Softwr

Construction · head to head

B2W Estimate vs Clockwise

B2W Estimate logo

B2W Estimate

Construction

Heavy civil estimating and bidding built on crew, equipment and production rates rather than unit prices

From
On request
Free plan
No
C

Clockwise

Project Management

Intelligent calendar management for teams

From
Free
Free plan
Yes

The short version

  • Clockwise is an AI-powered calendar assistant.
  • Clockwise starts at $6.75/mo; B2W Estimate prices on request.
  • Only B2W Estimate lists production-rate estimating; only Clockwise lists focus Time protection.
  • Where Clockwise falls short: service discontinued and shut down on March 27, 2026.
  • Prices and features on this page were last checked on 26 November 2026.

How do B2W Estimate and Clockwise differ?

B2W Estimate and Clockwise differ on starting price (On request against Free), pricing model (Quote against Freemium) and free tier (No against Yes). Only the attributes on which B2W Estimate and Clockwise actually diverge.

Attributes where B2W Estimate and Clockwise differ
AttributeB2W EstimateClockwise
Starting priceOn requestFree
Pricing modelQuoteFreemium
Free tierNoYes
PlatformsWindows, WebWeb
CategoryConstructionProject Management
Founded19932016

Which features does each one have?

They share no listed features; 7 appear only for B2W Estimate and 11 only for Clockwise. Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in B2W Estimate

  • Production-rate estimating
  • Central resource database
  • Concurrent bidding
  • DOT bid file export
  • Alternates and addenda
  • Field feedback loop
  • Bid analysis

Only in Clockwise

  • Focus Time protection
  • Meeting optimization
  • Scheduling links
  • Team analytics
  • Conflict resolution
  • Google Calendar
  • Slack
  • Zoom

What is each one used for?

Clockwise is most often brought in for scheduling. The jobs each tool is most often brought in to do.

B2W Estimate

  • A grading contractor bids a 40 million dollar DOT job and needs to test three crew configurations against the same quantities before the bid deadlinenot Clockwise
  • A utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimatenot Clockwise
  • An estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by handnot Clockwise
  • A contractor moving off HeavyBid wants a resource database it can reuse across estimating, dispatch and fleet maintenancenot Clockwise

Clockwise

  • Schedulingnot B2W Estimate
  • Appointment bookingnot B2W Estimate
  • Time trackingnot B2W Estimate
  • Resource managementnot B2W Estimate
  • Team coordinationnot B2W Estimate

Where do B2W Estimate and Clockwise fall short?

Clockwise's most cited limit: service discontinued and shut down on March 27, 2026. Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

B2W Estimate

  • Pricing is not published anywhere, and the quote depends on estimator seats plus which of the four other B2W modules you take, so like-for-like comparison with HeavyBid or spreadsheets is impossible without going through a sales cycle
  • The system is worthless until your own crews, equipment and production rates are loaded, which is typically several months of a senior estimator's time before the first bid comes out
  • It is aimed squarely at heavy civil self-performing work, so a general contractor whose bids are mostly subcontractor quotes gets very little from the production-rate engine
  • The Trimble acquisition means the product now competes internally with other Trimble civil estimating assets, and buyers should ask directly about the long term roadmap for overlapping products before signing a multi-year term
  • Reporting outside the Inform module is limited, so organisations that want bid analytics across years typically end up buying another module or extracting to a warehouse

Clockwise

  • Service discontinued and shut down on March 27, 2026
  • All user data was deleted upon shutdown
  • Integration with Asana was removed during product lifecycle

How much do B2W Estimate and Clockwise cost?

B2W Estimate is priced on request; Clockwise has a free plan, with paid plans from $6.75/mo. Plan by plan below, from each vendor's own pricing page.

B2W Estimate

On request
  • B2W EstimateOn request
    • Priced per estimator seat with a separate server or hosting component
    • Additional B2W modules quoted separately
    • Implementation and resource database setup billed as a project
  • BasicOn request
  • ProfessionalOn request
  • EnterpriseOn request

Clockwise

Free
  • FreeFree
    • Focus Time
    • Meeting optimization
    • Personal analytics
  • Teams$6.75/mo
    • Team analytics
    • Flexible meetings
    • Admin controls

Which should you pick?

Choose B2W Estimate if

  • You need production-rate estimating.
  • You work on Windows, Web.
  • You also want central resource database.

Choose Clockwise if

  • You need focus time protection.
  • You want to start without paying.
  • You also want meeting optimization.

Questions people ask

Is B2W Estimate or Clockwise better?
Neither clearly leads. B2W Estimate starts at On request and Clockwise at Free, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, B2W Estimate or Clockwise?
Clockwise has a free tier; the other does not. Paid plans start at On request for B2W Estimate and Free for Clockwise.
Does B2W Estimate or Clockwise run on more platforms?
B2W Estimate runs on Windows, Web. Clockwise runs on Web.
Can I use Clockwise for free?
Yes. Clockwise has a free tier, so you can try it without paying. B2W Estimate starts at On request.
What is B2W Estimate best used for?
B2W Estimate is most often used for a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline, a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate, an estimating department with four estimators needs several people working on separate sections of one bid without merging spreadsheets by hand, a contractor moving off heavybid wants a resource database it can reuse across estimating, dispatch and fleet maintenance. Of those, a grading contractor bids a 40 million dollar dot job and needs to test three crew configurations against the same quantities before the bid deadline and a utility contractor wants the production rates used in the winning bid pushed into field logging so the superintendent is measured against the estimate are not what Clockwise is typically brought in for.
What can B2W Estimate do that Clockwise cannot?
B2W Estimate covers Production-rate estimating, Central resource database, Concurrent bidding, DOT bid file export. Clockwise covers Focus Time protection, Meeting optimization, Scheduling links, Team analytics.

Answered from the vendors’ own pages

B2W Estimate: Is B2W Estimate still sold under its own name?

Yes. Trimble acquired B2W in 2022 and continues to sell it as B2W Estimate within the Trimble Construction portfolio.

Clockwise: What happened to Clockwise?

Clockwise was acquired by Salesforce and shut down on March 27, 2026. The company announced the team was joining Salesforce to work on Agentforce. User data was deleted and prorated refunds were issued to paying customers.

Source
B2W Estimate: Is there a perpetual licence?

Current sales are subscription based. Existing perpetual customers have been migrated toward subscription, so treat a perpetual arrangement as something to negotiate rather than assume.

Clockwise: What integrations did Clockwise support?

Clockwise integrated with Google Calendar, Microsoft Outlook, Slack, and previously Asana (though this integration was discontinued).

Source
B2W Estimate: How does it compare with HeavyBid?

Both are production-rate estimators for heavy civil. B2W's argument is the shared resource database across estimating, field tracking, dispatch and maintenance; HeavyBid's is depth of bidding features and a large installed base in highway work.

Clockwise: What were Clockwise's key features?

Clockwise offered AI-powered focus time protection, automatic meeting buffers, Slack status sync, smart lunch breaks, and team calendar synchronization to optimize schedules and prevent burnout.

Source
B2W Estimate: Does it work for building construction?

Poorly. It assumes self-performed work priced by crew output. Vertical builders bidding mostly subcontracted scopes should look elsewhere.

Share

Related pages

Other head to heads