Softwr

Manufacturing · head to head

Duro PLM vs Fictiv

Duro PLM logo

Duro PLM

Manufacturing

Hosted PLM for hardware startups, sold in fixed user bands with no published price

From
On request
Rated
-
Fictiv logo

Fictiv

Manufacturing

On-demand custom manufacturing with instant CAD quoting, now owned by MISUMI

From
On request
Rated
-

The short version

  • Each has a real cost: Duro PLM no pricing is published anywhere, so budgeting requires a sales conversation and buyers cannot compare against alternatives without entering a pipeline.; Fictiv this is a manufacturing service, not software you licence, so there is nothing to deploy or own and switching means re-sourcing parts rather than exporting data.
  • They diverge on capability: Duro PLM covers Part library, Fictiv covers Instant CAD quoting.
  • Prices and features above were last checked on 31 August 2026.

Where they differ

Only the attributes on which Duro PLM and Fictiv actually diverge.

Attributes where Duro PLM and Fictiv differ
AttributeDuro PLMFictiv
PlatformsWebWeb, Cloud

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Manufacturing).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Duro PLM

  • Part library
  • Multi-level BOMs
  • Change orders
  • CAD integrations
  • Supplier and cost data
  • User band plans

Only in Fictiv

  • Instant CAD quoting
  • Design for manufacturing feedback
  • Multi-region network
  • Multiple processes
  • Quality documentation
  • Order and revision tracking
  • Bridge to production

What people use each for

The jobs each tool is most often brought in to do.

Duro PLM

  • A robotics startup imposing change control on a design before releasing it to a contract manufacturernot Fictiv
  • A consumer electronics team tracking supplier part numbers and costs against every item in the BOMnot Fictiv
  • A hardware company whose engineers keep overwriting each other's BOM spreadsheet versionsnot Fictiv
  • A venture-funded startup that needs a defensible change history before a first production buildnot Fictiv

Fictiv

  • An engineering team needing machined prototypes in days without qualifying a machine shop firstnot Duro PLM
  • Moving a part between regions to change landed cost or tariff exposure without re-sourcing a suppliernot Duro PLM
  • Bridge production between prototype tooling and a committed high-volume suppliernot Duro PLM
  • Getting design-for-manufacturing feedback on a part before committing to injection mould toolingnot Duro PLM

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Duro PLM

  • No pricing is published anywhere, so budgeting requires a sales conversation and buyers cannot compare against alternatives without entering a pipeline.
  • Plans are sold in fixed user bands rather than per seat, so hiring an eleventh engineer moves you to the next tier instead of adding one seat.
  • Storage allowances are capped at 25, 50 and 100 GB, which is tight for teams keeping native CAD files rather than only neutral formats.
  • There is no self-hosted or on-premises option, which rules Duro out for defence and some aerospace suppliers with data residency or ITAR handling constraints.
  • Scope stops at engineering data: no requirements management, no quality module and no manufacturing process planning, so it does not replace the systems a company needs at production scale.

Fictiv

  • This is a manufacturing service, not software you licence, so there is nothing to deploy or own and switching means re-sourcing parts rather than exporting data.
  • A broker sits between you and the shop cutting your part, so at stable production volumes direct sourcing usually beats the platform price and the platform knows it.
  • You do not choose or generally know the specific supplier, which makes process control, supplier audits and traceability harder in regulated or aerospace work.
  • MISUMI completed a $350 million acquisition in June 2025, so roadmap and pricing now answer to a Japanese industrial components group rather than to an independent platform strategy.
  • Instant quotes are geometry-driven and complex or tightly toleranced parts drop into engineer review, so the speed advantage that justified the choice disappears exactly on the parts that are hardest to source.

Pricing, plan by plan

Duro PLM

On request
  • Team$undefined/year
    • Up to 10 users
    • 25 GB data storage
    • Part library, BOMs and change orders
  • Business$undefined/year
    • Up to 20 users
    • 50 GB data storage
    • CAD integrations
  • Enterprise$undefined/year
    • 20 or more users
    • 100 GB data storage
    • Extended support

Fictiv

On request
  • Per-part quoting$undefined/month
    • No subscription or platform fee
    • Priced per part by geometry, material, process and quantity
    • Instant quotes for many processes, engineer review for complex parts

Which should you pick?

Choose Duro PLM if

  • You need part library.
  • You also want multi-level boms.

Choose Fictiv if

  • You need instant cad quoting.
  • You work on Web, Cloud.
  • You also want design for manufacturing feedback.

Questions people ask

Is Duro PLM or Fictiv better?
Neither clearly leads. Duro PLM starts at On request and Fictiv at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Duro PLM or Fictiv?
Duro PLM starts at On request and Fictiv at On request.
Does Duro PLM or Fictiv run on more platforms?
Duro PLM runs on Web. Fictiv runs on Web, Cloud.
What is Duro PLM best used for?
Duro PLM is most often used for a robotics startup imposing change control on a design before releasing it to a contract manufacturer, a consumer electronics team tracking supplier part numbers and costs against every item in the bom, a hardware company whose engineers keep overwriting each other's bom spreadsheet versions, a venture-funded startup that needs a defensible change history before a first production build. Of those, a robotics startup imposing change control on a design before releasing it to a contract manufacturer and a consumer electronics team tracking supplier part numbers and costs against every item in the bom are not what Fictiv is typically brought in for.
What can Duro PLM do that Fictiv cannot?
Duro PLM covers Part library, Multi-level BOMs, Change orders, CAD integrations. Fictiv covers Instant CAD quoting, Design for manufacturing feedback, Multi-region network, Multiple processes.

Answered from the vendors’ own pages

Duro PLM: How much does Duro cost?

Duro does not publish prices. Plans are fixed annual subscriptions quoted by sales against a user band, billed Net 30.

Fictiv: Is Fictiv software I can buy?

No. It is an on-demand manufacturing service with a quoting and order management platform. You pay for parts, not for the software.

Duro PLM: Can I run Duro on my own servers?

No. It is cloud only, which is a hard blocker for organisations with data residency or export control requirements.

Fictiv: Is Fictiv still independent?

No. MISUMI Group completed its acquisition, valued at $350 million, in June 2025. Fictiv continues to trade under its own name.

Duro PLM: What happens when we exceed our user band?

You move to the next tier rather than adding individual seats, so growth arrives as a step change in cost.

Fictiv: Do I know which factory makes my part?

Generally not. Fictiv manages a vetted network and allocates work within it, which is a limitation if your quality system requires named and audited suppliers.

Duro PLM: Is Duro suitable for medical device work?

Its change control is real but the workflow configuration and audit depth are lighter than dedicated regulated-industry PLM, so most ISO 13485 programmes need more.

Fictiv: Is it cheaper than sourcing directly?

For prototypes and low volumes, usually yes once you count the cost of finding and qualifying a supplier. At stable production volumes, direct sourcing is normally cheaper.

Share

Related pages

Other head to heads