Software · head to head
3DEC vs Hexagon PPM Mining

Hexagon PPM Mining
Software
Enterprise asset management for mining operations
- From
- On request
- Rated
- -
The short version
- Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; Hexagon PPM Mining pricing is custom and not publicly transparent, requiring direct negotiation with sales teams
- They diverge on capability: 3DEC covers 3D distinct element analysis, Hexagon PPM Mining covers Asset lifecycle management.
Where they differ
Only the attributes on which 3DEC and Hexagon PPM Mining actually diverge.
| Attribute | 3DEC | Hexagon PPM Mining |
|---|---|---|
| Platforms | Windows, Linux | Windows, Cloud |
| Founded | 1981 | 1975 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Unknown).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in 3DEC
- 3D distinct element analysis
- Block motion tracking
- Contact detection
- Support design
- Dynamic simulation
- FLAC3D
- Leapfrog
- Vulcan
Only in Hexagon PPM Mining
- Asset lifecycle management
- 3D plant visualization
- Document management
- Work order management
- Reliability analytics
- Mobile inspections
- SAP
- Oracle
Both cover
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
3DEC
- Three-dimensional analysis of jointed rock and discontinuous materialsnot Hexagon PPM Mining
- Slope stability and pillar analysis for miningnot Hexagon PPM Mining
- Blast and earthquake dynamic analysisnot Hexagon PPM Mining
- Groundwater flow through fractured rocknot Hexagon PPM Mining
- Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot Hexagon PPM Mining
Hexagon PPM Mining
- Asset lifecycle managementnot 3DEC
- Maintenance optimizationnot 3DEC
- Document controlnot 3DEC
- Work managementnot 3DEC
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
3DEC
- Pricing is not published; licences are quoted, with subscription and perpetual options
- A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer
Hexagon PPM Mining
- Pricing is custom and not publicly transparent, requiring direct negotiation with sales teams
- Block model management traditionally lacked version control and audit trails, though the new Block Model Manager addresses this
- Manual configuration of pit optimization scenarios is time-consuming and limits the ability to evaluate multiple scenarios quickly
- Implementation and adoption require significant training due to the breadth of modules and complex workflows
Pricing, plan by plan
3DEC
On request- 3DEC Professional$25000/year
- 3D distinct element analysis
- Block-to-block interaction
- Support installation modeling
Hexagon PPM Mining
On request- Hexagon PPM Standard$undefined/month
- Asset management
- Document control
- 3D visualization
- Hexagon PPM Enterprise$undefined/month
- All Standard
- Enterprise integration
- Advanced analytics
Which should you pick?
Choose 3DEC if
- You need 3d distinct element analysis.
- You work on Windows, Linux.
- You also want block motion tracking.
Choose Hexagon PPM Mining if
- You need asset lifecycle management.
- You work on Windows, Cloud.
- You also want 3d plant visualization.
Questions people ask
- Is 3DEC or Hexagon PPM Mining better?
- Neither clearly leads. 3DEC starts at On request and Hexagon PPM Mining at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, 3DEC or Hexagon PPM Mining?
- 3DEC starts at On request and Hexagon PPM Mining at On request.
- Does 3DEC or Hexagon PPM Mining run on more platforms?
- 3DEC runs on Windows, Linux. Hexagon PPM Mining runs on Windows, Cloud.
- What is 3DEC best used for?
- 3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what Hexagon PPM Mining is typically brought in for.
- What can 3DEC do that Hexagon PPM Mining cannot?
- 3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. Hexagon PPM Mining covers Asset lifecycle management, 3D plant visualization, Document management, Work order management. Both handle Windows support.
Answered from the vendors’ own pages
Hexagon PPM Mining: What does Hexagon MinePlan do?
Hexagon MinePlan is an integrated mine planning platform that handles 3D modeling, geological interpretation, block modeling, resource estimation, pit optimization, mine design, and scheduling for open pit and underground mines.
SourceHexagon PPM Mining: Does Hexagon MinePlan have APIs for integration?
Yes. The Block Model Manager includes APIs for custom analytics and seamless integration with other mining software like Datamine and Vulcan, eliminating manual import/export of block model data.
SourceHexagon PPM Mining: How much does Hexagon MinePlan cost?
Hexagon does not publicly list pricing. Costs are customized based on selected modules (geological modeling, pit optimization, scheduling, etc.), mine size and complexity, and support requirements. Licensing can be perpetual or subscription-based.
SourceHexagon PPM Mining: What platforms does Hexagon MinePlan run on?
Hexagon MinePlan runs on Windows operating systems and supports cloud deployment options through Hexagon's cloud infrastructure.
SourceHexagon PPM Mining: Does Hexagon MinePlan offer training and support?
Yes. Hexagon provides comprehensive training programs, documentation, and customer support services for MinePlan users, with training resources available through their support portal.
SourceRelated pages
More on Hexagon PPM Mining
Keep looking
Other head to heads
- 3DEC vs Caterpillar MineStar
- 3DEC vs Leapfrog Geo
- 3DEC vs Deswik Suite
- 3DEC vs Dassault Systemes GEOVIA
- 3DEC vs Datamine
- 3DEC vs Micromine
- 3DEC vs Datamine Studio RM
- 3DEC vs Maptek I-Site
- 3DEC vs Minemax
- 3DEC vs Promine
- 3DEC vs Surpac
- 3DEC vs Trimble Mining
- 3DEC vs Vulcan
- 3DEC vs acQuire GIM Suite
- 3DEC vs Carlson Mining
- 3DEC vs Cority EHS
- 3DEC vs Enablon EHS
- Hexagon PPM Mining vs Caterpillar MineStar
- Hexagon PPM Mining vs Leapfrog Geo
- Hexagon PPM Mining vs Deswik Suite
- Hexagon PPM Mining vs Dassault Systemes GEOVIA
- Hexagon PPM Mining vs Datamine
- Hexagon PPM Mining vs Micromine
- Hexagon PPM Mining vs Datamine Studio RM
- Hexagon PPM Mining vs Maptek I-Site
- Hexagon PPM Mining vs Minemax
- Hexagon PPM Mining vs Promine
- Hexagon PPM Mining vs Surpac
- Hexagon PPM Mining vs Trimble Mining
- Hexagon PPM Mining vs Vulcan
- Hexagon PPM Mining vs acQuire GIM Suite
- Hexagon PPM Mining vs Carlson Mining
- Hexagon PPM Mining vs Cority EHS
- Hexagon PPM Mining vs Enablon EHS
