Softwr

Software · head to head

3DEC vs Minemax

3

3DEC

Software

3D distinct element code for underground mining

From
On request
Rated
-
Minemax logo

Minemax

Software

Integrated mining software for geological and operational excellence

From
On request
Rated
-

The short version

  • Each has a real cost: 3DEC pricing is not published; licences are quoted, with subscription and perpetual options; Minemax minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range
  • They diverge on capability: 3DEC covers 3D distinct element analysis, Minemax covers Geological modeling.

Where they differ

Only the attributes on which 3DEC and Minemax actually diverge.

Attributes where 3DEC and Minemax differ
Attribute3DECMinemax
PlatformsWindows, LinuxWindows
Founded19811995

Identical on both: starting price (On request), pricing model (subscription), free tier (No), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in 3DEC

  • 3D distinct element analysis
  • Block motion tracking
  • Contact detection
  • Support design
  • Dynamic simulation
  • FLAC3D
  • Python
  • Linux support

Only in Minemax

  • Geological modeling
  • Mine design
  • Resource estimation
  • Production scheduling
  • Pit optimization
  • Datamine
  • Surpac
  • SAP

Both cover

  • Leapfrog
  • Vulcan
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

3DEC

  • Three-dimensional analysis of jointed rock and discontinuous materialsnot Minemax
  • Slope stability and pillar analysis for miningnot Minemax
  • Blast and earthquake dynamic analysisnot Minemax
  • Groundwater flow through fractured rocknot Minemax
  • Coupled thermal, mechanical and hydraulic modelling for geothermal, CO2 sequestration and nuclear wastenot Minemax

Minemax

  • Strategic open pit and underground mine schedule optimisationnot 3DEC
  • Life of mine planning to maximise net present valuenot 3DEC
  • Operational short interval mine schedulingnot 3DEC

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

3DEC

  • Pricing is not published; licences are quoted, with subscription and perpetual options
  • A specialist geomechanical tool rather than general purpose simulation, so it assumes the user is a rock mechanics engineer

Minemax

  • minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range
  • No pricing is published for any Minemax product; licences are obtained by contacting the Datamine sales team
  • Products are sold as role based Planning Bundles rather than individual licences, with the claimed saving of up to 33 percent measured against standalone licence cost

Pricing, plan by plan

3DEC

On request
  • 3DEC Professional$25000/year
    • 3D distinct element analysis
    • Block-to-block interaction
    • Support installation modeling

Minemax

On request
  • Minemax Standard$13000/year
    • Geological modeling
    • Mine design
    • Resource estimation
  • Minemax Premium$23000/year
    • Advanced optimization
    • Production scheduling
    • Fleet management

Which should you pick?

Choose 3DEC if

  • You need 3d distinct element analysis.
  • You work on Windows, Linux.
  • You also want block motion tracking.

Choose Minemax if

  • You need geological modeling.
  • You work on Windows.
  • You also want mine design.

Questions people ask

Is 3DEC or Minemax better?
Neither clearly leads. 3DEC starts at On request and Minemax at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, 3DEC or Minemax?
3DEC starts at On request and Minemax at On request.
Does 3DEC or Minemax run on more platforms?
3DEC runs on Windows, Linux. Minemax runs on Windows.
What is 3DEC best used for?
3DEC is most often used for three-dimensional analysis of jointed rock and discontinuous materials, slope stability and pillar analysis for mining, blast and earthquake dynamic analysis, groundwater flow through fractured rock. Of those, three-dimensional analysis of jointed rock and discontinuous materials and slope stability and pillar analysis for mining are not what Minemax is typically brought in for.
What can 3DEC do that Minemax cannot?
3DEC covers 3D distinct element analysis, Block motion tracking, Contact detection, Support design. Minemax covers Geological modeling, Mine design, Resource estimation, Production scheduling. Both handle Leapfrog, Vulcan, Windows support.

Related pages

Other head to heads