Softwr

Mining · head to head

MinePlan vs MineSched

M

MinePlan

Mining

Life of mine planning and scheduling

From
On request
Rated
-
MineSched logo

MineSched

Mining

Production scheduling software for mining operations

From
On request
Rated
-

The short version

  • Each has a real cost: MinePlan the Internet Archive's capture of mineplan.com.au on 4 March 2020 already showed only a generic 'Website Coming Soon' hosting placeholder rather than a product page, indicating the domain has not hosted a live MinePlan site for at least several years.; MineSched 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind
  • They diverge on capability: MinePlan covers Life of mine planning, MineSched covers Production scheduling.
  • Prices and features above were last checked on 30 August 2026.

Where they differ

Only the attributes on which MinePlan and MineSched actually diverge.

Attributes where MinePlan and MineSched differ
AttributeMinePlanMineSched
Founded20081981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in MinePlan

  • Life of mine planning
  • Long-term scheduling
  • Economic modeling
  • Feasibility assessment
  • Excel

Only in MineSched

  • Production scheduling
  • Activity sequencing
  • Resource planning
  • Constraint handling
  • PCBC
  • SAP

Both cover

  • Scenario analysis
  • Vulcan
  • Surpac
  • Whittle
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

MinePlan

  • Life of mine planningnot MineSched
  • Long-term schedulingnot MineSched
  • Feasibility studiesnot MineSched
  • Economic analysisnot MineSched
  • Strategic planningnot MineSched

MineSched

  • Production planningnot MinePlan
  • Resource schedulingnot MinePlan
  • Equipment allocationnot MinePlan
  • Capacity planningnot MinePlan
  • Performance trackingnot MinePlan

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

MinePlan

  • The Internet Archive's capture of mineplan.com.au on 4 March 2020 already showed only a generic 'Website Coming Soon' hosting placeholder rather than a product page, indicating the domain has not hosted a live MinePlan site for at least several years.

MineSched

  • 3ds.com's MineSched page describes the product's scheduling features in detail but publishes no pricing, no named edition or tier, and no figure of any kind

Pricing, plan by plan

MinePlan

On request
  • MinePlan Standard$16000/year
    • Life of mine planning
    • Long-term scheduling
    • Economic analysis

MineSched

On request
  • MineSched Standard$12000/year
    • Production scheduling
    • Gantt charts
    • Resource allocation
  • MineSched Advanced$20000/year
    • Multi-scenario planning
    • Optimization tools
    • Advanced constraints

Which should you pick?

Choose MinePlan if

  • You need life of mine planning.
  • You work on Windows.
  • You also want long-term scheduling.

Choose MineSched if

  • You need production scheduling.
  • You work on Windows.
  • You also want activity sequencing.

Questions people ask

Is MinePlan or MineSched better?
Neither clearly leads. MinePlan starts at On request and MineSched at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, MinePlan or MineSched?
MinePlan starts at On request and MineSched at On request.
Does MinePlan or MineSched run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is MinePlan best used for?
MinePlan is most often used for life of mine planning, long-term scheduling, feasibility studies, economic analysis. Of those, life of mine planning and long-term scheduling are not what MineSched is typically brought in for.
What can MinePlan do that MineSched cannot?
MinePlan covers Life of mine planning, Long-term scheduling, Economic modeling, Feasibility assessment. MineSched covers Production scheduling, Activity sequencing, Resource planning, Constraint handling. Both handle Scenario analysis, Vulcan, Surpac, Whittle.

Answered from the vendors’ own pages

MineSched: Does GEOVIA MineSched publish pricing online?

No pricing information is available on the product page. Interested customers must contact Dassault Systèmes directly through their contact form or sales team to request pricing details.

Source
Share

Related pages

Other head to heads