Construction · head to head
CMiC vs Cubit Estimating

Cubit Estimating
Construction
Australian estimating and on-screen takeoff in one window, priced openly per user per month
- From
- 167/month
- Rated
- -
The short version
- Each has a real cost: CMiC no specific pricing disclosed on website; Cubit Estimating every subscription carries a minimum twelve month term, so a firm that hires an estimator for one tender period pays for the full year regardless.
- They diverge on capability: CMiC covers Project management, Cubit Estimating covers Integrated takeoff and estimate.
- Prices and features above were last checked on 1 September 2026.
Where they differ
Only the attributes on which CMiC and Cubit Estimating actually diverge.
| Attribute | CMiC | Cubit Estimating |
|---|---|---|
| Starting price | $300/month | 167/month |
| Pricing model | subscription | Per user per month |
| Platforms | Web, Ios, Android | Windows |
| Founded | 1985 | Unknown |
Identical on both: free tier (No), user rating (Not yet rated), category (Construction).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in CMiC
- Project management
- Accounting
- Document management
- Job costing
- Field operations
- QuickBooks
- Sage
- Microsoft 365
Only in Cubit Estimating
- Integrated takeoff and estimate
- Calculation and rate sheets
- Price list management
- Bills of quantities
- BIM and IFC takeoff
- Revision management
- AI Estimating add-on
- Job collaboration
What people use each for
The jobs each tool is most often brought in to do.
CMiC
- Insurance and risk managementnot Cubit Estimating
- Professional liability coveragenot Cubit Estimating
- Construction industry insurancenot Cubit Estimating
Cubit Estimating
- An Australian commercial builder that wants takeoff and estimate in one file rather than exporting quantities from a separate measurement toolnot CMiC
- A quantity surveying practice producing trade-structured bills of quantities to local conventionnot CMiC
- A subcontractor pricing repeat work from maintained supplier price lists rather than rebuilding rates each tendernot CMiC
- A small estimating team that needs to know the annual cost before booking a demo, because the rate card is publishednot CMiC
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
CMiC
- No specific pricing disclosed on website
- Website directs users to /pricing page for quotes only
- Custom quoting model used for all customers
- No tiered plans or standard pricing published
Cubit Estimating
- Every subscription carries a minimum twelve month term, so a firm that hires an estimator for one tender period pays for the full year regardless.
- BIM and IFC takeoff sits only in Enterprise at $250 per user per month, meaning a builder who receives models rather than PDFs is pushed to the top tier whether or not it needs collaboration features.
- The product is Windows only with no macOS or browser client, which excludes practices standardised on Macs unless they run virtualisation.
- Rate libraries, measurement conventions and BOQ structures follow Australian practice, so buyers outside Australia and New Zealand inherit a method that does not match their local standard forms.
- The AI Estimating add-on is priced at an explicitly temporary introductory rate, so a firm building the feature into its workflow is accepting an unspecified future increase on top of the seat price.
Pricing, plan by plan
CMiC
$300/month- Core$300/month
- Project management
- Accounting
- Document management
- EnterpriseFree
- Mobile field app
- Advanced analytics
- API access
Cubit Estimating
167/month- Standard$167/month
- Integrated estimating and takeoff
- Calculation sheets, rate sheets and price lists
- Basic job management
- Professional$222/month
- Everything in Standard
- Code grouping
- Custom reporting
- Enterprise$250/month
- Everything in Professional
- BIM and IFC takeoff
- Multi-user job collaboration
- AI Estimating add-on$20/month
- Automated element recognition
- Works with any edition
- Introductory rate the vendor says will increase
Which should you pick?
Choose CMiC if
- You need project management.
- You work on Web, Ios, Android.
- You also want accounting.
Choose Cubit Estimating if
- You need integrated takeoff and estimate.
- You work on Windows.
- You also want calculation and rate sheets.
Questions people ask
- Is CMiC or Cubit Estimating better?
- Neither clearly leads. CMiC starts at $300/month and Cubit Estimating at 167/month, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, CMiC or Cubit Estimating?
- CMiC starts at $300/month and Cubit Estimating at 167/month.
- Does CMiC or Cubit Estimating run on more platforms?
- CMiC runs on Web, Ios, Android. Cubit Estimating runs on Windows.
- What is CMiC best used for?
- CMiC is most often used for insurance and risk management, professional liability coverage, construction industry insurance. Of those, insurance and risk management and professional liability coverage are not what Cubit Estimating is typically brought in for.
- What can CMiC do that Cubit Estimating cannot?
- CMiC covers Project management, Accounting, Document management, Job costing. Cubit Estimating covers Integrated takeoff and estimate, Calculation and rate sheets, Price list management, Bills of quantities.
Answered from the vendors’ own pages
CMiC: How much does CMiC cost?
CMiC does not publish fixed pricing on its website. The company uses a custom quote model. Interested parties must visit the /pricing page or contact CMiC directly to request a quote for their specific needs.
SourceCubit Estimating: What does Cubit actually cost?
Standard $167, Professional $222 and Enterprise $250 per user per month on annual billing, in Australian dollars excluding GST. Monthly billing is about 16 per cent more.
CMiC: What is CMiC's pricing model?
CMiC uses a custom enterprise pricing model rather than published tiered plans. All pricing is determined on a case-by-case basis through their sales team.
SourceCubit Estimating: Can I get BIM takeoff without the Enterprise tier?
No. IFC model takeoff is an Enterprise feature only.
Cubit Estimating: Is there a perpetual licence?
No. Cubit Estimating is subscription only with a minimum twelve month commitment.
Cubit Estimating: Does it suit contractors outside Australia?
It works, but rate libraries and BOQ conventions follow Australian standards, so buyers elsewhere do more setup than a locally built alternative would need.
Related pages
More on Cubit Estimating
Other head to heads
- CMiC vs Procore
- CMiC vs SketchUp
- CMiC vs ArchiCAD
- CMiC vs Autodesk Revit
- CMiC vs Jonas Premier
- CMiC vs Viewpoint Vista
- CMiC vs e-Builder
- CMiC vs Sage 300 Construction
- CMiC vs Foundation Software
- CMiC vs Adaptive
- CMiC vs HCSS
- CMiC vs Primavera P6
- CMiC vs Builderbox
- CMiC vs Buildots
- CMiC vs Buildxact
- CMiC vs Chief Architect
- CMiC vs Clearstory
- CMiC vs CoConstruct
- CMiC vs Togal.AI
- CMiC vs PlanSwift
- CMiC vs Sage Estimating
- CMiC vs Bluebeam Revu
- CMiC vs RIB CostX
- CMiC vs On-Screen Takeoff
- CMiC vs HCSS HeavyBid
- CMiC vs Handoff
- CMiC vs STACK Construction Technologies
- CMiC vs B2W Estimate
- CMiC vs Dalux
- CMiC vs Bridgit Bravo
- Cubit Estimating vs Procore
- Cubit Estimating vs SketchUp
- Cubit Estimating vs ArchiCAD
- Cubit Estimating vs Autodesk Revit
- Cubit Estimating vs Jonas Premier
- Cubit Estimating vs Viewpoint Vista
- Cubit Estimating vs e-Builder
- Cubit Estimating vs Sage 300 Construction
- Cubit Estimating vs Foundation Software
- Cubit Estimating vs Adaptive
- Cubit Estimating vs HCSS
- Cubit Estimating vs Primavera P6
- Cubit Estimating vs Builderbox
- Cubit Estimating vs Buildots
- Cubit Estimating vs Buildxact
- Cubit Estimating vs Chief Architect
- Cubit Estimating vs Clearstory
- Cubit Estimating vs CoConstruct
- Cubit Estimating vs Togal.AI
- Cubit Estimating vs PlanSwift
- Cubit Estimating vs Sage Estimating
- Cubit Estimating vs Bluebeam Revu
- Cubit Estimating vs RIB CostX
- Cubit Estimating vs On-Screen Takeoff
- Cubit Estimating vs HCSS HeavyBid
- Cubit Estimating vs Handoff
- Cubit Estimating vs STACK Construction Technologies
- Cubit Estimating vs B2W Estimate
- Cubit Estimating vs Dalux
- Cubit Estimating vs Bridgit Bravo

