Software · head to head
Datamine vs Minemax Planner
D
Datamine
Software
Integrated mining software for resource estimation and planning
- From
- On request
- Rated
- -

Minemax Planner
Software
Strategic mine planning and optimization software
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Datamine datamine publishes no price, no licence term and no named cost driver; the planning pages route buyers to a consultation or a sales contact form; Minemax Planner minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- They diverge on capability: Datamine covers Resource estimation, Minemax Planner covers Schedule optimization.
Where they differ
Only the attributes on which Datamine and Minemax Planner actually diverge.
| Attribute | Datamine | Minemax Planner |
|---|---|---|
| Founded | 1986 | 1997 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Unknown).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Datamine
- Resource estimation
- Geostatistical analysis
- Geological modeling
- Block modeling
- Grade control
- MineSight
- Leapfrog
- SAP
Only in Minemax Planner
- Schedule optimization
- NPV maximization
- Cutoff grade optimization
- Pushback scheduling
- Multi-scenario analysis
- Whittle
- Deswik
- Excel
Both cover
- Vulcan
- Surpac
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Datamine
- Geological modelling and resource estimation for mining projectsnot Minemax Planner
- Open pit and underground mine design and schedulingnot Minemax Planner
- Drill and blast design, survey and production reconciliationnot Minemax Planner
Minemax Planner
- Mine production scheduling and plan trackingnot Datamine
- Comparing life of mine scenarios against a base plannot Datamine
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Datamine
- Datamine publishes no price, no licence term and no named cost driver; the planning pages route buyers to a consultation or a sales contact form
- The portfolio is split into many separate products across strategy, design, scheduling, blasting, survey and production, so a complete workflow requires assembling several licences
- Products acquired from other vendors, including Minemax Scheduler and Minemax Tempo, are now sold inside Datamine bundles rather than standalone
Minemax Planner
- minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- No pricing is published; licences require contacting the Datamine sales team
- Planning capability is sold in role based bundles rather than as a single named planner licence
Pricing, plan by plan
Datamine
On request- Datamine Studio$14000/year
- Resource estimation
- Geostatistics
- Geological modeling
- Datamine Advanced$24000/year
- Advanced optimization
- Strategic planning
- Risk analysis
Minemax Planner
On request- Minemax Planner$20000/year
- Schedule optimization
- NPV maximization
- Cutoff grade analysis
- Minemax Enterprise$40000/year
- Multi-mine planning
- Advanced optimization
- Integration APIs
Which should you pick?
Choose Datamine if
- You need resource estimation.
- You work on Windows.
- You also want geostatistical analysis.
Choose Minemax Planner if
- You need schedule optimization.
- You work on Windows.
- You also want npv maximization.
Questions people ask
- Is Datamine or Minemax Planner better?
- Neither clearly leads. Datamine starts at On request and Minemax Planner at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Datamine or Minemax Planner?
- Datamine starts at On request and Minemax Planner at On request.
- Does Datamine or Minemax Planner run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Datamine best used for?
- Datamine is most often used for geological modelling and resource estimation for mining projects, open pit and underground mine design and scheduling, drill and blast design, survey and production reconciliation. Of those, geological modelling and resource estimation for mining projects and open pit and underground mine design and scheduling are not what Minemax Planner is typically brought in for.
- What can Datamine do that Minemax Planner cannot?
- Datamine covers Resource estimation, Geostatistical analysis, Geological modeling, Block modeling. Minemax Planner covers Schedule optimization, NPV maximization, Cutoff grade optimization, Pushback scheduling. Both handle Vulcan, Surpac, Windows support.
Related pages
More on Minemax Planner
Keep looking
Other head to heads
- Datamine vs Caterpillar MineStar
- Datamine vs Leapfrog Geo
- Datamine vs Deswik Suite
- Datamine vs Dassault Systemes GEOVIA
- Datamine vs Hexagon PPM Mining
- Datamine vs Micromine
- Datamine vs Datamine Studio RM
- Datamine vs Maptek I-Site
- Datamine vs Minemax
- Datamine vs Promine
- Datamine vs Surpac
- Datamine vs Trimble Mining
- Datamine vs Vulcan
- Datamine vs 3DEC
- Datamine vs acQuire GIM Suite
- Datamine vs Carlson Mining
- Datamine vs Cority EHS
- Datamine vs Enablon EHS
- Minemax Planner vs Caterpillar MineStar
- Minemax Planner vs Leapfrog Geo
- Minemax Planner vs Deswik Suite
- Minemax Planner vs Dassault Systemes GEOVIA
- Minemax Planner vs Hexagon PPM Mining
- Minemax Planner vs Micromine
- Minemax Planner vs Datamine Studio RM
- Minemax Planner vs Maptek I-Site
- Minemax Planner vs Minemax
- Minemax Planner vs Promine
- Minemax Planner vs Surpac
- Minemax Planner vs Trimble Mining
- Minemax Planner vs Vulcan
- Minemax Planner vs 3DEC
- Minemax Planner vs acQuire GIM Suite
- Minemax Planner vs Carlson Mining
- Minemax Planner vs Cority EHS
- Minemax Planner vs Enablon EHS
