Mining · head to head
Fusion Mining vs Minemax Planner

Minemax Planner
Mining
Strategic mine planning and optimization software
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Fusion Mining no published pricing information; described as a full-service digital product studio; Minemax Planner minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- They diverge on capability: Fusion Mining covers Geological modeling, Minemax Planner covers Schedule optimization.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which Fusion Mining and Minemax Planner actually diverge.
| Attribute | Fusion Mining | Minemax Planner |
|---|---|---|
| Founded | 2004 | 1997 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Fusion Mining
- Geological modeling
- Mine design
- Resource estimation
- Database management
- 3D visualization
- Leapfrog
- AutoCAD
Only in Minemax Planner
- Schedule optimization
- NPV maximization
- Cutoff grade optimization
- Pushback scheduling
- Multi-scenario analysis
- Surpac
- Whittle
- Deswik
Both cover
- Vulcan
- Excel
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Fusion Mining
- Geological modelingnot Minemax Planner
- Mine planningnot Minemax Planner
- Resource estimationnot Minemax Planner
- Exploration databasesnot Minemax Planner
Minemax Planner
- Mine production scheduling and plan trackingnot Fusion Mining
- Comparing life of mine scenarios against a base plannot Fusion Mining
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Fusion Mining
- No published pricing information; described as a full-service digital product studio
- Pricing determined through direct consultation based on project scope
Minemax Planner
- minemax.com/products returns a 301 redirect to dataminesoftware.com and no product named Planner is listed on the Datamine planning solutions page
- No pricing is published; licences require contacting the Datamine sales team
- Planning capability is sold in role based bundles rather than as a single named planner licence
Pricing, plan by plan
Fusion Mining
On request- Fusion Standard$8500/year
- Geological modeling
- Mine design
- Resource estimation
Minemax Planner
On request- Minemax Planner$20000/year
- Schedule optimization
- NPV maximization
- Cutoff grade analysis
- Minemax Enterprise$40000/year
- Multi-mine planning
- Advanced optimization
- Integration APIs
Which should you pick?
Choose Fusion Mining if
- You need geological modeling.
- You work on Windows.
- You also want mine design.
Choose Minemax Planner if
- You need schedule optimization.
- You work on Windows.
- You also want npv maximization.
Questions people ask
- Is Fusion Mining or Minemax Planner better?
- Neither clearly leads. Fusion Mining starts at On request and Minemax Planner at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Fusion Mining or Minemax Planner?
- Fusion Mining starts at On request and Minemax Planner at On request.
- Does Fusion Mining or Minemax Planner run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Fusion Mining best used for?
- Fusion Mining is most often used for geological modeling, mine planning, resource estimation, exploration databases. Of those, geological modeling and mine planning are not what Minemax Planner is typically brought in for.
- What can Fusion Mining do that Minemax Planner cannot?
- Fusion Mining covers Geological modeling, Mine design, Resource estimation, Database management. Minemax Planner covers Schedule optimization, NPV maximization, Cutoff grade optimization, Pushback scheduling. Both handle Vulcan, Excel, Windows support.
Answered from the vendors’ own pages
Fusion Mining: How does Fusion pricing work?
Fusion is a full-service digital product studio offering strategy, design, and technology solutions. No pricing information is published on their website. Interested parties are directed to contact Fusion directly at 1300 849 158 or through their contact page to discuss services and pricing.
SourceMinemax Planner: What discount do planning bundles offer compared to standalone Minemax licenses?
Minemax planning bundles save up to 33% versus purchasing standalone licenses.
SourceFusion Mining: What services does Fusion offer?
Fusion provides strategy, design, and technology services for digital product development. Custom pricing is available based on specific project requirements and scope.
SourceMinemax Planner: What are the three Minemax planning subscription tiers?
Strategic Mine Planner, Operations Planner, and Surveyor/Technician bundles.
SourceMinemax Planner: How do I find pricing for Minemax Planner?
Specific pricing is not published on Minemax's website. You must contact the sales team directly via their contact form or book a consultation to discuss tailored solutions.
SourceRelated pages
More on Fusion Mining
More on Minemax Planner
Other head to heads
- Fusion Mining vs Dassault Systemes GEOVIA
- Fusion Mining vs Deswik Suite
- Fusion Mining vs Leapfrog Geo
- Fusion Mining vs Caterpillar MineStar
- Fusion Mining vs Minemax
- Fusion Mining vs Micromine
- Fusion Mining vs Vulcan
- Fusion Mining vs Datamine
- Fusion Mining vs Geoscience ANALYST
- Fusion Mining vs Promine
- Fusion Mining vs MineRP
- Fusion Mining vs Wenco
- Fusion Mining vs Whittle
- Fusion Mining vs OptiMine
- Fusion Mining vs Datamine Studio RM
- Fusion Mining vs Surpac
- Fusion Mining vs K-MINE
- Fusion Mining vs MinePlan
- Fusion Mining vs RPMGlobal TALPAC
- Fusion Mining vs Leica Geosystems Mining
- Fusion Mining vs Maxwell Datacloud
- Fusion Mining vs MineSight
- Fusion Mining vs PCBC
- Fusion Mining vs MineSched
- Minemax Planner vs Dassault Systemes GEOVIA
- Minemax Planner vs Deswik Suite
- Minemax Planner vs Leapfrog Geo
- Minemax Planner vs Caterpillar MineStar
- Minemax Planner vs Minemax
- Minemax Planner vs Micromine
- Minemax Planner vs Vulcan
- Minemax Planner vs Datamine
- Minemax Planner vs Geoscience ANALYST
- Minemax Planner vs Promine
- Minemax Planner vs MineRP
- Minemax Planner vs Wenco
- Minemax Planner vs Whittle
- Minemax Planner vs OptiMine
- Minemax Planner vs Datamine Studio RM
- Minemax Planner vs Surpac
- Minemax Planner vs K-MINE
- Minemax Planner vs MinePlan
- Minemax Planner vs RPMGlobal TALPAC
- Minemax Planner vs Leica Geosystems Mining
- Minemax Planner vs Maxwell Datacloud
- Minemax Planner vs MineSight
- Minemax Planner vs PCBC
- Minemax Planner vs MineSched

