Construction · head to head
Clearstory vs CMiC

Clearstory
Construction
Digital change order and time and materials tag exchange between subcontractors and general contractors
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Clearstory value depends on the counterparty using it, so a subcontractor whose general contractors have not adopted it ends up running the digital process and the emailed one at the same time.; CMiC no specific pricing disclosed on website
- They diverge on capability: Clearstory covers Digital time and materials tags, CMiC covers Project management.
- Prices and features above were last checked on 31 August 2026.
Where they differ
Only the attributes on which Clearstory and CMiC actually diverge.
| Attribute | Clearstory | CMiC |
|---|---|---|
| Starting price | On request | $300/month |
| Pricing model | quote | subscription |
| Founded | Unknown | 1985 |
Identical on both: free tier (No), platforms (Web, iOS, Android), user rating (Not yet rated), category (Construction).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Clearstory
- Digital time and materials tags
- Review and signature routing
- Change order log
- Cost exposure reporting
- Field mobile capture
- Document export
Only in CMiC
- Project management
- Accounting
- Document management
- Job costing
- Field operations
- QuickBooks
- Sage
- Microsoft 365
What people use each for
The jobs each tool is most often brought in to do.
Clearstory
- A speciality subcontractor that regularly performs extra work and struggles to get tags signednot CMiC
- A general contractor tired of receiving a stack of disputed tags at project closeoutnot CMiC
- A project team that needs the value of pending extras visible during the job rather than after itnot CMiC
- A contractor standardising change documentation across trades on a large projectnot CMiC
CMiC
- Insurance and risk managementnot Clearstory
- Professional liability coveragenot Clearstory
- Construction industry insurancenot Clearstory
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Clearstory
- Value depends on the counterparty using it, so a subcontractor whose general contractors have not adopted it ends up running the digital process and the emailed one at the same time.
- It documents extra work but does not settle it; a general contractor determined not to pay is not persuaded by better paperwork, only better positioned to be argued with.
- Field staff have to complete tags properly for the record to hold up, and the discipline required is the same discipline that was failing on paper.
- Poor connectivity in basements, plant rooms and lift shafts is exactly where extra work gets documented, so offline reliability needs testing before rollout rather than after.
- It overlaps with change management already present in Procore and similar platforms, so buyers must be clear about which system holds the authoritative log or they will maintain two.
CMiC
- No specific pricing disclosed on website
- Website directs users to /pricing page for quotes only
- Custom quoting model used for all customers
- No tiered plans or standard pricing published
Pricing, plan by plan
Clearstory
On request- Clearstory$undefined/year
- Digital time and materials tags
- Change order log
- Mobile field capture
CMiC
$300/month- Core$300/month
- Project management
- Accounting
- Document management
- EnterpriseFree
- Mobile field app
- Advanced analytics
- API access
Which should you pick?
Choose Clearstory if
- You need digital time and materials tags.
- You work on Web, iOS, Android.
- You also want review and signature routing.
Choose CMiC if
- You need project management.
- You work on Web, Ios, Android.
- You also want accounting.
Questions people ask
- Is Clearstory or CMiC better?
- Neither clearly leads. Clearstory starts at On request and CMiC at $300/month, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Clearstory or CMiC?
- Clearstory starts at On request and CMiC at $300/month.
- Does Clearstory or CMiC run on more platforms?
- Clearstory runs on Web, iOS, Android. CMiC runs on Web, Ios, Android.
- What is Clearstory best used for?
- Clearstory is most often used for a speciality subcontractor that regularly performs extra work and struggles to get tags signed, a general contractor tired of receiving a stack of disputed tags at project closeout, a project team that needs the value of pending extras visible during the job rather than after it, a contractor standardising change documentation across trades on a large project. Of those, a speciality subcontractor that regularly performs extra work and struggles to get tags signed and a general contractor tired of receiving a stack of disputed tags at project closeout are not what CMiC is typically brought in for.
- What can Clearstory do that CMiC cannot?
- Clearstory covers Digital time and materials tags, Review and signature routing, Change order log, Cost exposure reporting. CMiC covers Project management, Accounting, Document management, Job costing.
Answered from the vendors’ own pages
Clearstory: Is Clearstory for subcontractors or general contractors?
Both, because the workflow crosses between them. The subcontractor originates the tag, the general contractor reviews it, and adoption works best when the general contractor mandates it.
CMiC: How much does CMiC cost?
CMiC does not publish fixed pricing on its website. The company uses a custom quote model. Interested parties must visit the /pricing page or contact CMiC directly to request a quote for their specific needs.
SourceClearstory: Does it replace change management in Procore?
It can, for time and materials tags and the change order log, but you must decide which system is authoritative. Running both without that decision creates reconciliation work.
CMiC: What is CMiC's pricing model?
CMiC uses a custom enterprise pricing model rather than published tiered plans. All pricing is determined on a case-by-case basis through their sales team.
SourceClearstory: What happens on sites without signal?
Tags are captured on the device and synchronised later. Test that path with photographs attached before relying on it.
Related pages
Other head to heads
- Clearstory vs Procore
- Clearstory vs eSUB
- Clearstory vs Raken
- Clearstory vs Document Crunch
- Clearstory vs Siteline
- Clearstory vs Bridgit Bravo
- Clearstory vs GCPay
- Clearstory vs Kojo
- Clearstory vs Assignar
- Clearstory vs ConstructConnect
- Clearstory vs Reconstruct
- Clearstory vs Oracle Textura Payment Management
- Clearstory vs Adaptive
- Clearstory vs ALICE Technologies
- Clearstory vs B2W Estimate
- Clearstory vs Billd
- Clearstory vs SketchUp
- Clearstory vs ArchiCAD
- Clearstory vs Autodesk Revit
- Clearstory vs Jonas Premier
- Clearstory vs Viewpoint Vista
- Clearstory vs e-Builder
- Clearstory vs Sage 300 Construction
- Clearstory vs Foundation Software
- Clearstory vs HCSS
- Clearstory vs Primavera P6
- Clearstory vs Builderbox
- Clearstory vs Buildots
- Clearstory vs Buildxact
- Clearstory vs Chief Architect
- Clearstory vs CoConstruct
- CMiC vs Procore
- CMiC vs eSUB
- CMiC vs Raken
- CMiC vs Document Crunch
- CMiC vs Siteline
- CMiC vs Bridgit Bravo
- CMiC vs GCPay
- CMiC vs Kojo
- CMiC vs Assignar
- CMiC vs ConstructConnect
- CMiC vs Reconstruct
- CMiC vs Oracle Textura Payment Management
- CMiC vs Adaptive
- CMiC vs ALICE Technologies
- CMiC vs B2W Estimate
- CMiC vs Billd
- CMiC vs SketchUp
- CMiC vs ArchiCAD
- CMiC vs Autodesk Revit
- CMiC vs Jonas Premier
- CMiC vs Viewpoint Vista
- CMiC vs e-Builder
- CMiC vs Sage 300 Construction
- CMiC vs Foundation Software
- CMiC vs HCSS
- CMiC vs Primavera P6
- CMiC vs Builderbox
- CMiC vs Buildots
- CMiC vs Buildxact
- CMiC vs Chief Architect
- CMiC vs CoConstruct