Softwr

Software · pricing

Minemax Planner pricing

Minemax Planner publishes 2 tiers. Below is each one, what it adds over the tier beneath it, and where the ladder stops being worth climbing for most people.

Entry price
On request
Model
Subscription
Tiers
2
Free tier
Not on record

Minemax Planner plans, side by side

Every published tier in ascending order of price, with the number of features each one lists. An absence here means the record does not itemise it, not that the tier lacks it.

Minemax Planner pricing tiers
PlanPriceFeatures listedStep up from the tier below
Minemax Planner$20000/year4Entry tier
Minemax Enterprise$40000/year4+$20000/year, 4 more features

What each tier adds

The set difference between each tier's feature list and the one beneath it. Where a tier lists nothing new, the vendor has either stopped repeating the inherited list or the tier raises limits rather than adding capability, the record does not distinguish the two, so this page does not either.

Minemax Planner

$20000/year

The entry tier. It covers schedule optimization, npv maximization, cutoff grade analysis, scenario modeling.

Minemax Enterprise

$40000/year

Over Minemax Planner, this tier adds:

  • Multi-mine planning
  • Advanced optimization
  • Integration APIs
  • Custom solutions

What the product covers

The full Minemax Planner feature record, grouped as the catalogue groups it. This is the product as a whole; the record does not map every feature onto a specific tier.

Core

  • Schedule optimization
  • NPV maximization
  • Cutoff grade optimization
  • Pushback scheduling
  • Multi-scenario analysis

Integrations

  • Vulcan
  • Surpac
  • Whittle
  • Deswik
  • Excel

Platform

  • Windows support

People bring Minemax Planner in for mine production scheduling and plan tracking, comparing life of mine scenarios against a base plan. If that is not the job you are buying for, the alternatives to Minemax Planner are worth a look before you commit to a tier.

Before you pay for Minemax Planner

Three things this page cannot tell you, and all three change the bill. The record carries a price and a billing period but not the unit - per-seat and flat-rate pricing are indistinguishable in this data, so a five-person team may be looking at five times the figure above. It carries no annual rate, so any discount for paying yearly is not something this page can quote. And it carries no trial length.

What it can tell you is the shape of the ladder: 2 tiers between $20000/year and $40000/year, with the jump itemised above. With no free tier on record, the cheapest way to answer the rest is to compare Minemax Planner against the tools that do have one before committing.

Minemax Planner runs on windows, and is published by Minemax of Perth, Australia. The full record is on the Minemax Planner review.

Minemax Planner pricing on the vendor's own site

Minemax Planner pricing questions

How much does Minemax Planner cost?
Minemax Planner publishes 2 tiers, from $20000/year for Minemax Planner up to $40000/year for Minemax Enterprise. The cheapest paid tier is $20000/year.
Does Minemax Planner have a free plan?
Not on the record we hold: Minemax Planner is listed as subscription. Whether a free trial is offered is not something this record captures, so check the vendor's site.
What is the difference between Minemax Planner and Minemax Enterprise on Minemax Planner?
Minemax Enterprise costs $40000/year against $20000/year, and adds multi-mine planning, advanced optimization, integration apis, custom solutions.
Is the Minemax Enterprise plan on Minemax Planner worth it?
That depends entirely on whether you need what it adds, which on the published record is multi-mine planning, advanced optimization, integration apis, custom solutions. It costs $40000/year against $20000/year for Minemax Planner. Softwr has not used either tier, so this page can tell you what changes, not whether it is worth the difference to you.
What am I actually paying for with Minemax Planner?
The record lists 11 features across 3 areas: core, integrations, platform. In practice it is brought in for mine production scheduling and plan tracking, comparing life of mine scenarios against a base plan.
Does Minemax Planner charge per user?
The record carries a price and a billing period for each of its 2 tiers, but not the unit that price is charged in. Per-seat and flat-rate billing look identical in this data, so check the vendor's page before budgeting for a team.
Are these Minemax Planner prices current?
They are what the catalogue entry holds, refreshed when the entry is. Vendors change pricing without notice and nobody at Softwr re-verifies each tier by hand, so treat this as a structured summary and the vendor's own pricing page as the authority.
What should I compare Minemax Planner against before paying?
Nothing else in this directory is filed close enough to Minemax Planner to make a useful price comparison.

Related pages