Softwr

Software · head to head

Minemax vs Vulcan

Minemax logo

Minemax

Software

Integrated mining software for geological and operational excellence

From
On request
Rated
-
Vulcan logo

Vulcan

Software

Industry-standard 3D mine planning and modeling software

From
On request
Rated
-

The short version

  • Each has a real cost: Minemax minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range; Vulcan neither the Vulcan product page nor the Maptek store page shows a price, a licence term or a subscription length
  • They diverge on capability: Minemax covers Pit optimization, Vulcan covers Block modeling.

Where they differ

Only the attributes on which Minemax and Vulcan actually diverge.

Attributes where Minemax and Vulcan differ
AttributeMinemaxVulcan
Founded19951981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Minemax

  • Pit optimization
  • Datamine
  • Vulcan

Only in Vulcan

  • Block modeling
  • I-Site
  • MineSched

Both cover

  • Geological modeling
  • Mine design
  • Resource estimation
  • Production scheduling
  • Surpac
  • Leapfrog
  • SAP
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

Minemax

  • Strategic open pit and underground mine schedule optimisationnot Vulcan
  • Life of mine planning to maximise net present valuenot Vulcan
  • Operational short interval mine schedulingnot Vulcan

Vulcan

  • Geological modelling, block modelling and resource estimationnot Minemax
  • Open pit and underground mine design and schedulingnot Minemax
  • Grade control and geotechnical analysis at operating minesnot Minemax

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Minemax

  • minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range
  • No pricing is published for any Minemax product; licences are obtained by contacting the Datamine sales team
  • Products are sold as role based Planning Bundles rather than individual licences, with the claimed saving of up to 33 percent measured against standalone licence cost

Vulcan

  • Neither the Vulcan product page nor the Maptek store page shows a price, a licence term or a subscription length
  • Vulcan is a base product extended by nine paid add on modules covering geology and estimation, open pit design, underground design, scheduling, grade control and geotechnics, so the entry licence does not cover a full workflow
  • Buying requires going through the Maptek store or contacting Maptek directly for a quote

Pricing, plan by plan

Minemax

On request
  • Minemax Standard$13000/year
    • Geological modeling
    • Mine design
    • Resource estimation
  • Minemax Premium$23000/year
    • Advanced optimization
    • Production scheduling
    • Fleet management

Vulcan

On request
  • Vulcan Standard$8000/year
    • 3D modeling
    • Mine design
    • Block modeling
  • Vulcan Professional$15000/year
    • Advanced geostatistics
    • Resource estimation
    • Pit optimization
  • Vulcan Enterprise$25000/year
    • All modules
    • Custom solutions
    • Priority support

Which should you pick?

Choose Minemax if

  • You need pit optimization.
  • You work on Windows.
  • You also want datamine.

Choose Vulcan if

  • You need block modeling.
  • You work on Windows.
  • You also want i-site.

Questions people ask

Is Minemax or Vulcan better?
Neither clearly leads. Minemax starts at On request and Vulcan at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Minemax or Vulcan?
Minemax starts at On request and Vulcan at On request.
Does Minemax or Vulcan run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is Minemax best used for?
Minemax is most often used for strategic open pit and underground mine schedule optimisation, life of mine planning to maximise net present value, operational short interval mine scheduling. Of those, strategic open pit and underground mine schedule optimisation and life of mine planning to maximise net present value are not what Vulcan is typically brought in for.
What can Minemax do that Vulcan cannot?
Minemax covers Pit optimization, Datamine, Vulcan. Vulcan covers Block modeling, I-Site, MineSched. Both handle Geological modeling, Mine design, Resource estimation, Production scheduling.

Related pages

Other head to heads