3DEC vs Micromine
- 3DEC vs Datamine Studio RM
- 3DEC vs Maptek I-Site
- 3DEC vs Minemax
- 3DEC vs Promine
- 3DEC vs Surpac
- 3DEC vs Trimble Mining
- 3DEC vs Vulcan
- 3DEC vs acQuire GIM Suite
- 3DEC vs Carlson Mining
- 3DEC vs Cority EHS
- 3DEC vs Enablon EHS
- Minemax Planner vs Caterpillar MineStar
- Minemax Planner vs Leapfrog Geo
- Minemax Planner vs Deswik Suite
- Minemax Planner vs Dassault Systemes GEOVIA
- Minemax Planner vs Datamine
- Minemax Planner vs Hexagon PPM Mining
- Minemax Planner vs Micromine
- Minemax Planner vs Datamine Studio RM
- Minemax Planner vs Maptek I-Site
- Minemax Planner vs Minemax
- Minemax Planner vs Promine
- Minemax Planner vs Surpac
- Minemax Planner vs Trimble Mining
- Minemax Planner vs Vulcan
- Minemax Planner vs acQuire GIM Suite
- Minemax Planner vs Carlson Mining
- Minemax Planner vs Cority EHS
- Minemax Planner vs Enablon EHS
