Softwr

Mining & Resources · head to head

Minemax vs RPMGlobal TALPAC

Minemax logo

Minemax

Mining & Resources

Integrated mining software for geological and operational excellence

From
On request
Rated
-
RPMGlobal TALPAC logo

RPMGlobal TALPAC

Mining & Resources

Mine planning and optimization software for scheduling and economics

From
On request
Rated
-

The short version

  • Each has a real cost: Minemax minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range; RPMGlobal TALPAC rPMGlobal publishes no price, no licence model and no purchase route for TALPAC
  • They diverge on capability: Minemax covers Geological modeling, RPMGlobal TALPAC covers Long-term planning.

Where they differ

Only the attributes on which Minemax and RPMGlobal TALPAC actually diverge.

Attributes where Minemax and RPMGlobal TALPAC differ
AttributeMinemaxRPMGlobal TALPAC
Founded19951987

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining & Resources).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Minemax

  • Geological modeling
  • Mine design
  • Resource estimation
  • Production scheduling
  • Pit optimization

Only in RPMGlobal TALPAC

  • Long-term planning
  • Short-term scheduling
  • Economic evaluation
  • Scenario analysis
  • Optimization

Both cover

  • Datamine
  • Vulcan
  • Surpac
  • Leapfrog
  • SAP
  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

Minemax

  • Strategic open pit and underground mine schedule optimisationnot RPMGlobal TALPAC
  • Life of mine planning to maximise net present valuenot RPMGlobal TALPAC
  • Operational short interval mine schedulingnot RPMGlobal TALPAC

RPMGlobal TALPAC

  • Calculating truck and loader haulage productivity and cycle timesnot Minemax
  • Sizing a mining fleet against a required production ratenot Minemax
  • Comparing equipment options and haul road designs on cost per tonnenot Minemax

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Minemax

  • minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range
  • No pricing is published for any Minemax product; licences are obtained by contacting the Datamine sales team
  • Products are sold as role based Planning Bundles rather than individual licences, with the claimed saving of up to 33 percent measured against standalone licence cost

RPMGlobal TALPAC

  • RPMGlobal publishes no price, no licence model and no purchase route for TALPAC
  • TALPAC is sold in separate surface and underground versions rather than as one product
  • TALPAC covers haulage productivity only; scheduling and simulation require other RPMGlobal products such as XPAC and HAULSIM

Pricing, plan by plan

Minemax

On request
  • Minemax Standard$13000/year
    • Geological modeling
    • Mine design
    • Resource estimation
  • Minemax Premium$23000/year
    • Advanced optimization
    • Production scheduling
    • Fleet management

RPMGlobal TALPAC

On request
  • TALPAC Planning$16000/year
    • Long-term planning
    • Scenario analysis
    • Economic evaluation
  • TALPAC Optimization$26000/year
    • Advanced optimization
    • Real-time scheduling
    • Fleet management

Which should you pick?

Choose Minemax if

  • You need geological modeling.
  • You work on Windows.
  • You also want mine design.

Choose RPMGlobal TALPAC if

  • You need long-term planning.
  • You work on Windows.
  • You also want short-term scheduling.

Questions people ask

Is Minemax or RPMGlobal TALPAC better?
Neither clearly leads. Minemax starts at On request and RPMGlobal TALPAC at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Minemax or RPMGlobal TALPAC?
Minemax starts at On request and RPMGlobal TALPAC at On request.
Does Minemax or RPMGlobal TALPAC run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is Minemax best used for?
Minemax is most often used for strategic open pit and underground mine schedule optimisation, life of mine planning to maximise net present value, operational short interval mine scheduling. Of those, strategic open pit and underground mine schedule optimisation and life of mine planning to maximise net present value are not what RPMGlobal TALPAC is typically brought in for.
What can Minemax do that RPMGlobal TALPAC cannot?
Minemax covers Geological modeling, Mine design, Resource estimation, Production scheduling. RPMGlobal TALPAC covers Long-term planning, Short-term scheduling, Economic evaluation, Scenario analysis. Both handle Datamine, Vulcan, Surpac, Leapfrog.

Related pages

Other head to heads